A06_Layout_Drawings_revised.pdf
PDF 3 MB Posted
- Attached to
- TELECOM SAFETY REPAIR SAWTOOTH GAOA
- Solicitation number
- 140L3922Q0068
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_for_BLM__-_BLM_Answers_20220725_Sawtooth_0001.docx | DOCX document | |
| Sol_140L3922Q0068_Amd_0001.pdf | ||
| A04_SOW_SAWTOOTH_Final_0001.docx | DOCX document | |
| WD_NV20220027.pdf | ||
| A06_Bid_Schedule.docx | DOCX document | |
| A04_SOW_SAWTOOTH.docx | DOCX document | |
| Sol_140L3922Q0068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sawtooth
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENTUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
FACILITY IMAGE VICINITY MAP
Directions to Sawtooth Mountain
From Southern Nevada District Office – 4701 N Torrey Pines Dr, Las
Vegas, NV 89130
1. Head east toward N Torrey Pines Dr go 207 ft
2. Turn left onto N Torrey Pines Dr go 449 ft
3. Turn left at the 1st cross street onto W Lone Mountain Rd go 0.3 mi
4. Turn right onto N Rancho Dr go 0.5 mi
5. Take the ramp on the left onto US-95 N go 0.7 mi
6. Merge onto US-95 N go 105 mi
7. Turn left onto NV-374 S/Main St go 4.0 mi
8. Turn right onto Rhyolite Rd go 0.8 mi
9. Turn left on Goldbar Road go 0.3 mi
10. Slight right on access road go approx 2 mi
11. Slight Right on dirt road to the top of the mountain go 1.5 mi
12. At the end of the dirt road the site will be straight ahead on the ridge.
Degrees Minutes Seconds Decimal
Latitude: 36° 56' 9.0234" N Latitude: 36.93584 N
Longitude: 116° 51' 2.484" W Longitude: 116.85069 W
Elevation: 5,807 ft. AMSL
External Grounding Layout
Title Sheet
Facility Layout
Soil Resistivity Test Layout
T1
A1
E3
E1
TITLESHEET NO. DWG. NO.
SHEET INDEX
10/16/2020
10/16/2020
10/16/2020
10/16/2020
Revision Date
AREA REFERENCE MAP
SYMBOL
INTERSTATE HIGHWAY
U.S. HIGHWAY
STATE HIGHWAY
DESCRIPTIONSYMBOL
STATE CAPITOL
FACILITY LOCATION
BLM FIELD OFFICE
DESCRIPTION
Soil Resistivity Testing Report4 10/16/2020
/1 /2
T1 1 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
So ut he rn
N ev ad a
D is tr ic t N ev ad a
S A
W T
O O
T H
/1 /2
T1 1 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
So ut he rn
N ev ad a
D is tr ic t N ev ad a
S A
W T
O O
T H
Cabinet Layout3 A2 10/16/2020
Sawtooth kmwong Stamp
/1 /2
A1 2 6
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
D is tr ic t
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
R o b e rt
G a
N u n
So ut he rn
N ev ad a
D is tr ic t N ev ad a
S A
W T
O O
T H
Facility Layout
Sawtooth
1" = 40'
0 0 24 0 40 0 80 00 0 24 0 40 0 80 0
N
New Location for Pepro Cabinet
36° 56' 9.0234" N, 116° 51' 2.484" W
Existing BLM Rohn Shelter to be Removed
Existing BLM Self-Supporting Tower
/1 /2
A2 3 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
T e d
S u m n e rs
N ev ad a
S A
W T
O O
T H
So ut he rn
N ev ad a
D is tr ic t
1/2" = 1'
0 0 1 2.4 2 0 4 00 0 1 2.4 2 0 4 0
N
654321 654321
654321 654321
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
/1 /2
A2 3 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T T e d
S u m n e rs
N ev ad a
S A
W T
O O
T H
So ut he rn
N ev ad a
D is tr ic t
1/2" = 1'
0 0 1 2.4 2 0 4 0
N
654321
654321
E
D
C
B
A
E
D
C
B
A
Cabinet Layout
Sawtooth
39.0°
= to Lat
To TGBTo TGB
Tower Ground Bus Bar (TGB)
Rack Ground Bus Bar (RGB)
Pass-Through Bus Bar at
Electrical Entrance
RF Cable Entrance
20-Foot Articulating Mast
Electrical Entrance Box
Concrete Pedestal with UFER (x4)
E q u ip m e n t E q u ip m e n t
SOLAR PANEL INSTALLATION
SOLAR PANEL GROUNDING
EQUIPMENT INSTALLATION
AND GROUNDING (TYPICAL)
Repeater
Duplexer
Batteries
Rack Ground Bus Bar (RGB)
#6 AWG, Stranded Green-Jacketed Grounding Conductors Using Single-Hole UL 467 Listed Connectors
Duplexer
18 Repeater
18 Battery Shelf
RGB Grounded to Pass-Through Bar with #2 AWG, Green-Jacketed Grounding Conductor Using Two-Hole UL 467 Listed Connectors
Tower Ground Bus Bar (TGB)
RF Cable Entrance
Exhaust
Air Intake
Ballast Plates
UFER Ground Pads
1- Bay Micro Cabinet
20-Foot Articulating Mast
Exhaust
Air Intake
Electrical Entrance Box
UL 1449 Surge Protection (x2)
100 Amp Filters (x4)
Wiring Entry
Pass-Through Bus Bar
4 6
Soil Resistivity Testing Report
Sawtooth
5 10 15 20 Testing Notes
Meter Readings Ω Ω Ω Ω
1 of 2 20 16.2 6.5
2 of 2 21 19.9 5.7
Soil Resistivity Calculations
5 10 15 20 p = (Ω-cm) p = (Ω-cm) p = (Ω-cm) p = (Ω-cm)
1 of 2 19,150 31,023 0 24,895
2 of 2 20,108 38,109 0 21,831
Enter Highest Amount (Worst Case) 38,109
Grounding Enhancement Material (GEM) 85%
Calculation with GEM 32,393
Test Completed By
Date
Client/Project
Site Location Name /ID
Ground Resistance Tester
Model:
Serial Number:
Calibration Date:
Soil Description
Ambient Conditions
Top Soil Temperature:
Present Conditions (dry, rain, snow):
Date of last precipitation:
Min Average Max
590 2370 7000
340 4060 16,300
1020 15,800 135,000
59,000 94,000 458,000
NOTES
GEM Can lower the soil resistivity between 15 and
30 % depending on how much is used
TEST DATA
Test Location Spacing (Test Depth) Feet p= 191.5 x A x R p= soil reisistivity in Ω-cm
A = Distance betw een test rods (in feet)
R = Resistance obtained from tester
Test Location
Conversion to (Ω-cm) - AUTO CALCULATION
Same, with varying proportions of sand and gravel
Gravel, sand, stones with little clay or loam
Dry
Two Weeks
Typical Soil Descriptions
Ashes, cinders, brine, waste
Clay, shale, gumbo, loam
GRT300
1989519
Typical Resistivity (approx.), Ω-cm
Testing completed at multiple depths in three separate directions across the existing radio facility. 10-foot Depth shall be used for grounding system design based on 30-inch deep trench with ground rod driven vertically with 6 inches extending above trench bottom.
The highest soil resistance tested at 10-foot measuring 32,393
(Ω-cm), shall be used as a basis for adding additional ground rods to obtain a 25 Ohm or less final resistance to ground of the grounding system.
Single ground resistance is calculated at 104 Ohms. The use of six 10-foot long, 3/4-inch diameter ground rods is required to achieve 24.5 Ohms 90 Deg. Fahrenheit
72 Deg. Fahrenheit
Robert GaNun
07/22/20
Bureau of Land Management
Sawtooth Peak
Rock Cliff with large rock, Gravel, sand, stones with little clay or
4/27/2020
Extech
/1 /2
E1 5 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
T e d
S u m n e rs
N e v ad a
S A
W T
O O
T H
So ut he rn
N ev ad a
D is tr ic t
1/8” = 1'
0 ft. 6 ft. 10 ft. 20 ft.0 ft. 6 ft. 10 ft. 20 ft.
N
/1 /2
E1 5 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T T e d
S u m n e rs
N e v ad a
S A
W T
O O
T H
So ut he rn
N ev ad a
D is tr ic t
1/8” = 1'
0 ft. 6 ft. 10 ft. 20 ft.
N
Soil Resistivity Test Layout
Sawtooth
5 10 15 20
Ω Ω Ω Ω
20 16.2 6.5
21 19.9 5.7
5 10 15 20 p = (Ω-cm) p = (Ω-cm) p = (Ω-cm) p = (Ω-cm)
19,150 31,023 0 24,895
20,108 38,109 0 21,831
38,109
85%
32,393
GEM Can lower the soil resistivity between 15 and
30 % depending on how much is used
Spacing (Test Depth) Feet p= 191.5 x A x R p= soil reisistivity in Ω-cm
A = Distance between test rods (in feet)
R = Resistance obtained from tester
Conversion to (Ω-cm) - AUTO CALCULATION
/1 /2
E3 6 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
N ev ad a
S A
W T
O O
T H
So u th er n N ev ad a D is tr ic t
1/8" = 1'
0 ft. 6 ft. 10 ft. 20 ft.0 ft. 6 ft. 10 ft. 20 ft.
N
654321 654321
654321 654321
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
1 1
Ground Ring – Four (4) 10 ft. long x 3/4 in. ground rods space 10 ft. apart & two radials with two (2) 10 ft. long X ¾ in. ground rods in each radial spaced 20 ft apart.
COMPLEX GROUNDING SYSTEM CALCULATIONS
Soil Resistivity = 32,393 Ω-cm Rtotal = 16 Ω
Recommend backfill with grounding enhancement material and low resistance soil.
Typical Ground Rod ¾ in. Diameter 10 ft. Long
5 #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
Shelter Ground Ring #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
1B Concrete Encased Electrode Bonded to Ground Ring
20 Solar Panel Grounding
3 Tower Ground Bus Bar
External Grounding Layout
Sawtooth
1B
1B1B
1B
1 1
R1 R2
QTY
Ground
Rods
R 1/R 1/R1+R2 Rtotal (Ω)
Shelter Ground Ring
(10 foot Spacing) (R1) 4 33.92 0.0295
(2) Radials (20 ft spacing) 4 30.38 0.0329
Complex Grounding Electrode System Resistance
Rtotal (Ω) =
0.0624 16.03
The combined (parallel) resistance of all of the subsystems is now calculated by entering the resistance of each subsystem:
Ground Shelter Ground Tab to Ground Ring
Ground Shelter Ground Tab to Ground Ring
Radial Ground Radial Ground
3/4 in.
30 in. Deep Trench
10 ft
Grade
6 in
12 Feet
Ground Rod Installation
3/4 in.
30 in. Deep Trench
10 ft
Grade
6 in
12 Feet
Ground Rod Installation
Grounding System Components
| Sawtooth.vsdx |
| Title Page |
| A1 - Facility Layout |
| A2 Cabinet Layout |
| Soil Testing Report |
| Soil Restivity |
| E3 External Grounding |
File details come from the government source that posted it. Updated .