A1_-_CANE_350204_SOW_V2.pdf
PDF 96 KB Posted
- Attached to
- REPLACE DAMAGED VISITOR CENTER FLOOR
- Solicitation number
- 140P5326Q0007
About this file
This is a Statement of Work (SOW) for flooring replacement at a National Monument visitor center in Nicholasville, Kentucky. The contractor must remove and replace approximately 760 square feet of damaged 2.25-inch oak laminate plank flooring using a floating floor system within 15 calendar days from the Notice to Proceed, with 3 days reserved for weather or unforeseen delays. Work includes removal and offsite disposal of existing flooring and adhesive residues, careful removal and labeling of wood baseboards and trim, mechanical cleaning and preparation of the subfloor, installation of a minimum 6 mil polyethylene vapor barrier, installation of new interlocking laminate flooring (AC3 minimum wear rating) to match neighboring floors, reinstallation and repainting of baseboards and trim, final cleaning, and participation in a government walkthrough inspection.
All flooring materials and installation methods must comply with ASTM D4060 (abrasion resistance), IBC 2403 (flooring durability), and EPA TSCA Title VI (formaldehyde emissions). The contractor is responsible for furnishing all labor, materials, equipment, supervision, and incidentals. Work must be performed Monday through Friday from 7:00 a.m. to 3:30 p.m. The work area is an active public facility requiring containment barriers agreed upon with park staff. The contractor must comply with OSHA 29 CFR 1926 and maintain required PPE including safety glasses, work gloves, knee protection, dust masks or respirators, and hearing protection. Daily safety briefings, a stocked first aid kit, and a fire extinguisher must be maintained onsite. The east parking lot and one utility bay are available for material staging. All waste and debris must be disposed of offsite in accordance with federal, state, and local regulations, and government dumpsters may not be used.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5326Q0007_Amd_0002.pdf | ||
| Questions_and_Answers_Amendment_2_0002.pdf | ||
| Questions_and_answers_0001.pdf | ||
| Sol_140P5326Q0007_Amd_0001.pdf | ||
| A4_-_VC_Floor_Photos_Doc.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P5326Q0007.pdf | ||
| A2_-Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANE_35204_Replace Damaged Flooring in Visitor Center.
PART 1 – GENERAL
ITEM 1 – DESCRIPTION OF WORK
1.1 Background
The existing oak laminate flooring in a high-traffic section of the Visitor Center at the National Monument in Nicholasville, Kentucky, has reached the end of its service life.
The flooring contributes to visitor experience, safety, and accessibility. Wear, edge separation, and surface deterioration now require full replacement.
1.2 Work Covered by the Contract
The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to remove and replace approximately 760 square feet of 2.25-inch oak laminate plank flooring using a floating floor system. Work includes, but is not limited to:
• Removal and offsite disposal of existing flooring and adhesive residues
• Careful removal, labeling, and protection of existing wood baseboards and trim
• Mechanical cleaning and preparation of the subfloor as needed
• Installation of a polyethylene vapor barrier (minimum 6 mil)
• Installation of new interlocking laminate floating floor system to aesthetically match neighboring floor as close as possible
• Reinstallation and repainting of baseboards and trim as required
• Final cleaning and participation in a government walkthrough
All flooring materials and installation methods shall comply with manufacturer requirements and applicable standards, including:
• ASTM D4060 – Abrasion resistance
• IBC 2403 – Flooring durability
• EPA TSCA Title VI – Formaldehyde emissions
Laminate planks shall meet or exceed an AC3 wear rating.
Period of Performance
The Contractor shall complete all work within 15 calendar days from the Notice to Proceed, including 3 days reserved for weather or unforeseen delays.
ITEM 2 – EXISTING UTILITIES
2.1 No utility modifications or disruptions are anticipated.
2.2 The Contractor shall avoid damaging any embedded conduits or in-floor systems.
2.3 Any accidental utility damage shall be immediately reported to the Contracting Officer and repaired by the Contractor at no additional cost to the Government.
ITEM 3 – USE OF PREMISES
3.1 The work area is an active public facility. The Contractor shall install and maintain a containment barrier agreed upon with park staff to isolate the work zone from visitors and staff.
3.2 Working hours are 7:00 a.m. to 3:30 p.m., Monday through Friday, unless otherwise approved by the Government.
3.3 The east parking lot and one utility bay will be made available for material staging.
3.4 The Contractor shall protect all adjacent surfaces, fixtures, and exhibits using non-marking physical barriers.
3.5 All waste, debris, and removed flooring materials shall be disposed of offsite in accordance with federal, state, and local regulations. Government dumpsters may not be used.
ITEM 4 – SAFETY & PPE REQUIREMENTS
4.1 The Contractor shall comply with OSHA 29 CFR 1926 and all applicable federal, state, and local safety regulations.
4.2 Required PPE includes, at minimum:
• ANSI-approved safety glasses
• Work gloves suitable for demolition and handling sharp materials
• Knee protection for flooring installation
• Dust masks or respirators during removal and subfloor preparation
• Hearing protection when power tools exceed 85 dB(A)
4.3 The Contractor shall conduct a daily safety briefing (“toolbox talk”) with all onsite personnel.
4.4 The Contractor shall maintain a stocked first aid kit and a fire extinguisher onsite at all times.
PART 2 – EXECUTION
Phase 1 – Mobilization & Protection
• Document existing floor conditions with photographs
• Remove and label all trim and baseboards for later reinstallation
• Install temporary barriers to isolate the workspace
• Protect adjacent walls, thresholds, and finishes
Phase 2 – Removal & Subfloor Preparation
• Remove all existing laminate flooring using manual and mechanical methods
• Remove adhesive residues and inspect subfloor per ASTM F710
• Clean all dust and debris
• Correct minor subfloor irregularities (≤ 3/16" deviation over 10 feet) as needed
Phase 3 – Vapor Barrier Installation
• Install 6 mil polyethylene sheeting with minimum 6" overlap
• Tape and seal all seams; extend barrier 2" up vertical surfaces beneath trim
Phase 4 – Flooring Installation
• Install 2.25" oak-finish laminate planks (AC3 minimum)
• Stagger end joints with at least 6" offset
• Maintain 1/4" expansion gap at all perimeters
• Ensure uniform locking, no cupping, and no visible gaps
Phase 5 – Trim Reinstallation & Paint Touch-up
• Reinstall baseboards and trim using finish nails and color-matched caulking
• Repaint scuffed or replaced sections to match existing finish
Phase 6 – Cleanup & Final Review
• Remove all debris, barriers, and protective coverings
• Damp mop the new floor and verify proper installation
• Participate in a Government final inspection
• Provide final photographs and closeout documentation