Pre-Solicitation Notice for Septic System Installation – Solicitation 75H70126Q00036

This pre-solicitation notice announces an upcoming Total Small Business Set-Aside procurement for the installation of a replacement individual septic system for an existing home on fee land in Clark County, Washington. The project falls under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) with a $45 million size standard. Only small businesses with average annual revenue below $45 million for the last three years are eligible for award. The government anticipates solicitation release on or about October 1, 2026, with quotes due at least 30 calendar days thereafter. All solicitation documents will be posted on www.sam.gov with no hard copies available. The project will be procured as a Request for Quotes (RFQ) under FAR Part 13 and 36 procedures with price-only evaluation criteria.

The scope of work includes installation of 4-inch solid sewer pipe, underground two-way cleanout, 1,500-gallon concrete two-compartment septic tank with filter, 1,050-gallon concrete dosing tank with effluent pump and controls, auto flush headworks, 2-inch effluent lines, subsurface drip system drainfield per county-approved design, and disposal of the existing septic tank. The contractor is responsible for site investigation, utility location, all electrical work (requiring a Washington State licensed electrician), county permits and fees, and vegetative clearing. The contract type is Firm Fixed Price (FFP) with a 30 calendar day period of performance after notice to proceed. Construction magnitude is estimated between $25,000 and $100,000. TERO fees do not apply. A formal site visit is not planned, but interested parties may contact the homeowner directly. Registration in SAM is mandatory for award consideration.

View the file

Other files

File Type Posted
4-Aerial BrownJ.jpg JPG image
3-Technical Specifications combined.pdf PDF
2-DESIGN 8May2026.pdf PDF
1-Statement of Work.docx DOCX document
6-Measurement and Payment.pdf PDF
5-Site Photos.pdf PDF
7-US DOL WD WA20260099 Dated 5-18-2026.pdf PDF
B01 75H70126Q00036.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a PRE-SOLICITATION NOTICE. Solicitation 75H70126Q00036 will include for the installation of replacement individual septic system for an existing home on fee land in Clark County, WA. This project will be procured as a Total Small Business Set-Aside solicitation under North American Industry Classification System

(NAICS) code 237110 Water and Sewer Line and Related Structures Construction with a size standard of $45 million. The offeror must be a Small Business to be eligible for award.

The Government anticipates releasing the solicitation on or about 1 October 2026 timeframe with quotes due at least

30 calendar days after solicitation issuance. This date is subject to change. A full scope of work plans and specifications and Davis Bacon Wage Determination will be included in the solicitation documents. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at www.sam.gov for download by interested parties.

SCOPE OF WORK: This project is for the installation of a replacement individual septic system for an existing home on fee land in Clark County, WA.

The contractor shall install 4” solid sewer pipe; an underground two-way cleanout; a 1,500-gallon concrete two-compartment septic tank with filter; a 1,050-gallon concrete dosing tank with one dosing effluent pump, pump vault and controls; auto flush headworks; 2” effluent supply and return line; subsurface drip system drainfield with 2” manifold and vacuum relief valve per County-approved design; pump and dispose of existing septic tank offsite.

Further investigation of the site is the responsibility of the Contractor. Location of utilities are the responsibility of the Contractor. All electrical work is the responsibility of the Contractor and must be completed by an Electrician licensed in Washington State. All County permits and fees are the responsibility of the Contractor.

Vegetative clearing is the responsibility of the Contractor, including brush and small-diameter trees. Homeowners will remove non-vegetative debris from construction area prior to construction.

TERO: TERO fees do NOT apply.

CONSTRUCTION DURATION: Period of Performance is 30 calendar days after issuance of a Notice to Proceed.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $25,000 and $100,000.

SITE VISIT: A formal site visit is not planned. Please see Section L and contact homeowner directly should one be desired. Information on how to visit the site will be provided within the official solicitation under FAR 52.236-2.

CONTRACT TYPE: The IHS intends to award a Firm Fixed Price (FFP) construction contract in support of this requirement.

NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.

For the purposes of this procurement, a concern is considered a small business if its average annual revenue for the last three (3) years is less than $45.0 million. For information concerning NAICS and SBA size standards, go to www.sba.gov.

It is the responsibility of the contractor to check www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at the website for download by interested parties.

This solicitation will be procured as a Request for Quotes (RFQ) in accordance with FAR Part 13 and 36 procedures with price only evaluation criteria.

http://www.sam.gov/ http://www.sba.gov/ http://www.sam.gov/

NOTE: Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at:

https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

This notice is for informational purposes only and is NOT a request for submission of offers. No other information is available until issuance of the solicitation itself. No bidder list is maintained. All potential bidders should register with https://www.sam.gov if interested in this forthcoming acquisition.

https://www.sam.gov/ https://www.sam.gov/

File details come from the government source that posted it. Updated .