B08_Construction_Bid_Schedule_0001.pdf
PDF 90 KB Posted
- Solicitation number
- 140FC223R0005
About this file
This document contains a bid schedule and proposal for the construction of a multi-purpose facility. The U.S. Fish and Wildlife Service is soliciting bids to renovate a historical building in Kennebunk, Maine to serve as the multi-purpose facility. The bid schedule provides a breakdown of estimated costs by construction division. The base bid includes construction of the primary facility according to the plans and specifications for a lump sum price. Additive alternates include options to add photovoltaic systems to generate 40 kW and 80 kW of power. Unit prices are also requested for replacement of rotten structural elements. Bids are due by a specified date and must be prepared according to the terms of the contract documents.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL SCHEDULE
CONSTRUCT MULTI-PURPOSE FACILITY
188 Brown Street Rachel Carson National Wildlife Refuge
Kennebunk, Maine
BEFORE SUBMITTING OFFERS: Offerors shall carefully review the Contract Documents including the Contract Clauses and General Provisions, Additional General Provisions, Labor Standards, Wage Rates, Technical Specifications, and Safety Requirements.
Offers for construction under this invitation shall be prepared in accordance with the Contract Documents and shall be submitted on the proposal schedule presented below.
In addition to the lump sum costs indicated below, provide a breakdown of costs per the attached bid schedule.
ITEM DESCRIPTION QUANTITY/UNITS AMOUNT
A. BASE OFFER ITEM
1. Construction of the Primary Facility, as shown on the plans and specifications: Lump sum $____________
B. ADDITIVES
1. Addition of one (1) 40 kW photovoltaic system, as indicated on the plans and specifications: Lump sum $____________
2. Addition of a second 40 kW photovoltaic system
(to provide a total 80 kW system with Additive 1), as indicated on the plans and specifications: Lump sum $____________
TOTAL AMOUNT OF OFFER: $____________
C. UNIT PRICES
Unit Price No. 1: Replacement of Rotten Sill Price per LF $____________
Unit Price No. 2: Replacement of Rotten Roof Sheathing Price per SF $____________
Unit Price No. 3: Replacement of Rotten Wall Sheathing Price per SF $____________
The undersigned proposes to furnish all labor, materials and equipment required to perform all work specified in accordance with the terms and conditions of this contract for the total price submitted within this proposal schedule.
Date:____________ By:____________________________ (Signature)
(Name/Title)
(Business)
(Business Address)
(City and State)
Bid Schedule
PROJECT TITLE OWNER NAME
Multi-Purpose Facility U.S. Fish & Wildlife Service
PROJECT LOCATION PROJECT NUMBER
Rachel Carson National Wildlife Refuge 5R-ME-770-100.0 Kennebunk, Maine
BID DOCUMENT DATE
June 28, 2022
DIVISION and DESCRIPTION COST
BASE BID
DIVISION 01 - GENERAL REQUIREMENTS $
DIVISION 02 - DEMOLITION/EXISTING CONDITIONS $
DIVISION 03 - CONCRETE $
DIVISION 04 - MASONRY $
DIVISION 05 - METALS $
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES $
DIVISION 07 - THERMAL AND MOISTURE PROTECTION $
DIVISION 08 - OPENINGS $
DIVISION 09 - FINISHES $
DIVISION 10 - SPECIALTIES $
DIVISION 11 - EQUIPMENT $
DIVISION 12 - FURNISHINGS $
DIVISION 14 - CONVEYING EQUIPMENT $
DIVISION 22 - PLUMBING $
DIVISION 23 - HVAC $
DIVISION 26 - ELECTRICAL $
DIVISION 27 - COMMUNICATIONS $
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY $
DIVISION 31 - EARTHWORK $
DIVISION 32 - EXTERIOR IMPROVEMENTS $
DIVISION 33 - UTILITIES $
BASE BID SUBTOTAL $
OVERHEAD $
PROFIT $
BASE BID TOTAL $
BID ADDITIVE 1 - PV SYSTEM (50% POWER GENERATION) $
BID ADDITIVE 2 - PV SYSTEM (ADDITIONAL 50% POWER GENERATION) $
PROJECT TOTAL $
| 1. Construction of the Primary Facility, |
| as shown on the plans and specifications: Lump sum $____________ |
| B. ADDITIVES |
| 1. Addition of one (1) 40 kW photovoltaic system, |
| as indicated on the plans and specifications: Lump sum $____________ |
| Unit Price No. 2: Replacement of Rotten Roof Sheathing Price per SF $____________ |
| Unit Price No. 3: Replacement of Rotten Wall Sheathing Price per SF $____________ |
File details come from the government source that posted it. Updated .