A1 - Statement of Work.docx

DOCX document 47 KB Posted

Attached to
HAAS UMC 750 CNC Machines - Sole Source
Solicitation number
FA448425Q0043
Issued by

About this file

This is a Statement of Work for the acquisition of a 5-Axis CNC machine by the 305th Maintenance Squadron's Aircraft Metals Technology Team. The Department of the Air Force Air Mobility Command requires a brand new HAAS UMC-750 5-Axis Vertical Machining Center with specific technical specifications including a 30" x 20" x 20" work envelope, integrated 2-axis trunnion rotary table, 40 taper spindle, 30 hp vector drive at 8,100 rpm, 30+1 side-mount tool changer, and wireless intuitive probing system. The controller must include features such as CNC control cabinet cooler, touch screen control, Ethernet interface, and 1 GB program memory, along with additional components including 32 GB memory, WiFi camera, through spindle coolant, and a 20-piece toolholder kit.

The equipment must be delivered to 2201 Grissom Road, JBMDL, McGuire AFB, NJ 08641 by September 30, 2025, with delivery coordination through the Aircraft Metals Technology team at 609-754-2676. Installation and commissioning services will be provided by Phillips Federal (410-564-2900), whose certified technician will complete electrical verification, final leveling, controller updates, machine energizing, operational checks, and geolocation within one business day. The Aircraft Metals Technology team will handle receiving, uncrating, rigging, rough leveling, and utility connections but must not apply power before commissioning. All work must adhere to Phillips Federal, Haas, and military base safety standards, with the technician requiring base escort coordination prior to arrival.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Acquisition for 305th Maintenance Squadron’s Aircraft Metals Technology Team 5-Axis CNC Machine – HAAS UMC-750

1. Requirements. The 305 Operations Group urgently requires a HAAS UMC-750 5-axis CNC machine.

2. Scope of Work. The vendor shall furnish all equipment unless otherwise specified. No alteration, additions or deletions shall be made to the contract unless prior approval is given in writing by the Contracting Officer (CO).

3. Requirements. The required equipment must meet the specifications of the following listed items. The delivered items must be brand new. Refurbished or used items are not authorized.

a. HAAS UMC-750 5-Axis Vertical Machining Center

i. 30" x 20" x 20" (762 x 508 x 508 mm) with integrated 2-axis trunnion rotary table

ii. Spindle Nose to Table (Min/Max) 4.0"- 24.0"

iii. B-Axis Tilt: +120/-35 degrees

iv. C-Axis Rotation: 360 degrees

v. Platter Dia: 19.7"

vi. Precision Rotary Scales

vii. 40 taper spindle

viii. 30 hp (22.4 kW) vector drive, 8,100 rpm, 90 ft-lb @2000 rpm, inline direct-drive

ix. Electronic Thermal Compensation to compensate for the expansion and contraction of each linear axis.

x. 30+1 Side-Mount Tool Changer

xi. 900 ipm rapids (X, Y, Z)

xii. 650 ipm max cutting

xiii. Wireless Intuitive Probing System

1. Machine Weight 14,250 lb

2. Max Machine Footprint: 158.0"W x124.1"D x 123.2"H

3. 55-gallon (208 liter) flood coolant system

4. Top Cover w/Mist Extraction Provision

b. Controller Features:

i. CNC Control Cabinet Cooler

ii. Touch Screen Control Media Display M-Code 130

iii. Early Power Failure Detection Module

iv. Ethernet Interface

v. Large Touch Screen Jog Remote

vi. Rigid Tapping

vii. 1 GB Program Memory Safe Run

viii. Self-Diagnostics USB Port

ix. Memory Lock Keyswitch

x. Dynamic Work Offsets and Tool Center Point Control

xi. Second Home Position Tool Life Management Power Surge Protection

c. MISC:

i. 1 Year Warranty

ii. Std 230V, 3phz

d. Additional Features:

i. 32 GB Memory

ii. 15K-30HP-40Taper-IN-VF Drive Spindle

iii. Wifi Camera

iv. Through Spindle Coolant

v. Automatic Coolant refill Center

vi. Anchoring Kit

vii. Coolant Tank Oil Skimmer

viii. 20 pcs toolholder kit

ix. Heavy Duty, low-voltage power transformer

4. Delivery.

a. Delivery Address:

i. Machine and any additional components will be shipped to 2201 Grissom Road, JBMDL, McGuire AFB, NJ 08641.

ii. All documentation (packing slips, shipping details) will reference this delivery location.

b. Driver Notification:

i. The delivery driver will contact the requestor, Aircraft Metals Technology team at 609-754-2676 upon arrival to coordinate receipt of the machine and any additional components.

5. Receiving Process. The requesting work center, Aircraft Metals Technology, will be responsible for accepting and verifying the delivered machine and any components against the shipment documentation.

6. Machine Placement & Commissioning.

a. Once delivery is complete, Aircraft Metals Technology will receive, uncrate, rig, rough level, and connect to utilities. Do Not Apply Power to the machine. Aircraft Metals Technology will contact Phillips Federal at 410-564-2900 to arrange for machines commissioning services.

b. Phillips Federal will schedule a certified technician to come onsite and complete the commissioning of the machine. The commissioning includes verification of the electrical connections, final levelling, review and updating of the controller (if applicable), energizing the machine, operationally checking the machines spindle and axis drives, and geolocating the machine.

7. Installation.

a. Base Escort Coordination. The company technician will contact the Aircraft Metals Technology team at 609-754-2676 prior to arrival for escort access to the base.

b. Commission Machine. Phillips Federal will schedule a certified technician to come onsite and complete the commissioning of the machine which includes the following:

i. Verification of the electrical connections

ii. Final levelling

iii. Review and updating of the controller software (if applicable)

iv. Energizing the machine

v. Operationally checking the machines spindle and axis movements

vi. Geolocating the machine.

8. Additional Requirements.

a. All installation and delivery shall be completed before 30th of September 2025.

b. All work will adhere to Phillips Federal, Haas, and applicable military base safety standards.

c. The technician will complete the service in 1 business days.

d. The process will not generate any hazardous waste.

e. If any trash is generated from the service, the Aircraft Metals Technology team will discard it.

Classified as Hypertherm Inc. - Business Use - This document contains information that is proprietary or confidential to Hypertherm, Inc.

Classified as Hypertherm Inc. - Business Use - This document contains information that is proprietary or confidential to Hypertherm, Inc.

File details come from the government source that posted it. Updated .