This is a Quality Assurance Plan Evaluation Worksheet for RSFO (Rocky Mountain Ski Resort Foundation) Recreation Sites maintenance and operations.
The document provides inspection templates for three recreation sites: White Mountain Petroglyphs Rec Site, Killpecker Sand Dunes Rec Site, and Three Patches Day Use Site. Each site has designated work requirements referenced to contract standards (C.5.c.i through C.5.c.viii) covering general maintenance, policing grounds, vault toilet maintenance, picnic table upkeep, and fire ring/grill maintenance. White Mountain Petroglyphs requires maintenance of one double vault toilet; Killpecker Sand Dunes requires maintenance of two double vault toilets, 15 picnic tables, and 9 fire rings; Three Patches Day Use Site requires maintenance of two single vault toilets, 14 picnic tables, and 13 fire rings/grills. The worksheet includes fields for the inspector to document inspection dates, specify performance frequency (daily, weekly, monthly, twice weekly, or three times weekly), record the percentage of payment earned, and evaluate performance as satisfactory or unsatisfactory. Each site includes a "Recommend" row for inspector commentary and a "Notes during this inspection" section for detailed observations. The document is designed to track contractor performance against established standards to determine monthly payment authorization.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_140L6226Q0009_0001.docx | DOCX document | |
| Sol_140L6226Q0009_Amd_0001.pdf | ||
| A04_Attachment_1-_Performance_Work_Statement.pdf | ||
| A06_Attachments_4-_Wage_Determination.pdf | ||
| Sol_140L6226Q0009.pdf | ||
| A06_Attachment_3-_Bid_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page - 1
Quality Assurance Plan RSFO Recreation Sites
Evaluation Worksheet Inspector: _____________________________
Monthly Payment Analysis Date Inspected: ________________________
D = consecutive days (Monday – Friday)
W = Weekly … M = Monthly … 2W = Twice Weekly … 3W = 3 Times Weekly … S = Satisfactory … U = Unsatisfactory
White Mountain Petroglyphs Rec Site
Work Requirement
Standard of Performance
Frequency
% of Pay
Evaluation
D W M 2W 3W S U General C.5.c.i X Policing Grounds C.5.c.ii X Double Vault Toilets – 1 ea. C.5.c.iii X C.5.c.vii C.5.c.viii Recommend:
Killpecker Sand Dunes Rec Site
Evaluation
D W M 2W 3W S U General C.5.c.i X Policing Grounds C.5.c.ii X Double Vault Toilets – 2 ea. C.5.c.iii X Picnic Tables – 15 ea C.5.c.vii X Fire Rings – 9 ea. C.5.c.viii X
Page - 2
Notes during this inspection:
Three Patches Day Use Site
Evaluation
D W M 2W 3W S U General C.5.c.i X Policing Grounds C.5.c.ii X Single Vault Toilets – 2 ea. C.5.c.iii X Picnic Tables – 14 ea. C.5.c.vii X Fire Rings/Grills -13 ea. C.5.c.viii X