A06_RFO_NCA_Picnic_Shelters_Specifications_JV_2026.pdf

PDF 116 KB Posted

Attached to
2026 Steel Pavilions
Solicitation number
140L1726Q0036
Issued by

About this file

This document is a specification for steel picnic shelters required by the Bureau of Land Management (BLM) Pecos District Office – Roswell Field Office for installation at the Fort Stanton Snowy River Cave National Conservation Area (NCA) Rob Jaggers Campground in Fort Stanton, New Mexico.

The BLM seeks to procure 24 steel picnic shelters (8 total units, with 3 shelters per unit) measuring 10 feet by 10 feet to roofline with a 7 feet 6 inches eave height and 4:12 roof pitch. All structures must be square, hip roof designs utilizing ASTM A-500 Grade B/C structural steel tubing and ASTM A-36 structural plates. Shelters must be designed to meet site-specific snow and wind load criteria per the 2018 International Building Code or newer. The manufacturer must provide complete detailed engineering drawings sealed by a licensed engineer, foundation/footing design, erection plans, specifications, and installation instructions. All structural welds must comply with AWS standards and develop full strength of the weaker member; hollow steel members must be welded shut at termination points to prevent internal leakage. Installation hardware shall include ASTM A325 bolts, ASTM B7 threaded rod, ASTM F436 washers, and ASTM A563 hex nuts, with options for stainless steel (ASTM A-304) upon request. Anchor bolts must comply with F1554 grade 36, with templates provided by the manufacturer. All fabricated steel members shall be primed and powder coated; roof panels must be 26 gauge minimum with colors selected from the manufacturer's palette and approved by BLM prior to fabrication. The contractor must provide a minimum 10-year warranty against manufacturer defects and bear all transportation costs to the delivery address. Delivery shall occur during normal business hours (9:30 AM – 3:00 PM, Monday through Friday, excluding holidays) with at least five working days' notice to the Contracting Officer's Representative. The contractor is responsible for proper care, offloading, and ensuring undamaged delivery to the Rob Jaggers Campground at 104 Kit Carson Highway 220, Fort Stanton, NM 88323.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management

Pecos District Office – Roswell Field Office

NCA Picnic Shelters for the Rob Jaggers Campground Specifications

Background

The Bureau of Land Management (BLM) Pecos District Office (PDO) - Roswell Field Office (RFO), seeks to purchase steel picnic shelters for the Fort Stanton Snowy River Cave National Conservation Area (NCA) Rob Jaggers Campground, see delivery street address, 104 Kit Carson, Hwy 220, Fort Stanton, NM, 88323.

The Picnic Shelters shall meet the minimum required specifications. Structures shall be designed to meet site specific (Rob Jaggers Campground) snow and wind load design criteria using most current applicable building codes. As good or better as the specifications listed below.

Minimum Specifications:

1. Length x Width 10 feet x 10 feet to roofline (24 each): all steel, square, hip roof shelters

2. Height: 7 ft, 6 in. eave height

3. Roof Pitch: 4:12

4. Ground snow load: To be determined by site specific design ____ psf

5. Wind speed loading: To be determined by site specific design ____ mph

2018 IBC, or newer for numbers 5 & 6

Quantity: 8 Total: 24 each of 10’ x 10’ shelters.

Structural Members:

1. Manufacturer shall supply complete detailed drawings bearing the seal of a licensed engineer, design data, erection plan, specifications, and installation detailed instructions,

2. Manufacturer shall supply a foundation/footing design and drawings for the area in which the structures will be installed and shall bear the seal of a licensed engineer.

3. All structural steel tubing utilized shall be ASTM A-500 Grade B/C (46-50 ksi yield strength / 58 -62 ksi tensile strength).

4. All structural plates, gussets etc. shall conform to ASTM A-36 (36 ksi yield strength / 58-80 ksi tensile strength).

5. All welding is to be done in accordance with the latest AWS standards.

6. All welds shall develop the full strength of the weaker member. Fabricated welded assemblies will be performed by the manufacturer.

7. Hollow steel members shall be welded shut at termination points to prevent internal leakage. A small hole to allow shrink/swell and drainage is allowable. (bolted baseplate to column connections are not acceptable.)

8. Field assembly connections will be indicated on the set-up drawings.

Installation Hardware:

1. All required fasteners are provided for construction of the shelter.

2. Uncoated hardware will be used in hidden applications and zinc plated or galvanized hardware will be used in exposed applications.

3. All fastening hardware bolts shall comply with ASTM A325. Threaded rod applications shall comply with ASTM B7. Washers shall comply with ASTM F436. Hex nuts shall comply with

ASTM A563.

4. Upon request, stainless steel hardware can be used for exposed applications. Stainless steel hardware shall comply with ASTM A-304.

Anchor Bolts:

1. Headed anchor bolts shall comply with F1554 grade 36. Higher grades may be used for specific applications.

2. Templates will be provided by the manufacturer for setting of anchors in concrete.

Coating:

1. All fabricated steel members will be primed, and powder coated.

2. Roof panels shall be 26 gauge minimum, color determined by manufacturers color palette at time of order in color for the 24 each – 10’ x 10'.

3. Post/uprights shall be color determined by manufacturers color palette at time of order for the

27 each - 10’ x 10’.

4. Vendor must Submit color chart for final selection and approval by BLM staff prior to fabrication.

Warranty:

Minimum 10 years against manufacturer defects.

Delivery Notification:

The Contractor is required to notify the Contracting Officer’s Representative (COR) at least five working days prior to delivery. This advance notice ensures sufficient time for arranging the inspection and acceptance of the product.

Delivery Times:

Delivery shall be conducted during normal business hours, see Delivery Address. Between 9:30 am – 3:00 pm, Monday through Friday. (excluding holidays). The Contractor shall be responsible for notifying Contract Carriers of the scheduled delivery times.

Responsibility for Delivery:

The Contractor shall be responsible for the proper care and protection of the product until it is accepted by the COR. Special care should be taken to ensure that the product is delivered in its entirety and undamaged to the delivery destination. Contractor is responsible for offloading. Ground and site conditions will necessitate an off road fork lift or equivalent machine.

Transportation/Freight Charges:

The Contractor shall bear all costs associated with the transportation of freight from the manufacturer to the delivery destination. These costs must be included in the total price quoted for the items.

Delivery Destination Addresses:

BLM Rob Jaggers Campground 104 Kit Carson Hwy 220 Fort Stanton, NM 88323

File details come from the government source that posted it. Updated .