A06_Map_Packet_-_Lucile_Fence_Replacement.pdf

PDF 11 MB Posted

Attached to
LUCILE FENCE REPLACEMENT IDAHO
Solicitation number
140L3626Q0052
Issued by

About this file

This document consists of maps and technical drawings for the Lucile Fence Replacement project managed by the Bureau of Land Management (BLM) in Idaho. The project involves the replacement of fencing at the Lucile Recreation Site, with detailed visual depictions of the scope and location of work.

The maps identify the specific fenceline to be replaced, shown as a red dashed line on aerial imagery and topographic maps. The project includes replacement of 4-wire fencing components, specifically 4-wire corner braces, 4-wire gates, and 4-wire H-braces at designated locations labeled C1 through C5, G1 through G2, and H1 through H7. The fencing encompasses an upper enclosure area surrounding the recreation site. The location is situated near Highway 95 in the Salmon River area of Idaho, approximately 1.5 miles from the Old Lucile Recreation Site and Parking Area. The detailed aerial view on page three shows the fenceline route with labeled structural components and access trails. The project scope also includes a parking area and a gated access point. No specific contract timeline, budget, or award information is provided in these planning and site maps.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lucile Fence Replacement Red line denotes fence to be replaced

Legend

4 Wire Corner Brace

4 Wire Gate

4 Wire H-Brace

Access Trail

Fencing - Upper Enclosure

Old Lucile Recreation Site

900 ft

N➤➤N

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

Lucile Fence Replacement 8.5 x 11 CU2.pdf
Lucile Fence Replacement 8.5 x 11 CU1.pdf
Fence Line Map - Lucile Fence Replacement.pdf

File details come from the government source that posted it. Updated .