SAWTOOTH – BID SCHEDULE
| BID ITEM |
| SOW REF |
| Unit of Measure |
| UNITS |
| MATERIALS |
| LABOR |
| TOTAL |
2.3 DESIGN DRAWINGS (A&E)
| Civil Improvement Plans |
| 2.3 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Electrical One-Line for Modification to Existing Electrical Service |
| 2.3 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Third Party Inspection Services |
| 3.6 |
| each |
| 1 |
| $ |
| $ |
| $ |
| 2.3 Design Services - SUBTOTAL |
| $ |
| $ |
| $ |
3.4 CIVIL DEVELOPMENT AND DEMOLITION
| Shelter Removal, Disposal, to Include Grounding Systems and RF Cabling |
| 3.4 |
| Lump Sum |
| 1 |
| $ |
| $ |
| $ |
| Remove and Salvage Equipment Racks, Batteries, Charger/Controller and Deliver to BLM Office |
| 3.4 |
| Lump Sum |
| 1 |
| $ |
| $ |
| $ |
| 3.4 Civil Development - SUBTOTAL |
| $ |
| $ |
| $ |
3.5.1 PHOTOVOLTAIC POWER AND BATTERY BACKUP SYSTEM
| Procure and Install Solar Panels |
| 3.5.1 |
| each |
| 2 |
| $ |
| $ |
| $ |
| Solar Panel Frame |
| 3.5.1 |
| Lineal Foot |
| 1 |
| $ |
| $ |
| $ |
| Procure and Install External Wiring between Solar Panels and Entrance to the Shelter |
| 3.5.1 |
| Lineal Foot |
| 20 |
| $ |
| $ |
| $ |
| Procure and Install Photovoltaic Charger/Controller (60 - Ampere) including internal wiring |
| 3.5.1 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Procure and Install Batteries |
| 3.5.1 |
| each |
| 4 |
| $ |
| $ |
| $ |
| Install DC Wiring |
| 3.5.1 |
| each |
| 3 |
| $ |
| $ |
| $ |
| 3.5.1 Photovoltaic and Battery System - SUBTOTAL |
| $ |
| $ |
| $ |
3.7 COMMUNICATIONS EQUIPMENT SHELTER INSTALLATION
| Deliver, and Install New Pepro Cabinet with 20-foot articulating mast |
| 2.6 |
| Lump Sum |
| 1 |
| $ |
| $ |
| $ |
| 3.7 Shelter - SUBTOTAL |
| $ - |
| $ - |
| $ - |
3.11 EXTERNAL RF CABLE & WAVEGUIDE INSTALLATION
| RF Cable Routing and Support (Pipe-Masts) |
| 3.11 |
| RF Cable Entrance Installation and Sealing |
| 3.11 |
| each |
| 1 |
| $ |
| $ |
| $ |
| RF Cable Testing and Report |
| 3.17 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Ground RF Cable to Entry Port using Stainless Steel Strap Provided by Pepro |
| 3.11 |
| each |
| 1 |
| $ |
| $ |
| $ |
| 3.11 External Cable Installation - SUBTOTAL |
| $ |
| $ |
| $ |
3.12 ANTENNA SYSTEMS INSTALLATION
| Antenna Installation (Secured, Plumb, RF Cable Weather Seal) |
| 3.12 |
| each |
| 1 |
| $ |
| $ |
| $ |
| 3.12 Antenna Systems - SUBTOTAL |
| $ |
| $ |
| $ |
3.14 COMMON EXTERNAL GROUNDING SYSTEM
| Trenching for Grounding System |
| 3.14 |
| per lineal foot |
| 140 |
| $ |
| $ |
| $ |
| Provide and Install Ground Rods: (3/4" diameter, 10-foot long) Includes Exothermic Connections |
| 3.14 |
| each |
| 8 |
| $ |
| $ |
| $ |
| Provide and Install Electrolytic Ground Rods: (2.12" diameter, 20-foot long) Includes Exothermic Connections |
| 3.14 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Grounding Enhancement Materials |
| 3.14 |
| Per Bag |
| 51 |
| $ |
| $ |
| $ |
| Provide and Install External Grounding Conductor: # 2 AWG, bare, solid, tinned, copper for Grounding System |
| 3.14 |
| per lineal foot |
| 140 |
| $ |
| $ |
| $ |
| Backfilling for Grounding System (Includes Grounding Enhancement Material for High Soil Resistivity Sites) |
| 3.14 |
| per lineal foot |
| 140 |
| $ |
| $ |
| $ |
| Backfilling for Grounding System (Without Grounding Enhancement Material for Low Soil Resistivity Sites) |
| 3.14 |
| per lineal foot |
| 140 |
| $ |
| $ |
| $ |
| Bond Existing Tower Ground Bus Bar (TGB) to Ground Ring - Remote Facilities |
| 3.14 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Concrete Encased Electrodes in Shelter Foundation Connected to the Shelter Ground Ring |
| 3.14 |
| each |
| 4 |
| $ |
| $ |
| $ |
| Ground Each Grounding Tab on the Cabinet (x3) to the Grounding System |
| 3.14 |
| each |
| 3 |
| $ |
| $ |
| $ |
| Solar Panel and Framework Grounding |
| 3.14 |
| Lump Sum |
| 1 |
| $ |
| $ |
| $ |
| RF Cables Grounded at Base of Pipe Mast |
| 3.14 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Ground RF Cable to Entry Port using Stainless Steel Strap Provided by Pepro |
| 3.14 |
| each |
| 1 |
| $ |
| $ |
| $ |
| RF Cable Surge Protection |
| 3.14 |
| 3.14 External Grounding - SUBTOTAL |
| $ |
| $ |
| $ |
3.16 EQUIPMENT RACKS AND CABINETS
| Radio Equipment Installation in Racks and Cabinets |
| 3.16 |
| each |
| 1 |
| $ |
| $ |
| $ |
| Ancillary Equipment Installation in Racks and Cabinets |
| 3.16 |
| each |
| 2 |
| $ |
| $ |
| $ |
| Ground Rack-Mounted Equipment (per device to be grounded) |
| 3.16 |
| each |
| 3 |
| $ |
| $ |
| $ |
| 3.16 Equipment Racks and Cabinets - SUBTOTAL |
| $ |
| $ |
| $ |
| COST SUMMARY |
| MATERIALS |
| LABOR |
| TOTAL |
| LABOR AND MATERIALS - SUBTOTAL |
| $ |
| $ |
| $ |
| MATERIAL HANDLING AND DELIVERY |
| $ |
| $ |
| $ |
| PROJECT MANAGEMENT FEES |
| $ |
| $ |
| $ |
| TOTAL ESTIMATED COST |
| $ |
| $ |
| $ |