Statement of Work Summary: Northern Cheyenne Service Unit – Automatic Door Preventative Maintenance Services
This Statement of Work defines requirements for a contractor to provide semi-annual preventative maintenance and replacement of consumable parts for automatic doors at the Northern Cheyenne Service Unit in Lame Deer, Montana. The contractor must service four Horton bi-parting automatic sliding doors, one Horton single automatic sliding door, two Horton 7000 simultaneous-pair ADA operators, and twelve Horton 7000 single ADA operators. One of the two annual inspections must be an AAADM annual inspection. All parts must be OEM parts from Horton Automatics; rebuilt parts are not acceptable. Maintenance activities include inspection of mechanical, electrical, and safety components; cleaning and lubrication; adjustment of door speeds, closing forces, hold-open times, and sensor ranges; verification of safety-sensor operation and ADA compliance; identification of replacement components; and provision of written cost estimates for Government approval prior to parts replacement. Parts pricing shall be invoiced at manufacturers' list price and invoiced separately.
The contractor must schedule semi-annual PM visits as close as possible to October and March each year, coordinating with the Facilities Maintenance Supervisor at least two weeks in advance. Electronic service reports must be submitted within five business days of each visit, including date of service, detailed maintenance descriptions, parts replaced per door, adjustments made, deficiencies, safety concerns, and recommendations for future maintenance. The contractor must be actively engaged in commercial automatic door service with a minimum of five years documented experience, hold current AAADM certification, demonstrate experience servicing Horton equipment, and provide 24/7/365 emergency on-call service with two-hour onsite response capability. The performance period runs from July 1, 2026, through June 30, 2027, with four optional one-year extensions through June 30, 2031, all subject to Government option exercise under FAR 52.217-9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_75H70926Q00008.pdf | ||
| Sol_Section B Continuation.pdf | ||
| A2_Price Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
1. Project Title
Northern Cheyenne Service Unit – Automatic Door Preventative Maintenance Services
2. Introduction
This Statement of Work (SOW) defines the requirements for a qualified contractor to provide semi‑annual preventative maintenance (PM) and replacement of required consumable parts for automatic doors located at the Northern Cheyenne Service Unit (NCSU). The objective is to ensure safe, reliable, and ADA‑compliant operation of all automatic doors, reduce unplanned downtime, and support energy‑efficient facility operations.
3. Background
The Northern Cheyenne IHS Service Unit utilizes multiple automatic doors to support patient access, maintain ADA compliance, and ensure efficient movement throughout the facility. Properly functioning automatic doors are essential for patient safety, staff workflow, and facility energy management. Successful contractors highlight the importance of these doors for smooth patient flow, security and energy efficiency. Failure of these doors can significantly disrupt patient movement, patient and staff security and increase utility costs. Regular preventative maintenance is necessary to prevent breakdowns and ensure continuous, efficient operation.
4. Scope of Work
The Contractor shall furnish all labor, tools, consumables, equipment, transportation, and supervision necessary to perform manufacturer‑recommended preventative maintenance on a semi‑annual basis for the following equipment. One of the semiannual inspections will be an AAADM annual inspection. Any parts required must be OEM parts from Horton Automatics. Rebuilt parts are not acceptable.
• Four (4) Horton bi‑parting automatic sliding doors
• One (1) Horton single automatic sliding door
• Two (2) Horton 7000 simultaneous‑pair ADA operators
• Twelve (12) Horton 7000 single ADA operators
One of the semiannual inspections will be an AAADM annual inspection. Any parts required must be OEM parts from Horton Automatics. Rebuilt parts are not acceptable.
All work shall comply with AAADM standards, manufacturer specifications, and applicable federal regulations.
Contractor shall define what are consumable parts for above listed doors, operators.
5. Tasks and Deliverables
Semi‑Annual Preventative Maintenance/Annual AAADM Inspection
The Contractor shall perform a complete PM service on each door, including but not limited to:
• Inspection of all mechanical, electrical, and safety components
• Cleaning of tracks, sensors, guide rails, and operator housings
• Lubrication of moving parts per manufacturer specifications
• Adjustment of door speeds, closing forces, hold‑open times, and sensor ranges
• Verification of proper safety‑sensor operation and ADA compliance
• Identify any components requiring replacement
• Provide written documentation and cost estimates for Government approval prior to replacement. Parts pricing to be invoiced at manufacturers list price and invoiced separately
• Conduct Annual AAADM Inspection and provide on door decal with date of completion and technician information
• Provide remote technical support as needed throughout the contract period.
6. Schedule
Semi‑annual PM visits shall be scheduled as close as possible to October and March each year. The Contractor shall coordinate all dates with the Facilities Maintenance Supervisor at least two weeks in advance.
7. Access and Coordination
• The Contractor shall be granted facility access as required to complete the work
• Work shall be scheduled to minimize disruption to patient care and staff operations
• No access will be granted on federal holidays
• The Facilities Maintenance Supervisor or designee will assist with access to specific door locations
8. Reporting Requirements
After each site visit, the Contractor shall provide an electronic service report that includes:
• Date(s) of service
• Detailed description of maintenance performed
• List of parts replaced per door
• Adjustments made to door operation
• Any deficiencies, safety concerns, or recommended corrective actions
• Recommendations for future maintenance or upgrades
• AAADM Inspection decals to be placed per door
• Reports shall be submitted within five (5) business days of each visit
9. Acceptance Criteria
• All automatic doors must operate smoothly, safely, and in accordance with manufacturer specifications
• All doors must meet ADA requirements and pass safety‑sensor verification
• All deficiencies identified during service must be corrected if possible or documented with recommended actions
10. Place of Performance
Northern Cheyenne Service Unit
420 North Cheyenne Avenue
Lame Deer, Montana 59043
11. Contractor Qualifications
The Contractor shall:
• Be actively engaged in commercial automatic door installation, service, and maintenance
• Possess a minimum of five (5) years of documented experience
• Hold current AAADM certification for technicians performing work
• Demonstrate experience servicing Horton equipment and other major manufacturers
• Ability to provide emergency On-Call service 24/7/365 and be able to be onsite within 2 hours of notification
12. Period of Performance
If the Government exercises options under FAR 52.217‑9, the ordering period shall be:
• Base Year: 07/01/2026 – 06/30/2027
• Option Year 1: 07/01/2027 – 06/30/2028
• Option Year 2: 07/01/2028 – 06/30/2029
• Option Year 3: 07/01/2029 – 06/30/2030
• Option Year 4: 07/01/2030 – 06/30/2031