This is a Performance Work Statement (PWS) for fuel pit lid removal and installation services at Joint Base Pearl Harbor-Hickam, Hawaii, issued for the 735 Aircraft Maintenance Squadron (AMS).

The contractor shall remove a damaged fuel pit lid from Aircraft Parking Spot 22B and a serviceable fuel pit lid from Spot 21D, then install the serviceable lid from 21D into Spot 22B. The contractor is responsible for all labor, supervision, materials, tools, equipment, and associated costs necessary to complete removal and installation tasks. Work must commence no later than 10 business days following contract award and be fully completed, accepted by the Government, and invoiced by September 4, 2026. The project will be awarded competitively based on total project cost. Services include product transportation, installation per customer specifications and manufacturer guidelines, environmental controls compliance, waste disposal and recycling, inspection to ensure lids are free of defects, and coordination of post-installation walkthroughs. The contractor must designate a Contract Manager and Project Manager within 10 business days of award and maintain continuity with 735 AMS at Building 2028, 355 Mamiya Avenue, JBPHH, HI 96853, during standard business hours (0730–1630, Monday–Friday, excluding federal holidays). Any electrician provided must be licensed and paid per Davis-Bacon wage determination HI20260001. Base access requirements include DBIDS passes, completion of SECNAV 5512-1 and JB2 Form 0-180 security forms, and entry through the Halawa Commercial Gate with current vehicle registration, proof of insurance, and valid driver's licenses. Performance objectives include no more than one customer complaint per removal and installation with 24-hour resolution, no more than one complaint during installation/removal with 48-hour resolution, and zero unresolved punch list items prior to project completion.

View the file

Other files

File Type Posted
A6 - RFP Questions and Answers.pdf PDF
A4 - Price Proposal Spreadsheet.xlsx XLSX spreadsheet
A3 - DBAWD.pdf PDF
A2 - Provisions and Clauses.pdf PDF
A5 - RFP - 735 AMS FUEL DOOR.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

CUI

735 AMS Performance Work Statement (PWS)

Fuel Pit Lid Swap and Installation

Version 1.3

Joint Base Pearl Harbor-Hickam, USA

28 July 2026

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

CUI

Table of Contents

1.0 Background

2.0 Scope

3.0 Period of Peformance

4.0 Description of Work

4.1 General Services

4.2 Assembly, Installation and Removal Work

4.3 Inspection/Acceptance Checklist

5.0 Government Furnished Support

6.0 Site Conditions

7.0 Voluntary Protection Program (VPP)/Safety

8.0 Base/Installation Specifics

9.0 Deliverables (CDRLs)

10.0 Performance Objective Summary

11.0 Attachments

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

1.0 Background

This Performance Work Statement (PWS) facilitates the removal of two fuel pit lids and the replacement of one.

The contractor shall remove the damaged fuel pit lid from spot 22B, remove the working fuel pit from 21D, and place the working fuel pit lid on spot 22B for the 735 AMS. This includes the necessary parts, equipment, and labor to execute the task. The Contractor shall provide labor, supervision, materials, tools, and equipment necessary for the removal and installation of the existing fuel pit lids to support this requirement. The contractor shall provide installation and cleanup of materials. The contractor shall inform the Contracting Officer immediately if any unforeseen circumstances arise.

2.0 Scope

This project is to provide the removal and installation of customer installed/provided fuel pit lids and will be awarded on a competitive basis using total project cost.

A site visit may be requested if needed.

For this project we require the following items to be removed and installed:

Aircraft Parking Spot 22B Remove damaged fuel pit lid Install serviceable fuel pit lid from spot 21D

Aircraft Parking Spot 21D Remove serviceable fuel pit lid

It is the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. Assistance will be provided from the customer that meets the customer requirements and accommodates the physical environment for consideration as part of proposal.

The customer may assist with equipment if they have it available.

3.0 Period of Performance

Project start date must be no later than 10 business days following contract award, and all deliverables, services, and associated tasks under this Performance Work Statement (PWS) must be fully completed, accepted by the Government, and invoiced no later than September 4, 2026.

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

4.0 Description of Work

4.1 General Services

Coordination and management of all product, equipment and people required to remove and install fuel pit lids within an Air Force location. This includes the aircraft fuel pit lids located on the Hickam Airfield at parking spots 22B and 21D.

4.1.1 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, incidentals and all other items and services necessary to remove and install the fuel pit lids.

4.1.2 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Performance Work Statement (PWS).

4.1.3 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.

4.1.4 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer (CO) and the Contracting Officer Representative (COR) within 10 business days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.

4.1.5 The contractor shall provide a Project Manager responsible for project site management, scheduling, coordination and technical assistance to the Air Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.

4.1.6 Any electrician provided by the contractor shall be a licensed electrical contractor. The electrician will be paid in accordance with Davis-Bacon wage determination HI20260001.

4.1.7 The contractor shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state/federal identification complying with the REAL ID Act, to meet local Air Force security requirements. (Please note that many installations require this information be coordinated days in advance).

4.1.8 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.

4.1.9 The contractor shall manage removal and installation of the fuel pit lids to final acceptance by the COR.

4.1.10 The contractor shall provide customer service during normal duty hours, 0730-1630 hours, Monday through Friday; except for federal holidays.

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

4.1.11 Recognized US Federal Holidays are as follows: New Year’s Day, Birthday of Martin Luther King Jr., Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.

4.1.12 When the contractor desires to work other than standard times, a written request shall be submitted to the COR for approval. Written approval and/or a contract modification from the CO must be received before proceeding with the work. The request shall be submitted at least five (5) workdays prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.

4.1.13 The contractor shall provide alternate work locations for employees or allow employees to take vacation during designated Government non-workdays or other periods where government offices are closed.

4.1.14 All Air Force inquiries shall be responded to by a contractor representative within two business days.

4.1.15 Meetings may periodically be held between base personnel and contractor management to discuss contract status. The COR will notify the contractor in writing in advance of the place and time of required meetings and notify and include the CO as needed.

4.1.16 The contractor shall be responsible for coordination of an escort through any controlled areas through the local COR.

4.1.17 Lost vehicle and entry passes shall be reported immediately to the Security Police as well as the COR in accordance with the local security forces policy.

4.1.18 The contractor shall be responsible for any storage of all equipment, parts and assemblies prior to and during removal and installation in accordance with the agreed upon schedule.

4.1.19 The contractor shall maintain continuity between the support operations at the 735 AMS, Bldg 2028, 355 Mamiya Ave, JBPHH, HI, 96853 and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract. The contractor shall, as a minimum, maintain a single point of contact for this effort to be available in person to the 735 AMS, during the same business day.

4.1.20 The contractor shall provide for the management and support of personnel, to include: making necessary arrangements for employees required to travel; supporting personnel co-located on 735 AMS, Bldg 2028, 355 Mamiya Ave, JBPHH, HI, 96853 and other locations specified with additional resources, expertise, advice; necessary infrastructure to support work to be accomplished off-base; conducting personnel meetings;

providing administrative support for employees in a timely fashion; and providing facility and staff security requirements.

4.1.21 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

4.2 Assembly, Installation and Removal Work

Qualified professionals to remove and install fuel pit lids per the provided drawings.

4.2.1 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence throughout removal and installation unless agreed to by the COR.

4.2.2 The contractor representative shall meet with COR to review the installation plans prior to installation.

4.2.3 The contractor shall remove and install fuel pit lids in accordance with each requirement statement and basic plan provided by the customer.

4.2.4 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.

4.2.5 During removal and installation, the contractor shall protect the fuel pit lids from further damage. Contractor shall not repair damage to fuel pit lids unless directed by CO but will be responsible to pay for damages.

The government may make repairs and back charge the installation contractor.

4.2.6 Services shall include product transportation of existing inventory as required.

4.2.7 Services shall include installation of product to conform to final CO and/or COR approval.

4.2.8 Services shall include removal of any packing materials used during transport or installation.

4.2.9 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled wherever possible.

4.2.10 The contractor shall maintain environmental controls when working in any government facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.

4.2.11 The contractor shall provide all components, completely assembled, installed, and operational.

4.2.12 The contractor shall inspect to ensure the fuel pit lids are free of surface dirt and defects, the installation is complete, and the lid is ready for use.

4.3 Inspection/Acceptance Checklist

Validation between the contractor and the COR that all products have been installed according to manufacturer guidelines and/or customer specifications.

4.3.1 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and COR.

4.3.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the COR upon completion of a joint walk through by the contractor and the COR. No payment will be authorized while punch list items remain open.

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

4.3.3 A final walk through will be performed with the contractor and the COR and the CO to ensure all punch list items have been addressed to the satisfaction of the government.

5.0 Government Furnished Support

5.1 Base support includes Government-controlled working space and utilities.

6.0 Site Conditions

6.1 Standard site conditions shall be considered those that include:

6.1.1 Free and clear hard surface access to the receiving and installation location during regular working hours

6.1.2 Threat condition level of the base is Bravo. This requires company personnel to get base access in order to complete the product installation.

6.1.3 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials.

6.2 Contractor shall notify the CO of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price based on a condition not available at site visit.

7.0 Voluntary Protection Program (VPP)/Safety

7.1 Voluntary Protection Program: The Air Force is part of the AOSHA VPP. All contractors are required to familiarize themselves with the requirements of the VPP. Information on VPP can be accessed at https://www.osha.gov/vpp

8.0 Base/Installation Specifics

8.1 All commercial trucks must enter through the Halawa (Commercial) Gate on the

Pearl Harbor side, which is located on the corner of Halawa Dr. and Kamehameha Hwy for inspection. In accordance with the Installation 647 SFS, base entry procedures must adhere to delivery vehicle process requirements mandated IAW JBPH-H INST 5530.2B. Once at Halawa Commercial Gate, the driver must have a current DBIDS pass issued by JBPHH Pass & ID located at Bldg 3455, South Drive for entry through the Halawa Commercial Gate. Approval for DBIDS will be completed through the 735 AMS with all workers have previously completed the SECNAV 5512-1 and the JB2 Form 0-180 for base access. Vehicles will be ready for inspection prior to entry and may be asked to provide proof of:

• A current Vehicle Registration

• A current Proof of Insurance

• A valid and current Driver's License for the driver

• A valid and current Driver's License or other State Identification for any passenger(s) in the vehicle.

8.2 Gate Procedures:

https://www.osha.gov/vpp

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

• Once at Halawa Commercial Gate, be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.

• If the final destination requires the driver to leave the Halawa Commercial Gate and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.

• Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.

• This procedure will occur each time a commercial truck requests access to the base.

8.3 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).

8.4 Personnel should the following items when entering an installation:

• Current Registration for all vehicles

• Current Proof of Insurance for all vehicles

• Valid driver’s license for each driver

• Valid driver’s license or other state identification for each passenger

• Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, Bldg 3455, South Drive.

• The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government POC prior to their arrival so as to coordinate the arrival time accordingly.

Sponsors may request that a pass be applicable for multiple days if needed.

8.5 To sponsor 10 or more people, a typed list of those people must be submitted by the COR in Word or Excel format, stating LAST NAME then FIRST NAME of each person. The sponsor must submit that list to Pass & ID Bldg 3455, South Drive, no fewer than three days prior to the anticipated arrival. Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.

8.6 Mission Essential Services: Contractors are not considered mission essential.

8.7 Prohibitions: Firearms may not be brought on base under any circumstances.

Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.

9.0 Deliverables (CDRLs)

9.1 (CDRL A001) Removal

9.2 (CDRL A002) Installation

9.3 (CDRL A003) Electrician/Electrical Work (if required)

9.4 The Government has full ownership of all formal deliverables and required supporting documentation with regard to use, distribution and reproduction.

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

10.0 Performance Objective Summary

Performance Objective PWS

Paragraph Performance Threshold

1) General –Oversight and accountability for all people and equipment used and product provided for a project

4.1 No more than 1 customer complaint per removal and

installation and resolution of all issues identified and validated by the COR within 24 hours.

2) Installation/Removal

– product was removed and installed per customer’s approved plan within the allotted time frame

4.2 No more than one customer complaint. Complaints

must be successfully resolved within 48 hours.

6) Acceptance – All punch list items have been remedied, and the fuel pit lid for 22B is in proper working condition.

4.3 Zero punch list items remain unresolved prior to

project completion.

11.0 Attachments

11.1 – Diagram

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

11.2 – Pictures

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

PWS Fuel Pit Lid Swap Contract No. xxxxxxxxxxxxx

1.0 Background
2.0 Scope
3.0 Period of Performance
4.0 Description of Work
4.0
4.1 General Services
4.2 Assembly, Installation and Removal Work
4.3 Inspection/Acceptance Checklist
5.0 Government Furnished Support
6.0 Site Conditions
7.0 Voluntary Protection Program (VPP)/Safety
8.0 Base/Installation Specifics
9.0 Deliverables (CDRLs)
10.0 Performance Objective Summary
11.0 Attachments