This document is a Salient Characteristics statement for a federal procurement by the Department of the Air Force, Headquarters 628th Air Base Wing (AMC) at Joint Base Charleston, South Carolina, dated 12 June 2026.
The Government seeks to procure a centralized remote generator and Automatic Transfer Switch (ATS) monitoring system capable of monitoring approximately 65 existing standby generators and associated ATS units across Joint Base Charleston and geographically separated units including Naval Weapons Station Charleston, North Auxiliary Airfield, and Short Stay Recreational Area. The system must be compatible with Cummins, Caterpillar, and Generac generators and industry-standard controllers, support Modbus TCP/IP and Modbus RTU over RS-485 communications, and operate on a Government-owned/on-premises architecture without requiring vendor cloud services. The system shall include industrial communication gateways, protocol conversion capability, and hardened industrial-grade hardware suitable for mechanical and electrical room installation. The monitoring system must provide comprehensive generator monitoring including run status, breaker position, voltage, current, frequency, KW/kVA, fuel level, coolant temperature, oil pressure, and battery parameters, as well as ATS monitoring including source availability status, position indication, transfer event logging, and alarm capabilities. The system must be expandable with minimum 25 percent spare capacity, maintain 12 months of historical data, support password-protected user accounts with role-based access, include cybersecurity documentation, and provide system commissioning, functional testing, and operator training for Government personnel. Warranty shall be provided by equipment manufacturers and installing contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JBC Gen data.xlsx | XLSX spreadsheet | |
| Minimum Characteristics Remote Generator Monitoring.docx | DOCX document | |
| JBC Gen data.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 628TH AIR BASE WING (AMC)
JOINT BASE CHARLESTON SC
“Mission Ready Warfighters Deterring Conflict…TOGETHER!”
Salient characteristics
FY26 Power Pro Remote Generator Monitoring System Joint Base Charleston Air Base
South Carolina 12 June 2026
Salient characteristics: The equipment purchase consists of providing a centralized remote generator and Automatic Transfer Switch (ATS) monitoring system for Government installation and integration across Joint Base Charleston, South Carolina and geographically separated units.
Equipment Requirements:
• Remote Generator Monitoring System o Capable of monitoring approximately 65 existing standby generators and associated ATS units o Compatible with Cummins, Caterpillar, and Generac generator and other industry-standard controllers o Compatible with Cummins, ASCO, Generac, and other industry-standard
ATS controllers o Support Modbus TCP/IP communications o Support Modbus RTU over RS-485 communications o Ethernet communication capable o Government-owned/on-premises architecture (no vendor cloud required for operation) o Compatible with existing Government EMCS/SCADA infrastructure o Web-based centralized dashboard accessible from Government network o User-configurable alarm and notification capability o Historical event and alarm logging capability o Open architecture system without proprietary communication lockout restrictions o Expandable architecture capable of supporting future generator and ATS additions without replacement of core system infrastructure o System shall include minimum 25 percent spare monitoring capacity beyond currently connected assets
CUI
o System licensing, server capability, bandwidth, storage capacity, and communication infrastructure shall support future expansion without major hardware replacement o System shall support centralized monitoring across Joint Base Charleston and geographically separated units including Naval Weapons Station Charleston, North Auxiliary Airfield, and Short Stay Recreational Area
• Generator Monitoring Capability o Generator run status o Generator breaker position o Voltage monitoring o Current monitoring o Frequency monitoring o KW/kVA monitoring o Fuel level monitoring o Coolant temperature monitoring o Oil pressure monitoring o Battery voltage monitoring o Battery charger status monitoring o Block heater status monitoring o Alarm status and alarm history o Generator communication loss alarm capability
• ATS Monitoring Capability o Utility source availability status o Generator source availability status o ATS position indication (Normal/Emergency) o Transfer in progress indication o Utility voltage monitoring o Transfer event logging o Alarm status and alarm history o ATS communication loss alarm capability
• Site Hardware Requirements o Industrial communication gateways as required o Protocol conversion capability as required o Hardened industrial communication hardware suitable for mechanical and electrical room installation o Compatible with Government OT/EMCS network infrastructure o No proprietary communication lockout restrictions o Industrial-grade hardware suitable for continuous operation in electrical and mechanical environments o Contractor shall coordinate all network connectivity requirements with
Government personnel
• Cybersecurity Documentation Requirements o Contractor shall provide documentation necessary to support Government cybersecurity review and network approval o Documentation shall include:
o Network architecture diagrams o Communication port and protocol lists o Device inventory o Software and firmware versions o Default credential documentation o Patch and update procedures o System shall support password-protected user accounts and role-based access
• System Resilience Requirements o Loss of network communication to a remote site shall not impair local generator or ATS operation o Local generator and ATS controllers shall continue normal operation independent of monitoring network status o Central monitoring server shall automatically resume data collection upon restoration of communication o System shall maintain alarm and historical data integrity during temporary communication outages
• Time Synchronization Requirements o All monitoring devices and servers shall support synchronized timekeeping via Government-approved Network Time Protocol (NTP)
• Historical Data Retention o System shall retain minimum 12 months of alarm history and operational trend data
• Dashboard Capability o System shall support centralized dashboard view with asset identification by facility and geographic location o Contractor shall configure all monitored assets using Government-provided naming convention and asset identifiers o System shall support configurable alarm prioritization including advisory, warning, and critical alarm levels
• System Integration Requirements o Complete Modbus register mapping documentation o Communication architecture documentation o Network configuration support o System commissioning and functional testing o Operator training for Government personnel o Scalable server and software architecture capable of future asset expansion o System shall support future implementation of secure read-only remote access if separately authorized by the Government
Required Warranty Period:
By Equipment Manufacturer and Installing Contractors