Questions_for_BLM__-_BLM_Answers_20220725_Sawtooth_0001.docx

DOCX document 6 MB Posted

Attached to
TELECOM SAFETY REPAIR SAWTOOTH GAOA
Solicitation number
140L3922Q0068
Issued by

View the file

Other files

File Type Posted
Sol_140L3922Q0068_Amd_0001.pdf PDF
A04_SOW_SAWTOOTH_Final_0001.docx DOCX document
WD_NV20220027.pdf PDF
A06_Bid_Schedule.docx DOCX document
A04_SOW_SAWTOOTH.docx DOCX document
A06_Layout_Drawings_revised.pdf PDF
Sol_140L3922Q0068.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Are we able to remove part of the rock out cropping’s to get the new Pepro building to site? See pic below.

BLM Answer 7/25/22: This is not the correct location of the new radio infrastructure. See attached pictures. Install new shelter adjacent to the old BLM abandoned tower location. SOW has been updated.

2) Once new Site is commissioned can we disassembly existing shelter onsite for removal? Or does it need to be removed in 1 piece?

BLM Answer 7/25/22: Plan for removal in one piece. If BLM Radio Lead states they do not need the shelter, you may disassemble. Remove and demolish the existing foundation at least 2’ below ground elevation and fill with native material.

image1.png image2.png image3.png