A06_Complete_Set_9-22-2010.pdf
PDF 2 MB Posted
- Attached to
- WA TURNBULL NWR GEOTHERMAL REPAIR
- Solicitation number
- 140FC324Q0014
About this file
This document provides details on a federal solicitation for repair services at the Turnbull National Wildlife Refuge in Washington. The solicitation number is 140FC324Q0014 and is seeking offers to perform geothermal repairs at the refuge. The solicitation was issued by the U.S. Fish and Wildlife Service within the Department of the Interior. Responses are due by the date specified in the full solicitation document. The solicitation describes the required repair services and provides other relevant details to inform potential offerors on the agency's requirements and evaluation criteria.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
È
C
DIFFUSER, REGISTER AND GRILLE SCHEDULE
PLAN
MFGR MODEL
NOMINAL
NECK SIZE MATERIAL
COLOR/
REMARKS
CODE FACE SIZE FINISH
SG-1 TITUS 300FL 18X10 18X10 ALUMINUM STANDARD WHITE 1, 2
SG-2 TITUS 300FL 12X8 12X8 ALUMINIUM STANDARD WHITE 2, 3
CD-1 TITUS TMRA-AA 27" 12" ALUMINUM STANDARD WHITE ADJUSTABLE
RG-1 TITUS 350R 20X20 20X20 ALUMINUM STANDARD WHITE 4
NOTES:
1. SET DOWNWARD BLADE ANGLE AT 45Á.
2. SET DOWNWARD BLADE ANGLE AT 22.5Á.
3. PROVIDE WITH VOLUME EXTRACTOR.
4. INSTALL RETURN GRILLE 10'-0"A.F.F.
5. SG-1, CD-1 AND RG-1 ALL PART OF PHASE 1 AND PHASE 2 BIDS.
6. SG-2 PART OF PHASE 2 BID ONLY.
7. SG-1 IN WOOD SHOP IN PHASE 2 BID ONLY.
PROPELLER CEILING FAN SCHEDULE
PLAN FAN
MFGR MODEL NO. DRIVE CFM RPM HP
POWER
ACCESSORIES REMARKS
CODE LOCATION (V/PH/HZ)
CF-1 SEE M-3 EMERSON HF956W 1 DIRECT 20,000 MAX 280 0.82 AMPS 120/1/60 1,2 -
ACCESSORIES:
1. PROVIDE DOWNROD AS REQUIRED TO LOCATE BOTTOM OF FAN AT 15'0" A.F.F.
2. PROVIDE SPEED CONTROLLER SW81 FOR EACH FAN.
HEAT EXCHANGER
REMARKS
UNIT VENTILATOR/FAN COIL SCHEDULE
ROOM#
PLAN
MFGR/MODEL
ROOM TYPE OF UNIT UNIT AIRFLOW OSA AIRFLOW WINTER EAT EWT/LWT
UNIT HEATING
HWS/GPM MAX WPD MOTOR POWER RUNOUTS AND
CODE NAME UNIT SIZE (CFM) (-XÁF) (ÁF) (ÁF) FLOW (FT) AMPS (V/PH/HZ) VALVE SIZE
101 UV-1 CARRIER/40UV OFFICE HOT WATER COIL 050 275 N/A 60 125/119.6 8064 3 0.9 1.8 115/1/60 7/8" OD 102 UV-1 CARRIER/40UV OFFICE HOT WATER COIL 050 275 N/A 60 125/119.6 8064 3 0.9 1.8 115/1/60 7/8" OD 103 UV-1 CARRIER/40UV OFFICE HOT WATER COIL 050 275 N/A 60 125/119.6 8064 3 0.9 1.8 115/1/60 7/8" OD 104 UV-1 CARRIER/40UV CREW ROOM HOT WATER COIL 050 275 N/A 60 125/119.6 8064 3 0.9 1.8 115/1/60 7/8" OD 106 UV-1 CARRIER/40UV LUNCH ROOM HOT WATER COIL 050 275 N/A 60 125/119.6 8064 3 0.9 1.8 115/1/60 7/8" OD
FIRE CACHE FC-1 CARRIER/42CG ABOVE SHOWER
CEILING HOT WATER COIL 4 400 N/A N/A N/A 14000 1 0.3 1.3 115/1/60 5/8" OD
SOLAR WATER PRE-HEATER & DECOUPLING TANK SCHEDULE
REFERENCE PERFORMANCE DATA
PLAN
SERVICE MFGR MODEL LOCATION
FUEL STORAGE INPUT ELECTRIC DETAIL REMARKS
CODE TYPE (GAL) (KW) SERVICE REF
PWH-1 GROUND LOOP, PRE-HEATER
DOMESTIC SOLAR HT PRODUCTS SSC-80
MEZZANINE
ABOVE WASH
AREA
SOLAR 80
SEE SOLAR
PANEL
SCHEDULE
N/A DETAIL 1 SHEET
M-6
PWH-2 FIRE CACHE DHW BRADFORD WHITE SW-2-40R-L SHOWER SOLAR 40
SEE SOLAR
PANEL
SCHEDULE
N/A DETAIL 1 SHEET
M-6
DCT-1 GROUND LOOP, DECOUPLING
TANK FROM SOLAR HT PRODUCTS GL-80
(NON-ASME)
MEZZANINE
ABOVE WASH
AREA
SOLAR 80 N/A N/A SEE PLAN M-3 (1)
REMARKS:
(1) - GL-80 TANK HAS 2" NPT-M FITTINGS FOR BOTH HOT WATER OUTLET AND COLD INLET, TRANSITION TO 1" AS REQUIRED.
SOLAR PANEL SCHEDULE
REFERENCE PERFORMANCE DATA
PLAN
SERVICE MANUFACTURER LOCATION
TILT ANGLE OUTPUT PANEL TUBE HEADER MINIMUM FLOW RATE MAX DRY REMARKS
CODE MIN/MAX (BTU/YR) TYPE TYPE MATERIAL STAGANTION (GPM/PANEL) WEIGHT
SP-1 PWH-1 HELIODYNE SEE DRAWING
M-2 45/50 207 MILLION FLAT COPPER COPPER 395 F 0.8 - 1.3 153 LBS (1), (2), (3)
SP-2 PWH-2 HELIODYNE SEE DRAWING
M-7 45/50 N/A FLAT COPPER COPPER 395 F 0.8 - 1.3 153 LBS (1), (2), (3)
SCHEDULE NOTES:
(1) PANEL SIZE AND NUMBER OF TUBES PER PANEL TO BE DETERMINED BY PANEL SUPPLIER.
(2) FLOW RATE IS PER PANEL.
(3) TILT ANGLE BASED ON OPTIMUM SOLAR PERFORMANCE, VERIFY FROM MANUFACTURER OPTIMUM TILT ANGLE FOR SNOW TO SLIDE OFF, TILT ANGLE FOR SNOW REMOVAL TAKES PRECEDENCE.
EXPANSION TANK SCHEDULE
REFERENCE GENERAL PERFORMANCE
REMARKS
MARK MFGR MODEL SERVICE LOCATION TYPE
TANK ACCEPT.
VOLUME VOLUME
ET-1 AMTROL ST-12 SOLAR MEZZANINE DIAPHRAGM 12.8 6.4 1,2
ET-2 AMTROL ST-12 GROUND LOOP MEZZANINE DIAPHRAGM 12.8 6.4 1,2
SCHEDULE NOTES:
1. ALL EXPANSION TANKS SHALL BE SUITABLE FOR USE WITH 50% PROPYLENE GLYCOL FOR SOLAR LOOP AND 30% GLYCOL FOR GROUND LOOP.
2. SUSPEND UNITS FROM STRUCTURE ABOVE WITH THREADED RODS.
PUMP SCHEDULE
PLAN
MFGR MODEL NO. GPM
HEAD
RPM HP
POWER
DRIVE (1) REMARKS
CODE (FT) (V/PH/HZ)
P-1 GRUNDSFOS UPS 40-160/2 61.5 20 3447 3/4 230/1/60 VARIABLE (2)
P-2 GRUNDSFOS UPS-32-160/2 12 40 3477 3/4 115/1/60 VARIABLE (2)
P-3 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 VARIABLE (2)
P-4 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-5 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-6 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-7 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-8 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-9 GRUNDSFOS UPS-32-80/2 15 18 3495 1/2 115/1/60 CONSTANT (1)
P-10 GRUNDSFOS UPS-32-80/2 12 18 3495 1/2 115/1/60 VARIABLE (2)
P-11 GRUNDSFOS UPS-32-40/2 2 10 1712 0.3 115/1/60 VARIABLE (2)
SCHEDULE NOTES:
(1) STARTER BY ELECTRICAL.
(2) CONTROLLER AND DRIVE SUPPLIED BY SOLAR HEATING CONTRACTOR.
WATER SOURCE HEAT PUMP SCHEDULE
PLAN CODE MFGR MODEL NO. TYPE
HEATING REMARKS
SOURCE IN SOURCE LOAD IN LOAD HEATING CAPACITY HEAT OF EXTRACTED
KW COP
(ÁF) GPM (ÁF) MBTU/HR MBTU/HR
HP-1 WATER FURNACE NS-070 WATER TO AIR 30 15 60 1850 CFM 52.5 36.8 4.65 3.34 (1)(2) HP-2 WATER FURNACE NS-048 WATER TO AIR 30 9 60 1430 CFM 37.1 26.5 3.13 3.51 (1)(2) HP-3 WATER FURNACE NS-070 WATER TO AIR 30 15 60 1850 CFM 52.5 36.8 4.65 3.34 (1)(2) HP-4 WATER FURNACE EW-060 WATER TO WATER 30 15 119.6 15 GPM 53.7 29.0 7.28 2.18 (1)(2) HP-5 WATER FURNACE NS-048 WATER TO AIR 30 9 60 1430 CFM 37.1 26.5 3.13 3.51 (1)(2) HP-6 WATER FURNACE NS-048 WATER TO AIR 30 9 60 1430 CFM 37.1 26.5 3.13 3.51 (1)(2)
SCHEDULE NOTES
1. PERFORMANCE BASED UPON 20% CONCENTRATION BY VOLUME OF METHANOL FOR A FREEZE PROTECTION OF 0ÁF.
2. PROVIDE WITH INTELLI START.
jburby Rectangle jburby Text Box
22.5 Tons total
jburby Line
SEQUENCE OF OPERATION
ITEM INPUT OUTPUT SET POINT DEADBAND STATUS
TC ANALOG N/A 60Á +5ÁF ABOVE/TT MONITOR, USE (TC-TT) AS
CONTROL INPUT
TT ANALOG N/A 60Á N/A MONITOR, USE (TC-TT) AS
CONTROL INPUT
P-11 DIGITAL DIGITAL N/A N/A
(TC-TT) IS EQUAL TO OR
GREATER THAN 5ÁF, ENERGIZE
P-11
FC-1 DIGITAL DIGITAL N/A N/A TT IS EQUAL TO OR GREATER
THAN 160ÁF
NMS_TURNBULL
SPOKANE COUNTY, WASHINTON
PANEL: F VOLT:240/120 AMP:400 PHASE:1 WIRE:3
LOCATION (ROOM #): MAINTENANCE BLDG. NOTE: DOOR IN DOOR MODEL
MFG: SQUARE D OR EQUAL AIC RATING: 10,000
TYPE: 'NQ' GROUND BUS: YES
TYPE OF MAIN: 400A MCB MOUNTING: SURFACE
FEEDER: SEE ONE-LINE FED FROM: MAIN DISTRIBUTION SEE ONE LINE
P BRK CKT CKT BRK P
CIRCUIT DESCRIPTION L AMP NO A B NO AMP L CIRCUIT DESCRIPTION
UV-1 1 20 1 240 2 20 1 UV-1
UV-1 1 20 3 240 4 20 1 UV-1
UV-1 1 20 5 240 6 20 2 P-1
P-2 1 20 7 1656 8 ** * " "
HP-1 2 70 9 4400 10 70 2 HP-3
" " * ** 11 4400 12 ** * " "
HP-2 2 45 13 2880 14 70 2 HP-4
" " * ** 15 2880 16 ** * " "
HP-5 2 45 17 2880 18 45 2 HP-6
" " * ** 19 2880 20 ** * " "
SPARE 1 20 21 368 22 20 1 SPARE
P-3 1 20 23 1176 24 20 1 P-4
P-5 1 20 25 1176 26 20 1 P-6
P-7 1 20 27 1176 28 20 1 P-8
P-9 1 20 29 1176 30 20 1 P-10
MECH MEZZANINE LIGHTING 1 20 31 256 32 20 1 SPARE
SPARE 1 20 33 0 34 20 1 SPARE
SPARE 1 20 35 0 36 20 1 SPARE
BUSSED SPACE 37 0 38 BUSSED SPACE
BUSSED SPACE 39 0 40 BUSSED SPACE
BUSSED SPACE 41 0 42 BUSSED SPACE
PHASE TOTALS 29024 30136
TOTAL WATTS 59160
TOTAL AMPS 284
| COVER_SHEET-22X34 |
| S-1-22X34 |
| S-2-22X34 |
| S-3-22X34 |
| M-1-22X34 |
| M-2-22X34 |
| M-3 -22X34 |
| M-4-22X34 |
| M-5-22X34 |
| M-6-22X34 |
| M-7-22X34 |
| E-1-22X34 |
| E-2-22X34 |
| E-3-22X34 |
| E-4-22X34 |
| E-5-22X34 |
| C-1-22X34 |