A06_Attachment_1_OLYM_Culvert_Specifications.pdf

PDF 94 KB Posted

Attached to
Supply and Delivery of Culvert Pipe OLYM
Solicitation number
140P8324Q0069
Issued by

About this file

This document is an attachment specifying the requirements for the supply and delivery of culvert pipes to Olympic National Park. The attachment outlines the minimum specifications for the culvert pipes, including the quantity, length, diameter, and material requirements. The pipes must meet various ASTM and AASHTO standards.

The delivery location is the Olympic National Park Maintenance Yard, and deliveries will be accepted on Mondays, Tuesdays, Wednesdays, or Thursdays between 7:30 AM and 3:30 PM PDT. The vendor will be responsible for unloading the trucks using a forklift that can operate on a gravel surface. The related federal contract opportunity is for the Supply and Delivery of Culvert Pipe to Olympic National Park, with a solicitation number of 140P8324Q0069.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1: Specifications Supply and Delivery of Culvert Pipe Olympic National Park

Attachment 1

Minimum Specifications

Quantity Unit Length (feet) Diameter (inches) Item 16 ea 30’ 18” N12 M-294 HDPE SOLID DUAL WALL

CULVERT

8 ea 30’ 24” N12 M-294 HDPE PE SOLID DUAL WALL

CULVERT

5 ea 30’ 48” N12 M-294 HDPE SOLID DUAL WALL

CULVERT

Additional Standards Requirements

Must meet the following standards listed by the American Society for Testing and Materials, and The American Association of State Highway and Transportation Officials:

ASTM F2306, ASTM D2321, ASTM F477, ASTM D3212, ASTM F2487, ASTM F2648/F2648M-07,

ASTM F1417, ASTM F2510, AASHTO M294, AASHTO LRFD Bridge Design Specification, AASHTO

SECTION 30, CSA B182.2.

Park POC

TBD

Delivery Olympic National Park Maintenance Yard (gravel parking lot) Olympic Hot Springs Road Port Angeles, WA 98363

Delivery date and time will need to be scheduled in advance with park point of contact, due to locked gate. Deliveries will be accepted on Monday, Tuesday, Wednesday, or Thursdays only, between the hours of 7:30AM and 3:30PM (PDT). Vendor will be responsible for the unloading of trucks at specified delivery location. The unloading surface is compact gravel and will require a forklift that can operate on a gravel surface.

File details come from the government source that posted it. Updated .