A06-Electrical.pdf

PDF 71 KB Posted

Attached to
BLM-CO STATE BRIDGE BUILDING REMOVAL Federal contract opportunity
Solicitation number
140L1724Q0027
Issued by
Department of the Interior Bureau of Land Management Colorado Region

About this file

This document is a section of the technical specifications for the State Bridge Building Removal project. The scope of work includes disconnecting and removing the existing electrical and phone systems from the building prior to demolition, and then installing the existing circuit breaker panel and phone system components onto a new "Wood Panel" as shown on the drawings. The work must be performed by an electrician licensed in Colorado and follow the National Electrical Code. No direct payment will be made for this work, as it is considered incidental to the overall contract. The related federal contract opportunity is for the BLM-CO State Bridge Building Removal project, solicitation number 140L1724Q0027, issued by the Department of the Interior Bureau of Land Management Colorado Region.

View the file

Other files for this federal contract opportunity

Other files attached to BLM-CO STATE BRIDGE BUILDING REMOVAL, newest first.
File Type Posted
Sol_140L1724Q0027_Amd_0002.pdf PDF
Sol_140L1724Q0027_Amd_0001.pdf PDF
A06-Building_Details.pdf PDF
B03-DOL_Wage_Determination.pdf PDF
A04-SOW.pdf PDF
Sol_140L1724Q0027.pdf PDF
A06-Location_of_Site.pdf PDF
B13_-Past_Performance_Questionnaire.doc DOC document
A06-Building_Demo.pdf PDF
A06-Rough_Carpentry.pdf PDF
A06-_Existing_Site_Plan.pdf PDF
A04-BID_Schedule.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIC ELECTRICAL REQUIREMENTS

State Bridge Building Removal 02/24

16010 - 1

SECTION 16010

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: Work shall include all items, labor, and materials needed, to keep the electrical and phone systems functional after demolition of the building is completed and the Electrical Circuit Breaker Box and Phone Systems have been installed on the Wood Panel as shown on the drawings.

1.2 QUALITY ASSURANCE

A. Electrician Qualifications: All electrical work shall be performed by an electrician(s) with a valid electrical license to work in Colorado, as licensed through the Department of Regulatory Agencies.

B. Governing Standards: Electrical work shall be according to the most current National Electrical Code (NFPA 70).

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 DEMOLITION

A. General: Verify that the electrical system and phones system are in working order prior to starting demolition.

B. Electrical System: Prior to demolition of the building, disconnect and remove from the circuit breaker panel all electrical wiring and items attached to the building. Turn off power prior to demolition of the building. Electrical wiring within the breaker panel that are not attached to the building, including but not limited to supplying power to the well pump and RV Pedestals may remain connected.

C. Low Voltage Phone System: Prior to demolition of the building, remove the phone call box located on the front of the building and detach the phone junction box located on the back of the building. Disconnect and detach all wiring and items of the phone system attached to the building prior to demolition.

3.2 INSTALLATION

A. Electrical System: Install the existing circuit break panel onto the “Wood Panel” as shown on the drawings. Salvaged electrical wiring and miscellaneous electrical items may be re-used for the new installation if

State Bridge Building Removal 02/24

16010 - 2 undamaged and functional, contractor to replace damaged items with similar if applicable.

B. Low Voltage Phone System: Install the salvaged phone system components on the “Wood Panel” as shown on the drawings and as directed by the COR and according to recognized industry practices. Salvaged wiring and miscellaneous items may be used for the new installation if undamaged and functional, contractor to replace damaged items with similar if applicable. Phone shall be functional when installation is complete.

C. Operational Test: When electrical and phone installations are complete, the Contractor shall energize electrically connected equipment and demonstrate that the electrical systems and phone are both functional.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT

A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.

END OF SECTION