A06_Attachment_2_-_KATM_Boiler_CM-16_Submittal_Form_2pg.pdf

PDF 138 KB Posted

Attached to
KATMAI - REPLACE UP TO 6 BOILER SYSTEMS Federal contract opportunity
Solicitation number
140P9726Q0045
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document is a Transmittal form used by the National Park Service (NPS) for submitting and tracking construction or procurement items during contract performance. The form serves as a control mechanism for contractor submittals related to specifications, ensuring compliance with contract requirements under FAR 52.236-21.

The transmittal form captures essential project information including park name, project identification, contract number, package number, date, contractor name, and subcontractor/supplier details. The primary data section includes columns for item number, specification section number, paragraph reference, and detailed item description (size, type, name, manufacturer, use, etc.). The NPS ACTION section tracks submittal status through columns documenting number of copies submitted, number of copies returned, approval status, approval with notations, and disapproval status. The form requires contractor signature with title and date, along with a reviewing official's recommendation. A mandatory certification statement indicates that the submittal has been reviewed for accuracy, completeness, and compliance with contract requirements. The document includes a submittal log tracking dates from contractor submission through reviewer receipt, reviewer return, and final contractor receipt. Distribution options are provided for routing to the contractor, Design and Specification Center (DSC) file, Contracting Officer's Representative (COR), Architect/Engineer (A/E), and various interim files. A continuation sheet (CM-16 Continuation) is available for additional items requiring submission.

View the file

Other files for this federal contract opportunity

Other files attached to KATMAI - REPLACE UP TO 6 BOILER SYSTEMS, newest first.
File Type Posted
Sol_140P9726Q0045_Amd_0005.pdf PDF
Sol_140P9726Q0045_Amd_0004.pdf PDF
Sol_140P9726Q0045_Amd_0003.pdf PDF
Sol_140P9726Q0045_Amd_0002.pdf PDF
Sol_140P9726Q0045_Amd_0001.pdf PDF
A06_Attachment_1_-_KATM_Boiler_Site_Photos_Rev13_pg.pdf PDF
B03_Wage_Determination_2105-5687_Rev29_5_14_26_7pg.pdf PDF
Sol_140P9726Q0045.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature

Recommended by

Title, Date

Title

Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments

Action By

Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-

1(CS)

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16 Rev. 4/00 (Formerly DSC-1(CS)

File details come from the government source that posted it. Updated .