A06_Rachel_Carson_Specs_06-28-22_VOL_2.pdf

PDF 6 MB Posted

Attached to
Renovations of Historical Bldg for Multi-Purpose F
Solicitation number
140FC223R0005
Issued by

About this file

This is a set of specifications for a multi-purpose facility renovation project at the Rachel Carson National Wildlife Refuge in Kennebunk, Maine. The specifications cover requirements for various construction disciplines including concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, equipment, HVAC, plumbing, and electrical systems. The project number is 5R-ME-770-100.00 and is being undertaken by the U.S. Fish and Wildlife Service Northeast Region. The specifications provide detailed product and installation requirements for renovating and upgrading the existing building systems to create an ADA-compliant multi-purpose facility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RACHEL CARSON NATIONAL WILDLIFE REFUGE

Project No. 5R-ME-770-100.00

Volume 2 of 2

SPECIFICATIONS

Multi-Purpose Facility Kennebunk, Maine

Prepared By:

Prepared For:

United States Fish and Wildlife Service Northeast Region 5 300 Westgate Center Drive Hadley, Massachusetts 01035

June 28, 2022

U.S. Fish and Wildlife Service

MULTI-PURPOSE FACILITY PROJECT NO. 5R-ME-770-100.0

U.S. FISH AND WILDLIFE SERVICE

KENNEBUNK, MAINE

TABLE OF CONTENTS PAGE - 1

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

010000 SEALS PAGE

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

012200 UNIT PRICES

012300 ADDITIVES

012900 PAYMENT PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATION

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014000 QUALITY REQUIREMENTS

014200 REFERENCES

014300 ENVIRONMENTAL PROTECTION

014535 SPECIAL INSPECTIONS (WITH SCHEDULE ATTACHED)

015000 TEMPORARY FACILITIES AND CONTROLS

015639 TEMPORARY TREE AND PLANT PROTECTION

017300 EXECUTION

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017839 PROJECT RECORD DOCUMENTS

017900 DEMONSTRATION AND TRAINING

019000 GENERAL SAFETY REQUIREMENTS

019113 GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

031000 CONCRETE FORMING AND ACCESSORIES

032000 CONCRETE REINFORCING

033000 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

042200 CONCRETE UNIT MASONRY

DIVISION 05 - METALS

051200 STRUCTURAL STEEL FRAMING

053100 STEEL DECKING

055113 METAL PAN STAIRS

055213 PIPE AND TUBE RAILINGS

TABLE OF CONTENTS PAGE - 2

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY

061600 SHEATHING

061753 SHOP-FABRICATED WOOD TRUSSES

064023 INTERIOR ARCHITECTURAL WOODWORK

064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

064216 FLUSH WOOD PANELING

066400 PLASTIC PANELING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

071326 SELF-ADHERING SHEET WATERPROOFING

072100 THERMAL INSULATION

072119 FOAMED-IN-PLACE INSULATION

072500 WEATHER BARRIERS

073113 ASPHALT SHINGLES

074646 FIBER-CEMENT SIDING

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

076200 SHEET METAL FLASHING AND TRIM

077100 ROOF SPECIALTIES

078413 PENETRATION FIRESTOPPING

078443 JOINT FIRESTOPPING

079200 JOINT SEALANTS

079219 ACOUSTICAL JOINT SEALANTS

DIVISION 08 – DOORS AND WINDOWS

080152 WOOD WINDOW REPAIRS

081416 FLUSH WOOD DOORS

081433 STILE AND RAIL WOOD DOORS

085200 WOOD WINDOWS

086300 METAL FRAMED SKYLIGHTS

087111 DOOR HARDWARE (DESCRIPTIVE SPECIFICATIONS)

088000 GLAZING

088100 FIRE-RATED GLASS AND FRAMING SYSTEMS

DIVISION 09 - FINISHES

092116.23 GYPSUM BOARD SHAFT WALL ASSEMBLIES

092900 GYPSUM BOARD

093013 CERAMIC TILING

095113 ACOUSTICAL PANEL CEILINGS

096400 WOOD FLOORING

096513 RESILIENT BASE AND ACCESSORIES

096516 RESILIENT SHEET FLOORING

096543 LINOLEUM FLOORING

096813 TILE CARPETING

096816 SHEET CARPETING (AREA RUGS)

098433 SOUND ABSORBING WALL UNITS

099113 EXTERIOR PAINTING

TABLE OF CONTENTS PAGE - 3

099123 INTERIOR PAINTING

099300 STAINING AND TRANSPARENT FINISHING

DIVISION 10 - SPECIALTIES

101419 DIMENSIONAL LETTER SIGNAGE AND LOGO

101423.16 ROOM-IDENTIFICATION PANEL SIGNAGE

102113.19 PLASTIC TOILET COMPARTMENTS

102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

111136 VEHICLE CHARGING EQUIPMENT

113013 RESIDENTIAL APPLIANCES

DIVISION 12 - FURNISHINGS

122413 ROLLER WINDOW SHADES

123623.13 PLASTIC-LAMINATE-CLAD COUNTERTOPS

123661.16 SOLID SURFACING COUNTERTOPS

DIVISION 14 – CONVEYING EQUIPMENT

142600 LIMITED-USE/LIMITED-APPLICATION ELEVATORS

DIVISION 22 - PLUMBING

220513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

220518 ESCUTCHEONS FOR PLUMBING PIPING

220519 METERS AND GAGES FOR PLUMBING PIPING

220523.12 BALL VALVES FOR PLUMBING PIPING

220523.14 CHECK VALVES FOR PLUMBING PIPING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

221116 DOMESTIC WATER PIPING

221119 DOMESTIC WATER PIPING SPECIALTIES

221123.21 INLINE, DOMESTIC-WATER PUMPS

221316 SANITARY WASTE AND VENT PIPING

221319 SANITARY WASTE PIPING SPECIALTIES

221319.13 SANITARY DRAINS

221413 STORM DRAINAGE PIPING

221423 STORM DRAINAGE PIPING SPECIALTIES

223100 DOMESTIC WATER SOFTENERS

223200 DOMESTIC WATER FILTRATION EQUIPMENT

223300 ELECTRIC, HYBRID, DOMESTIC-WATER HEATERS

224213.13 COMMERCIAL WATER CLOSETS

224213.16 COMMERCIAL URINALS

224216.13 COMMERCIAL LAVATORIES

TABLE OF CONTENTS PAGE - 4

224216.16 COMMERCIAL SINKS

224223 COMMERCIAL SHOWERS

224500 EMERGENCY PLUMBING FIXTURES

224716 PRESSURE WATER COOLERS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230517 SLEEVES FOR HVAC PIPING

230518 ESCUTCHEONS FOR HVAC PIPING

230519 METERS AND GAUGES FOR HVAC PIPING

230523.12 BALL VALVES FOR HVAC PIPING

230523.14 CHECK VALVES FOR HVAC PIPING

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230548.13 VIBRATION CONTROLS FOR HVAC

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230800 COMMISSIONING OF HVAC AND PLUMBING

230923.11 CONTROL VALVES

232113 HYDRONIC PIPING

232116 HYDRONIC PIPING SPECIALTIES

232123 HYDRONIC PUMPS

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233723 HVAC GRAVITY VENTILATORS

237223.19 PACKAGED INDOOR FIXED PLATE ENERGY RECOVERY UNITS

238126 SPLIT-SYSTEM AIR-CONDITIONERS

238132 SPLIT INVERTOR AIR-TO-WATER HEAT PUMP

238219 BLOWER COIL UNITS

238236 FINNED-TUBE RADIATION HEATERS

238239.16 PROPELLER ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260800 COMMISSIONING OF ELECTRICAL SYSTEMS

260923 LIGHTING CONTROL DEVICES

260943.23 LIGHTING CONTROL SYSTEMS

262416 PANELBOARDS

262726 WIRING DEVICES

262813 FUSES

TABLE OF CONTENTS PAGE - 5

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

263100 PHOTOVOLTAIC SYSTEMS

263213.14 DIESEL ENGINE GENERATORS

263600 TRANSFER SWITCHES

265119 LED INTERIOR LIGHTING

265213 EMERGENCY AND EXIT LIGHTING

DIVISION 27 - COMMUNICATIONS

271100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

271116 COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES

271513 COMMUNICATIONS COPPER HORIZONTAL CABLING

274116 INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

283100 INTRUSION DETECTION

284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS

DIVISION 31 - EARTHWORK

311000 SITE CLEARING

312000 EARTH MOVING

DIVISION 32 - EXTERIOR IMPROVEMENTS

321216 ASPHALT PAVING

321400 UNIT PAVING

323113 CHAIN LINK FENCES AND GATES

323223 SEGMENTAL RETAINING WALLS

329113 SOIL PREPARATION

329200 TURF AND GRASSES

329300 PLANTS

DIVISION 33 - UTILITIES

331113 POTABLE WATER SUPPLY WELLS (WITH WATER TEST RESULTS

ATTACHED)

331415 SITE WATER DISTRIBUTION PIPING

333000 FACILITY SEPTIC SYSTEMS

334200 STORMWATER CONVEYANCE

334600 SUBDRAINAGE

END OF TABLE OF CONTENTS

COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 220513 - 1

SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on alternating-current power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.

1.3 COORDINATION

A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:

1. Motor controllers.

2. Torque, speed, and horsepower requirements of the load.

3. Ratings and characteristics of supply circuit and required control sequence.

4. Ambient and environmental conditions of installation location.

PART 2 - PRODUCTS

2.1 GENERAL MOTOR REQUIREMENTS

A. Comply with NEMA MG 1 unless otherwise indicated.

2.2 MOTOR CHARACTERISTICS

A. Duty: Continuous duty at ambient temperature of 40 deg C and at altitude of 3300 feet above sea level.

B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 220513 - 2

2.3 SINGLE-PHASE MOTORS

A. Motors larger than 1/20 hp shall be the following, to suit starting torque and requirements of specific motor application:

1. Permanent-split capacitor.

B. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.

C. Motors 1/20 HP and Smaller: Shaded-pole type.

D. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

PART 3 - EXECUTION (Not Applicable)

END OF SECTION

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 1

SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Sleeves.

2. Sleeve-seal systems.

3. Grout.

B. Related Requirements:

1. Section 078413 “Penetration Firestopping” for penetration firestopping installed in fire-resistant related walls, horizontal assemblies, and smoke barriers, with and without penetrating items.

2. Section 079200 “Joint Sealants” for installation of sealants to seal annular space between sleeve and pipe or pipe insulation.

1.3 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 "Submittal Procedures" and the individual sections specifying the work.

B. Product Data: For each type of product. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

PART 2 - PRODUCTS

2.1 SLEEVES

A. Cast-Iron Pipe Sleeves: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends.

B. Steel Pipe Sleeves: ASTM A53/A53M, Type E, Grade B, Schedule 40, with plain ends.

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 2

C. Galvanized-Steel Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

2.2 SLEEVE-SEAL SYSTEMS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. Advance Products & Systems, LLC.

2. CALPICO, Inc.

3. GPT; an EnPro Industries company.

4. Metraflex Company (The).

5. Proco Products, Inc.

B. Description:

1. Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

2. Designed to form a hydrostatic seal of 20 psig minimum.

3. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

4. Pressure Plates: Carbon steel or composite plastic.

5. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, ASTM B633 of length required to secure pressure plates to sealing elements.

2.3 GROUT

A. Description: Nonshrink, for interior and exterior sealing openings in non-fire-rated walls or floors.

B. Standard: ASTM C1107/C1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION

A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.

http://www.specagent.com/Lookup?ulid=1677 http://www.specagent.com/Lookup?uid=123457073327 http://www.specagent.com/Lookup?uid=123457073328 http://www.specagent.com/Lookup?uid=123457074355 http://www.specagent.com/Lookup?uid=123457073329 http://www.specagent.com/Lookup?uid=123457073331

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 3

1. Sleeves are not required for core-drilled holes in concrete walls or floors.

C. Install sleeves in concrete floors and concrete walls as new slabs and walls are constructed.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.

2. Using grout or silicone sealant, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cut sleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Section 079200 “Joint Sealants.”

E. Fire-Resistance-Rated Penetrations, Horizontal Assembly Penetrations, and Smoke Barrier Penetrations: Maintain indicated fire or smoke rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with fire- and smoke-stop materials. Comply with requirements for firestopping and fill materials specified in Section 078413 "Penetration Firestopping."

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION

A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 SLEEVE AND SLEEVE-SEAL SCHEDULE

A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:

a. Piping Smaller Than NPS 6: Cast-iron or steel pipe sleeves.

2. Exterior Concrete Walls below Grade:

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 4

a. Piping Smaller Than NPS 6: Cast-iron pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

b. Piping NPS 6 and Larger: Cast-iron pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:

a. Piping Smaller Than NPS 6: Cast-iron pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

4. Interior Partitions:

a. Piping Smaller Than NPS 6: Steel pipe sleeves.

b. Piping NPS 6 and Larger: Galvanized-steel sheet sleeves.

ESCUTCHEONS FOR PLUMBING PIPING 220518 - 1

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Escutcheons.

1.3 DEFINITIONS

A. Existing Piping to Remain: Existing piping that is not to be removed and that is not otherwise indicated to be removed and salvaged, or removed and reinstalled.

PART 2 - PRODUCTS

2.1 ESCUTCHEONS

A. One-Piece, Steel Type: With polished, chrome-plated finish and setscrew fastener.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped steel or brass with polished, chrome-plated finish and spring-clip fasteners.

C. One-Piece, Stamped-Steel Type: With polished, chrome-plated finish and spring-clip fasteners.

D. Split-Plate, Stamped-Steel Type: With polished, chrome-plated finish; concealed hinge; and spring-clip fasteners.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.

ESCUTCHEONS FOR PLUMBING PIPING 220518 - 2

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of insulated piping and with OD that completely covers opening.

1. Escutcheons for New Piping and Existing Piping:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep pattern.

b. Chrome-Plated Piping: One-piece steel or cast brass with polished, chrome-plated finish.

c. Insulated Piping: One-piece stamped steel or split-plate, stamped steel with concealed hinge with polished, chrome-plated finish.

d. Bare Piping at Wall, Ceiling, and Floor Penetrations in Finished Spaces: One-piece stamped steel or split-plate, stamped steel with concealed hinge with polished, chrome-plated finish.

e. Bare Piping in Unfinished Service Spaces and Equipment Rooms: One-piece stamped steel or split-plate, stamped steel with concealed hinge with polished, chrome-plated finish.

METERS AND GAGES FOR PLUMBING PIPING 220519 - 1

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Liquid-in-glass thermometers.

2. Thermowells.

3. Pressure gages.

4. Gage attachments.

B. Related Requirements:

1. Section 221119 "Domestic Water Piping Specialties" for water meters.

1.2 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 "Submittal Procedures" and the individual sections specifying the work.

B. Product Data: For each type of product. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

1.3 CLOSEOUT SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 "Submittal Procedures" and the individual sections specifying the work.

B. Operation and Maintenance Data: For meters and gages to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 LIQUID-IN-GLASS THERMOMETERS

A. Plastic-Case, Compact-Style, Liquid-in-Glass Thermometers:

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

http://www.specagent.com/Lookup?ulid=1689

METERS AND GAGES FOR PLUMBING PIPING 220519 - 2

a. Flo Fab Inc.

b. Miljoco Corporation.

c. Tel-Tru Manufacturing Company.

d. WATTS.

e. Weiss Instruments, Inc.

f. Weksler Glass Thermometer Corp.

g. WIKA Instrument Corporation.

2. Standard: ASME B40.200.

3. Case: Plastic; 6-inch nominal size.

4. Case Form: Back angle or straight.

5. Tube: Glass with magnifying lens and blue organic liquid.

6. Tube Background: Nonreflective with permanently etched scale markings graduated in deg F.

7. Window: Glass or plastic.

8. Stem: Aluminum or brass and of length to suit installation.

a. Design for Thermowell Installation: Bare stem.

9. Connector: 3/4 inch, with ASME B1.1 screw threads.

10. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of

1.5 percent of scale range.

2.2 THERMOWELLS

A. Thermowells:

1. Standard: ASME B40.200.

2. Description: Pressure-tight, socket-type fitting made for insertion into piping tee fitting.

3. Material for Use with Copper Tubing: CNR or CUNI.

4. Type: Stepped shank unless straight or tapered shank is indicated.

5. External Threads: NPS 1/2, NPS 3/4, or NPS 1, ASME B1.20.1 pipe threads.

6. Internal Threads: 1/2, 3/4, and 1 inch, with ASME B1.1 screw threads.

7. Bore: Diameter required to match thermometer bulb or stem.

8. Insertion Length: Length required to match thermometer bulb or stem.

9. Lagging Extension: Include on thermowells for insulated piping and tubing.

10. Bushings: For converting size of thermowell's internal screw thread to size of thermometer connection.

B. Heat-Transfer Medium: Mixture of graphite and glycerin.

2.3 PRESSURE GAGES

A. Direct-Mounted, Plastic-Case, Dial-Type Pressure Gages:

http://www.specagent.com/Lookup?uid=123457213306 http://www.specagent.com/Lookup?uid=123457213307 http://www.specagent.com/Lookup?uid=123457213308 http://www.specagent.com/Lookup?uid=123457213311 http://www.specagent.com/Lookup?uid=123457213309 http://www.specagent.com/Lookup?uid=123457213312 http://www.specagent.com/Lookup?uid=123457213310

METERS AND GAGES FOR PLUMBING PIPING 220519 - 3

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

a. Ashcroft Inc.

b. Flo Fab Inc.

c. Miljoco Corporation.

d. Palmer Wahl Instrumentation Group.

e. Tel-Tru Manufacturing Company.

f. Trerice, H. O. Co.

g. Weiss Instruments, Inc.

h. Weksler Glass Thermometer Corp.

i. WIKA Instrument Corporation.

2. Standard: ASME B40.100.

3. Case: Sealed type; plastic; 4-1/2-inch nominal diameter.

4. Pressure-Element Assembly: Bourdon tube unless otherwise indicated.

5. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and bottom-outlet type unless back-outlet type is indicated.

6. Movement: Mechanical, with link to pressure element and connection to pointer.

7. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi and kPa.

8. Pointer: Dark-colored metal.

9. Window: Glass or plastic.

10. Accuracy: Grade B, plus or minus 2 percent of middle half of scale range.

2.4 GAGE ATTACHMENTS

A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and piston-type surge-dampening device. Include extension for use on insulated piping.

B. Valves: Brass or stainless steel needle, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install thermowells with socket extending to center of pipe and in vertical position in piping tees.

B. Install thermowells of sizes required to match thermometer connectors. Include bushings if required to match sizes.

C. Install thermowells with extension on insulated piping.

D. Fill thermowells with heat-transfer medium.

http://www.specagent.com/Lookup?ulid=1697 http://www.specagent.com/Lookup?uid=123457213221 http://www.specagent.com/Lookup?uid=123457213222 http://www.specagent.com/Lookup?uid=123457213224 http://www.specagent.com/Lookup?uid=123457213226 http://www.specagent.com/Lookup?uid=123457213228 http://www.specagent.com/Lookup?uid=123457213232 http://www.specagent.com/Lookup?uid=123457213229 http://www.specagent.com/Lookup?uid=123457213234 http://www.specagent.com/Lookup?uid=123457213230

METERS AND GAGES FOR PLUMBING PIPING 220519 - 4

E. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.

F. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.

G. Install valve and snubber in piping for each pressure gage for fluids.

H. Install thermometers in the following locations:

1. Inlet and outlet of each water heater.

I. Install pressure gages in the following locations:

1. Building water service entrance into building.

2. Suction and discharge of each domestic water pump.

3.2 CONNECTIONS

A. Install meters and gages adjacent to machines and equipment to allow service and maintenance of meters, gages, machines, and equipment.

3.3 ADJUSTING

A. Adjust faces of meters and gages to proper angle for best visibility.

3.4 THERMOMETER SCALE-RANGE SCHEDULE

A. Scale Range for Domestic Cold-Water Piping:

1. 0 to 100 deg F.

B. Scale Range for Domestic Hot-Water Piping:

1. 0 to 250 deg F.

3.5 PRESSURE-GAGE SCALE-RANGE SCHEDULE

A. Scale Range for Water Service and Domestic Water Piping:

1. 0 to 100 psi.

BALL VALVES FOR PLUMBING PIPING 220523.12 - 1

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Bronze ball valves.

1.2 DEFINITIONS

A. CWP: Cold working pressure.

1.3 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 "Submittal Procedures" and the individual sections specifying the work.

B. Product Data: For each type of valve. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads, flange faces, and soldered ends.

3. Set ball valves open to minimize exposure of functional surfaces.

B. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of valve from single source from single manufacturer.

BALL VALVES FOR PLUMBING PIPING 220523.12 - 2

2.2 PERFORMANCE REQUIREMENTS

A. Standards:

1. Domestic water valves intended to convey or dispense water for human consumption must comply with the SDWA, requirements of authorities having jurisdiction, and NSF 61 and NSF 372, or must be certified to be in compliance with NSF 61 and NSF 372 (by an ANSI-accredited third-party certification body) that the weighted average lead content at wetted surfaces is less than or equal to 0.25 percent.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.18 for cast copper solder-joint connections.

3. ASME B16.22 for wrought copper and copper alloy solder-joint connections.

4. ASME B31.9 for building services piping valves.

C. Provide bronze valves made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

D. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

E. Valve Sizes: Same as upstream piping unless otherwise indicated.

F. Valve Actuator Type:

1. Hand Lever: For quarter-turn valves smaller than NPS 4.

G. Valves in Insulated Piping:

1. Provide 2-inch extended neck stems.

2. Extended operating handles with nonthermal-conductive covering material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.

2.3 BRONZE BALL VALVES

A. Bronze Ball Valves, Two Piece with Full Port and Stainless Steel Trim, Threaded or Soldered Ends:

1. Standard: MSS SP-110; MSS SP-145.

2. CWP Rating: 600 psig.

3. Body Design: Two piece.

4. Body Material: Bronze.

5. Ends: Threaded or soldered.

6. Seats: PTFE.

7. Stem: Stainless steel.

BALL VALVES FOR PLUMBING PIPING 220523.12 - 3

8. Ball: Stainless steel, vented.

9. Port: Full.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Do not attempt to repair defective valves; replace with new valves. Remove defective valves from site.

3.2 INSTALLATION OF VALVES

A. Install valves with unions at each piece of equipment arranged to allow space for service, maintenance, and equipment removal without system shutdown.

B. Provide support to piping adjacent to valves such that no force is imposed upon valves.

C. Locate valves for easy access.

D. For valves in horizontal piping, install valves with stem at or above center of pipe.

E. Install valves in position to allow full valve actuation movement.

F. Valve Tags: Comply with requirements in Section 220553 "Identification for Plumbing Piping and Equipment" for valve tags and schedules.

G. Adhere to manufacturer's written installation instructions. When soldering or brazing valves, do not heat valves above maximum permitted temperature. Do not use solder with melting point temperature above valve manufacturer's recommended maximum.

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service, but before final adjusting and balancing. Replace valves exhibiting leakage.

BALL VALVES FOR PLUMBING PIPING 220523.12 - 4

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified CWP ratings are unavailable, provide the same types of valves with higher CWP ratings.

B. Select valves with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.

3.5 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

1. Bronze ball valves, two piece with full port, and stainless steel trim. Provide with threaded or solder-joint ends.

CHECK VALVES FOR PLUMBING PIPING 220523.14 - 1

SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Bronze, swing check valves.

1.2 DEFINITIONS

A. CWP: Cold working pressure.

B. EPDM: Ethylene propylene-diene terpolymer.

C. NBR: Nitrile butadiene rubber (also known as Buna-N).

1.3 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 “Submittal Procedures” and the individual sections specifying the work.

B. Product Data: For each type of valve. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads.

3. Set check valves in either closed or open position.

B. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

CHECK VALVES FOR PLUMBING PIPING 220523.14 - 2

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of valve from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. Standards:

1. Domestic water piping check valves intended to convey or dispense water for human consumption are to comply with the U.S. Safe Drinking Water Act (SDWA), requirements of authorities having jurisdiction, and NSF 61/NSF 372, or to be certified in compliance with NSF 61/NSF 372 by an American National Standards Institute (ANSI)-accredited third-party certification body that the weighted average lead content at wetted surfaces is less than or equal to 0.25 percent.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.18 for cast-copper solder joint.

3. ASME B16.22 for wrought copper solder joint.

4. ASME B31.9 for building services piping valves.

C. Provide bronze valves made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are unacceptable.

D. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

E. Valve Sizes: Same as upstream piping unless otherwise indicated.

2.3 BRONZE SWING CHECK VALVES

A. Bronze, Swing Check Valves with Nonmetallic Disc, Class 150:

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

a. Crane Valves; a Crane Co. brand.

b. Jenkins Valves; a Crane Co. brand.

c. Milwaukee Valve Company.

d. NIBCO INC.

e. Red-White Valve Corp.

f. Stockham; a Crane Co. brand.

http://www.specagent.com/Lookup?ulid=9522 http://www.specagent.com/Lookup?uid=123457198100 http://www.specagent.com/Lookup?uid=123457197773 http://www.specagent.com/Lookup?uid=123457197776 http://www.specagent.com/Lookup?uid=123457197777 http://www.specagent.com/Lookup?uid=123457197780 http://www.specagent.com/Lookup?uid=123457198187

CHECK VALVES FOR PLUMBING PIPING 220523.14 - 3

2. Description:

a. Standard: MSS SP-80, Type 4.

b. CWP Rating: 300 psig.

c. Body Design: Horizontal flow.

d. Body Material: ASTM B62, bronze.

e. Ends: Threaded or soldered. See valve schedule articles.

f. Disc: PTFE.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Do not attempt to repair defective valves; replace with new valves.

3.2 INSTALLATION OF VALVES

A. Provide support of piping adjacent to valves such that no force is imposed upon valves.

B. Locate valves for easy access and where not blocked by equipment, other piping, or building components.

C. Install valves in position that does not project into aisles or block access to other equipment.

D. Verify that joints of each valve have been properly installed and sealed to assure there is no leakage or damage.

E. Check Valves: Install check valves for proper direction of flow.

1. Swing Check Valves: In horizontal position with hinge pin level.

F. Adhere to manufacturer's installation instructions. When soldering or brazing valves, do not heat valves above maximum permitted temperature. Do not use solder with melting point temperature above valve manufacturer's recommended maximum.

CHECK VALVES FOR PLUMBING PIPING 220523.14 - 4

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.

B. End Connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded or soldered connections.

3.5 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

1. Bronze, swing check valves with nonmetallic disc, Class 150, with soldered or threaded end connections.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 1

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Metal framing systems.

3. Thermal hanger-shield inserts.

4. Pipe-positioning systems.

1.3 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 "Submittal Procedures" and the individual sections specifying the work.

B. Product Data: For each type of product. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

2. Galvanized Metallic Coatings: Pregalvanized, hot-dip galvanized, or electro-galvanized.

3. Nonmetallic Coatings: Plastic coated or epoxy powder coated.

4. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

B. Copper Pipe and Tube Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 2

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel or stainless steel.

2.2 METAL FRAMING SYSTEMS

A. MFMA Manufacturer Metal Framing Systems:

1. Description: Shop- or field-fabricated pipe-support assembly, made of steel channels, accessories, fittings, and other components for supporting multiple parallel pipes.

2. Standard: Comply with MFMA-4, factory-fabricated components for field assembly.

3. Channels: Continuous slotted carbon-steel channel with inturned lips.

4. Channel Width: Selected for applicable load criteria.

5. Channel Nuts: Formed or stamped nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

6. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

7. Metallic Coating: Pregalvanized G90 or electroplated zinc.

2.3 THERMAL HANGER-SHIELD INSERTS

A. Insulation-Insert Material for Cold or Hot Piping: ASTM C552, Type II cellular glass with 100-psig or ASTM C591, Type VI, Grade 1 polyisocyanurate with 125-psig minimum compressive strength and vapor barrier.

B. For Clamped Systems: Insert and shield shall cover entire circumference of pipe.

C. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

D. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.

2.4 PIPE-POSITIONING SYSTEMS

A. Description: IAPMO PS 42 positioning system composed of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.

2.5 MATERIALS

A. Carbon Steel: ASTM A1011/A1011M.

B. Structural Steel: ASTM A36/A36M carbon-steel plates, shapes, and bars; black and galvanized.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 3

PART 3 - EXECUTION

3.1 APPLICATION

A. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping materials and installation, for penetrations through fire-rated walls, ceilings, and assemblies.

B. Strength of Support Assemblies: Where not indicated, select sizes of components, so strength will be adequate to carry present and future static loads within specified loading limits.

Minimum static design load used for strength determination shall be weight of supported components plus 200 lb.

3.2 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.

B. Thermal Hanger-Shield Installation: Install in pipe hanger or shield for insulated piping.

C. Pipe-Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.

D. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

E. Install hangers and supports to allow controlled thermal movement of piping systems, to permit freedom of movement.

F. Install lateral bracing with pipe hangers and supports to prevent swaying.

G. Install building attachments to structural wood or steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping.

H. Load Distribution: Install hangers and supports, so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

I. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

J. Insulated Piping:

1. Attach clamps and spacers to piping.

a. Piping Operating Above Ambient Air Temperature: Clamp may project through insulation.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 4

b. Piping Operating Below Ambient Air Temperature: Use thermal hanger-shield insert with clamp sized to match OD of insert.

c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 40 protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.

3. Shield Dimensions for Pipe: Not less than the following:

a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.

b. NPS 4: 12 inches long and 0.06 inch thick.

4. Thermal Hanger Shields: Install with insulation of same thickness as piping insulation.

3.3 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.

3.4 PAINTING

A. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas, and apply galvanizing-repair paint to comply with ASTM A780/A780M.

3.5 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finishes.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports and metal framing systems and attachments for general service applications.

F. Use copper-plated pipe hangers and copper or stainless-steel attachments for copper piping and tubing.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 5

G. Use thermal hanger-shield inserts for insulated piping and tubing.

H. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.

2. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.

3. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 if little or no insulation is required.

4. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.

5. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of noninsulated, stationary pipes NPS 3/4 to NPS 8.

6. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.

7. Adjustable Band Hangers (MSS Type 9): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.

I. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to

NPS 24.

2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 if longer ends are required for riser clamps.

J. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.

2. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.

3. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams.

K. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.

2. Thermal Hanger-Shield Inserts: For supporting insulated pipe.

L. Comply with MFMA-103 for metal framing system selections and applications that are not specified in piping system Sections.

M. Use pipe-positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 6

IDENTIFICATION FOR PLUMBING PIPING 220553 - 1

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipe labels.

2. Valve tags.

1.2 ACTION SUBMITTALS

A. Submittals shall comply with the requirements of Section 013300 “Submittal Procedures” and the individual sections specifying the work.

B. Product Data: For each type of product indicated. On data submittal sheets where more than one product is described, clearly annotate which product(s) is to be supplied.

C. Valve Schedules: For each piping system. Include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color coded, with lettering indicating service and showing flow direction in accordance with ASME A13.1.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to cover full circumference of pipe and to attach to pipe without fasteners or adhesive.

D. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

E. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings. Also include:

1. Pipe size.

2. Flow-Direction Arrows: Include flow-direction arrows on distribution piping. Arrows may be either integral with label or applied separately.

3. Lettering Size: At least 1/2 inch for viewing distances of up to 72 inches and proportionately larger lettering for greater viewing distances.

IDENTIFICATION FOR PLUMBING PIPING 220553 - 2

2.2 VALVE TAGS

A. Description: Stamped or engraved with 1/4-inch letters for piping system abbreviation and 1/2-inch numbers.

1. Tag Material: Brass, 0.04-inch minimum thickness, with predrilled or stamped holes for attachment hardware.

2. Fasteners: Brass beaded chain or S-hook.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Valve Schedules: For each piping system, on 8-1/2-by-11-inch bond paper. Tabulate valve number, piping system, system abbreviation (as shown on valve tag), location of valve (room or space), normal operating position (open, closed, or modulating), and variations for identification. Mark valves for emergency shutoff and similar special uses.

1. Include valve-tag schedule in operation and maintenance data.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping, insulation, and equipment surfaces of incompatible primers, paints, and encapsulants, as well as dirt, oil, grease, release agents, and other substances that could impair bond of identification devices.

3.2 INSTALLATION, GENERAL REQUIREMENTS

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

D. Locate identifying devices so that they are readily visible from the point of normal approach.

3.3 INSTALLATION OF PIPE LABELS

A. Install pipe labels showing service and flow direction with permanent adhesive on pipes.

B. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

IDENTIFICATION FOR PLUMBING PIPING 220553 - 3

1. Within 3 ft. of each valve and control device.

2. At access doors and similar access points that permit view of concealed piping.

3. Within 3 ft. of equipment items and other points of origination and termination.

4. Spaced at maximum intervals of 25 ft. along each run. Reduce intervals to 10 ft. in areas of congested piping and equipment.

C. Do not apply plastic pipe labels or plastic tapes directly to bare pipes conveying fluids at temperatures of 125 deg F or higher. Where these pipes are to remain uninsulated, use a short section of insulation.

D. Flow-Direction Flow Arrows: Use arrows, in compliance with ASME A13.1, to indicate direction of flow in pipes, including pipes where flow is allowed in both directions.

E. Pipe-Label Color Schedule:

1. Domestic Cold-Water Piping: White letters on an ANSI Z535.1 safety-green background.

2. Domestic Hot-Water Piping: White letters on an ANSI Z535.1 safety-green background

3. Domestic Hot-Water Return Piping White letters on an ANSI Z535.1 safety-green background.

4. Sanitary Waste Piping: White letters on a black background.

5. Storm Drainage Piping: White letters on a black background.

3.4 INSTALLATION OF VALVE TAGS

A. Install tags on valves in piping systems, except check valves, valves within factory-fabricated equipment units, shutoff valves, faucets, convenience and lawn-watering hose connections, and similar roughing-in connections of end-use fixtures and units. List tagged valves in a valve schedule in the operating and maintenance manual.

B. Valve-Tag Application Schedule: Tag valves according to size, shape, and color scheme and with captions similar to those indicated in "Valve-Tag Size and Shape" Subparagraph below:

1. Valve-Tag Size and Shape:

a. Domestic Water: 1-1/2 inches, round.

2. Valve-Tag Colors:

a. For each piping system, use the same lettering and background coloring system on valve tags as used in the piping system labels and background.

PLUMBING PIPING INSULATION 220719 - 1

SECTION 220719 - PLUMBING PIPING INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes insulating the following plumbing piping services:

1. Domestic cold-water piping.

2. Domestic hot-water piping.

3. Domestic recirculating hot-water piping.

4. Roof…