This document is Standard Form 30 (Amendment of Solicitation/Modification of Contract) for a subsurface drip drainfield construction project administered by Indian Health Services (IHS), Division of Engineering Services (DES) in Dallas, Texas.
Project Overview and Key Details:
The amendment (A00001) was issued on October 22, 2026, for Solicitation No. 75H701-26-Q-00036, Project No. PO-22-D02L. The amendment provides government responses to five contractor questions regarding the septic system installation work. The proposal deadline remains October 30, 2026, at 2:00 PM CDT, and all other terms and conditions remain unchanged. Contractors must acknowledge receipt of this amendment by number and date on their cover letter or by submitting a signed copy of the SF30.
Government Responses to Contractor Questions:
The government clarified that no as-built drawings exist for the existing septic tank; the tank appears to be concrete construction from approximately the 1940s, but capacity, dimensions, and steel reinforcement presence are unconfirmed. Bidders must base estimates on the plan set provided (page 6 of the design). The approximately 200 linear feet of 2-inch PVC supply and return piping represents the approximate trench route length, not total pipe footage. The contractor is responsible for obtaining all required permits and paying all associated fees, which must be included in applicable bid line items. Designer inspection and record drawing fees are covered by the government's contract with the designer; however, the contractor must pay any final inspection fees to the County and coordinate all inspections with the designer and/or County. Bidding contractors must complete their questions no later than 2:00 PM CST on October 23, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-DESIGN 8May2026.pdf | ||
| 1-Statement of Work.docx | DOCX document | |
| 4-Aerial BrownJ.jpg | JPG image | |
| 7-US DOL WD WA20260099 Dated 5-18-2026.pdf | ||
| 3-Technical Specifications combined.pdf | ||
| A11 Pre-Solicitation SAM Notice.pdf | ||
| B01 75H70126Q00036.pdf | ||
| 5-Site Photos.pdf | ||
| 6-Measurement and Payment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED 16C. DATE SIGNED
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
A00001
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project No. PO-22-D02L, Jennifer Brown (COW), Amendment A00001.
1. The purpose of this amendment is to provide the following: Government responses to the contractor's questions received-in, via email to the solicitation, pages 2-3.
2. The solicitation's proposal (bid) date remains unchanged at October 30, 2026 @ 2:00pm CDT.
3. All other terms and conditions remain unchanged and in full effect.
Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433
Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433
10A. MODIFICATION OF CONTRACT/ORDER NO.
5. PROJECT NO. (If applicable)
PO-22-D02L
PAGE OF PAGES
10B. DATED (SEE ITEM 13)
3. EFFECTIVE DATE
10-22-2026
75H701-26-Q-00036
10/1/2026 is not extended.
One (1)
X
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
X X
ROBERT S. MILLER
romiller Cross-Out
Jennifer Brown (COW) Solicitation No.: 75H70126Q00036 A00001
Contractor Questions and Government Responses (bolded below), Dated 21 October 2026, Jennifer Brown
(COW):
1. Existing Septic Tank Information
Can you confirm the construction material of the existing septic tank (concrete, fiberglass, plastic, or other)? If available, could you also provide its approximate capacity, dimensions, and whether it contains steel reinforcement?
ANSWER: No as-built drawings are available for the existing septic system; therefore, the septic tank’s capacity and dimensions are unknown. The tank appears to be constructed of concrete, but the presence of steel reinforcement has not been confirmed. The homeowner believes the system was installed in the 1940s;
however, the installation date cannot be verified.
2. Drainfield Capping Fill
The Measurement and Payment document specifies 6 inches of sandy loam or silt loam capping fill extending 10 feet beyond the dripline corners. Can you confirm the total square footage requiring capping fill, or provide an estimated quantity?
ANSWER: Bid should be based upon information in the plan set. Please refer to the plan view and drip-field cross section on page 6 of the design.
3. Supply and Return Piping
The documents reference approximately 200 linear feet of 2-inch PVC supply and return piping. Is this the combined length of both pipes, or does it represent the approximate trench route length with separate supply and return lines?
ANSWER: Section 6. SUBSURFACE DRIP DRAINFIELD (INCLUDES HEADWORKS AND
TRANSPORT LINES) & CLEARING of the Measurement and Payment Document: “Installation of supply and return lines: all pipe and fittings for 2” PVC Sch 40 supply and return lines (approximately 200’, as shown in the Design, installer to confirm lengths before construction)…” refers to the approximate length of trench for the supply and return lines, not the LF of pipe required. Please see the plan view on page 6 of the design.
4. Septic Permit Responsibility
The Technical Specifications indicate that the Government will secure applicable sewage disposal permits, while the
Statement of Work assigns permit responsibilities and fees to the contractor. Can you clarify whether the septic construction permit has already been obtained and paid for, and which remaining permit fees are the contractor's responsibility?
ANSWER: The Government has NOT obtained the septic construction permit. The Contractor shall obtain all required permits and pay all associated fees. These costs shall be included in the applicable bid line item, as specified in the Measurement and Payment and Statement of Work documents.
5. Inspections and Record Drawings
Are the required septic installation inspections, designer inspections, and final record drawings included in the existing project arrangements, or is the contractor responsible for independently arranging and paying for these services?
Jennifer Brown (COW) Solicitation No.: 75H70126Q00036 A00001
ANSWER: Fees for the Designer’s final inspection and record drawings are included in the Government’s contract with the Designer. The Contractor shall be responsible for any final inspection fees payable to the
County. The Contractor shall coordinate all required inspections with the Designer and/or the County, as applicable.
*As stated within the solicitation, inquiries (questions) must be received no later than 2:00pm CST on 23 October
2026 to allow time for response(s). After which, no further questions are guaranteed to be answered*
NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.
| Standard Detailed Drawings WPS Enclosure.pdf |
| WELL-Model.pdf |
| Sheets and Views |
| Model |
| ADP2A03.tmp |
| M96 Bid Abstract |
| ADP675E.tmp |
| Bid Schedule |
| B05 PLANSET - Miller Heights Sewer Main Replacement (Revised 3-1-2021) (signed).pdf |
| Sheets and Views |
| Miller Heights sewer main030121-COVER & LOCATION |
| Miller Heights sewer main030121-11x17 Notes and Legend |
| Miller Heights sewer main030121-11X17 Abbreviations |
| Miller Heights sewer main030121-PROPOSED |
| Miller Heights sewer main030121-DETAILS |
| Miller Heights sewer main030121-DETAILS (2) |
| B05 TECHNICAL SPECIFICATIONS - Miller Heights Sewer Replacement (revised 3-1-2021) (signed).pdf |
| 00 01 01 Project Title Page |
| CONFEDERATED TRIBES OF WARM SPRINGS |
| INDIAN RESERVATION |
| JEFFERSON COUNTY, OREGON |
| CONTRACT DOCUMENTS |
| INDIAN HEALTH SERVICE |
| OFFICE OF ENVIRONMENTAL HEALTH |
| AND ENGINEERING |
| PORTLAND AREA OFFICE |
| WESTERN OREGON FIELD OFFICE |
| FEBRUARY 2020 |
| 00 01 10 Table of Contents - 20-M96 |
| VOLUME I |
| Division 00 – Procurement and Contracting Requirements |
| Division 01 – General Requirements |
| Division 31 – Earthwork |
| Division 33 – Utilities |
| 01 11 00 Summary of Work - 20-M96 |
| PART 1 - GENERAL |
| 1.01 SUMMARY |
| A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings: |
| B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon |
| C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per... |
| 1.02 WORK REQUIRED |
| A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a... |
| B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo... |
| 3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes. |
| C. Sewer Main Replacement is shown on the drawings. |
| 1.03 SITE CONDITIONS |
| A. Utilities |
| 1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor... |
| a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/ |
| 2. Protect existing utilities during construction. |
| 3. Immediately notify project engineer and the utility owner of any damaged utilities. |
| 4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.) |
| B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s... |
| 2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency |
| 3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/ |
| C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms. |
| D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe. |
| E. Site Ownership 1. The construction site is entirely located inside the Warm Springs Indian Reservation and on the land controlled by the Warm Springs Tribe. |
| 1.04 SEQUENCE OF WORK |
| A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh... |
| 01 27 00 Price & Payment - 20-M96 |
| PRICE AND PAYMENT |
| PART 1 - GENERAL |
| PART 2 – BID SCHEDULE ITEMS |
| A. SCHEDULE |
| 1. Mobilization: |
| 2. ODOT Permitting and Traffic Control: |
| 3. Removal and Disposal of Contaminated Soils: |
| 4. Temporary Erosion and Sediment Control: |
| 5. Temporary Sewage Bypass Pumping: |
| 6. Connections to Existing Manholes: |
| 7. PVC Sanitary Sewer Pipe, 8 In. Diam.: |
| 8. Fencing Repairs and Site Restoration: |
| 01 31 00 Project Management and Coordination - 20-M96 |
| PROJECT MANAGEMENT AND COORDINATION |
| PART 1 - GENERAL |
| END OF SECTION |
| 01 33 00 Submittal Procedures - 20-M96 |
| SUBMITTAL PROCEDURES |
| PART 1 - GENERAL |
| END OF SECTION |
| 01 42 00 References - 20-M96 |
| REFERENCES |
| PART 1 - GENERAL |
| B. Federal Agencies |
| C. State Agencies |
| END OF SECTION |
| American Association of State Highway and |
| American Water Works Association (AWWA) |
| 01 43 00 Quality Assurance-Quality Control - 20-M96 |
| QUALITY ASSURANCE/QUALITY CONTROL |
| PART 1 - GENERAL |
| END OF SECTION |
| 01 50 00 Temporary Facilities and Controls - 20-M96 |
| TEMPORARY FACILITIES AND CONTROLS |
| PART 1 - GENERAL |
| PART 2 – PRODUCTS (NOT APPLICABLE) |
| PART 3 - EXECUTION |
| END OF SECTION |
| 01 77 00 Closeout Procedures - 20-M96 |
| CLOSEOUT PROCEDURES |
| PART 1 - GENERAL |
| END OF SECTION |
| 01 78 00 Closeout Submittals - 20-M96 |
| CLOSEOUT SUBMITTALS |
| PART 1 - GENERAL |
| PART 2 – PRODUCTS (NOT APPLICABLE) |
| PART 3 - EXECUTION |
| END OF SECTION |
| 31 23 10 Excavation,Trenching, & Backfill - 20-M96 |
| SECTION 31 23 10 |
| EXCAVATION, TRENCHING AND BACKFILL |
| PART 1 - GENERAL |
| A. This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to concrete sewer manholes, piping, and other structures. |
| 1.05 QUALITY ASSURANCE |
| PART 2 – PRODUCTS |
| PART 3 - EXECUTION |
| END OF SECTION |
| 31 25 00 Erosion and Sediment Control - 20-M96 |
| PART 1 - GENERAL |
| PART 2 - PRODUCTS |
| Sieve Size Percent Passing |
| PART 3 – EXECUTION |
| END OF SECTION |
| 33 01 31 Temporary Sewer Bypass - 20-M96 |
| TEMPORARY SEWER BYPASS |
| PART 1 - GENERAL |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| END OF SECTION |
| 33 30 00 Sanitary Sewerage - 20-M96 |
| SANITARY SEWERAGE |
| PART 1 - GENERAL |
| PART 2 - PRODUCTS |
| A. Manholes: |
| 1. Concrete compressive strength will meet or exceed 4000 pounds per square inch at 28 days. |
| B. Sewer Pipe Connection: |
| 1. Connect pipes using a rigid watertight pipe adapter gasket conforming to ASTM C1173 and ASTM D5926. |
| 2. Gasket |
| a. Manufactured to meet the material requirements of: |
| 1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems |
| 2) ASTM D5926 – Poly (Vinyl Chloride) (PVC) Gaskets for Drain, Waste, and Vent (DWV), Sewer, Sanitary, and Storm Plumbing Systems |
| 3) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe |
| 3. Clamps |
| a. Manufactured to meet the material requirements of: |
| 1) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe |
| 4. Shear Ring |
| a. Length manufactured according to coupling diameter. |
| b. Clamps spot welded in place. |
| 5. Couplings |
| a. Manufactured to conform to the performance requirements of: |
| 1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems |
| 2) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe |
| b. Maximum Test Pressure: 4.3 PSI |
| c. Maximum Operating Temperature: 140 F non-consistent |
| PART 3 - EXECUTION |
| END OF SECTION |
| 00 01 01 Project Title Page.pdf |
| CONFEDERATED TRIBES OF WARM SPRINGS |
| INDIAN RESERVATION |
| JEFFERSON COUNTY, OREGON |
| CONTRACT DOCUMENTS |
| INDIAN HEALTH SERVICE |
| OFFICE OF ENVIRONMENTAL HEALTH |
| AND ENGINEERING |
| PORTLAND AREA OFFICE |
| WESTERN OREGON FIELD OFFICE |
| FEBRUARY 2020 |
| 01 11 00 Summary of Work - 20-M96.pdf |
| PART 1 - GENERAL |
| 1.01 SUMMARY |
| A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings: |
| B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon |
| C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per... |
| 1.02 WORK REQUIRED |
| A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a... |
| B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo... |
| 3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes. |
| C. Sewer Main Replacement is shown on the drawings. |
| 1.03 SITE CONDITIONS |
| A. Utilities |
| 1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor... |
| a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/ |
| 2. Protect existing utilities during construction. |
| 3. Immediately notify project engineer and the utility owner of any damaged utilities. |
| 4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.) |
| B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s... |
| 2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency |
| 3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/ |
| C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms. |
| D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe. Use of Oregon DOT right-of-way to access site shall be coordinated with ODOT. |
| E. Site Ownership 1. The construction site is located inside the Warm Springs Indian Reservation along a utilities easement owned by the Warm Springs Tribe. The site access along OR HWY 26 requires permitting and coordination with ODOT. |
| 1.04 SEQUENCE OF WORK |
| A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh... |
| 01 27 00 Price & Payment - 20-M96.pdf |
| PRICE AND PAYMENT |
| PART 1 - GENERAL |
| PART 2 – BID SCHEDULE ITEMS |
| A. SCHEDULE |
| 1. Mobilization: |
| 2. ODOT Permitting and Traffic Control: |
| 3. Removal and Disposal of Contaminated Soils: |
| 4. Temporary Erosion and Sediment Control: |
| 5. Temporary Sewage Bypass Pumping: |
| 6. Connections to Existing Manholes: |
| 7. PVC Sanitary Sewer Pipe, 8 In. Diam.: |
| 8. Fencing Repairs and Site Restoration: |
| ADPB9F1.tmp |
| Sheet2 |
| ADP8A0B.tmp |
| Sheet2 |