A06 Drawings_Specifications.pdf

PDF 2 MB Posted

Attached to
FLNI TREE PRUNING AND SOIL IMPROVEMENTS Federal contract opportunity
Solicitation number
140P4221R0005
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document contains drawings and specifications for soil remediation and tree replacement work at a national park. The project involves applying compost in 10-foot wide bands around existing and future tree plantings, with approximately 7 cubic yards of compost for each individual tree planting. Soil conditions and tree counts are provided for different tree species. The related federal contract opportunity is solicitation number 140P4221R0005 from the Department of the Interior National Park Service Northeast Region for tree pruning and soil improvements work at the park. Pricing, response dates, and other contractual terms are not specified in the provided files.

View the file

Other files for this federal contract opportunity

Other files attached to FLNI TREE PRUNING AND SOIL IMPROVEMENTS, newest first.
File Type Posted
Sol_140P4221R0005_Amd_0003.pdf PDF
Appendix Memorial Grove Demonstration Lot Plant_0002.pdf PDF
Appendix Evaluation of 40 Groves at the Flight 93 Memorial_0002.pdf PDF
Sol_140P4221R0005_Amd_0002.pdf PDF
Sol_140P4221R0005_Amd_0001.pdf PDF
Sol_140P4221R0005.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
B03 Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Allee R ed M aples-approxim ately

Along the inside road ofthe sem i circle.

M em orialG roves-40 G roves of40 trees each.Betw een the innerand outerroads.

D em onstration

Plot Location

10'

APPLY 8" OF COMPOST IN 10' W

IDE BAND

CENTERED ON FUTURE TREE PLANTING

2'

SCOOP AND DUMP COMPOST INTO

TOP 24" OF SOIL

FUTURE TREE REPLACEMENT PLANTING

10'

240'

ROAD

ALLÉE

10' W

IDE BAND CENTERED ON ROW

OF FUTURE TREE REPLACEMENT PLANTINGS

TO RECEIVE COMPOST AMENDMENT THROUGH SCOOP & DUMP METHOD

FUTURE TREE REPLACEMENT PLANTINGS

30'

EACH TREE PLANTING TO RECEIVE

APPROX. 7 CU YARDS OF COMPOST

SCALE: 1/8" = 1'-0"

GROVE SOIL REMEDIATION AND TREE REPLACEMENT - SECTION

SCALE: 1" = 30'-0"

GROVE SOIL REMEDIATION AND TREE REPLACEMENT - PLAN

O bserved

T ree C on d ition by S p ecies

G O

D

M

D

E R

A

TE

FA

IR

PO

R

E

ISSIN

G

TO

TA

L cer rubrum cer saccharum

Q uercus alba

Q uercus bicolor

Q uercus coccinea

Q uercus m ontana

Q uercus velutina

U N

ID

E

N

TIFIE

TO

TA

L

T ree C on d ition ap

File details come from the government source that posted it. Updated .