A06_ATTACHMENT_002_-_MACA_Parking___Monument_Sign_Renovations_CD_DWGS_2024-05-24_S_S.pdf
PDF 11 MB Posted
- Attached to
- MACA-REHAB ENTRANCE SIGNS/PARKING AREAS
- Solicitation number
- 140P5326R0006
About this file
This is a set of construction design drawings and technical specifications for the Mammoth Cave National Park Parking and Entry Sign Renovations project. The project encompasses three separate entrance locations: Cedar Sink Entrance, Chaumont Entrance, and Green River Ferry Entrance, with associated MACA contract numbers 323725/325833, 323722/325832, and 323654/325833 respectively. The work is prepared by Walker Architects (Gainesville, FL) as the A/E firm with HMB (Frankfort, KY) as the prime contractor.
The project includes monument sign renovations featuring precast concrete caps, reinforced concrete masonry unit (CMU) structural walls with local natural stone cladding, three-by-three-inch Corten steel tube cross bars, and 3/16-inch powder-coated aluminum sign panels with factory-applied graphics. Foundation design is based on a presumed allowable bearing pressure of 1,500 PSF per IBC Table 1806.2, with reinforcing steel conforming to ASTM A615 Grade 60 and cast-in-place concrete designed for 3,000 PSI compressive strength. Each site includes parking lot improvements with asphalt pavement, exposed aggregate concrete sidewalks, integral and post curbing, parking space striping at 30-degree angles, and associated drainage infrastructure including storm piping and inlet protection. Civil construction details specify concrete pavement at 4,000 PSI with medium broom finish, control joints spaced at maximum five-foot intervals, and ADA-compliant accessible curb ramps with maximum 1:12 slope. Environmental controls include silt fencing, inlet protection, erosion control matting on slopes greater than 4:1, and rip rap outlet protection. Design loads include ultimate wind speed of 105 MPH with internal pressure coefficient of 0.0 for sign structures per ASCE 7-10 standards. The drawings indicate conformance to the 2018 Kentucky Building Code (2015 IBC), ACI 318-14 concrete standards, AISC 360-10 structural steel specifications, and TMS 402-13 masonry construction requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5326R0006_Amd_0004.pdf | ||
| QUESTIONS_-_part_2_0004.docx | DOCX document | |
| Sol_140P5326R0006_Amd_0003.pdf | ||
| Sol_140P5326R0006_Amd_0002.pdf | ||
| QUESTIONS_0002.docx | DOCX document | |
| Sol_140P5326R0006_Amd_0001.pdf | ||
| ATTACHMENT_006_-_MACA_-_Price_Schedule_Sheet_0001.xlsx | XLSX spreadsheet | |
| A04_ATTACHMENT_001_-_STATEMENT_OF_WORK.pdf | ||
| B04_ATTACHMENT_005_-_Construction_Contract_Administration.docx | DOCX document | |
| B03_ATTACHMENT_003_-_Wage_Rate_Determination.pdf | ||
| B08_ATTACHMENT_004_-_Past_Performance_Questionnaire.pdf | ||
| Sol_140P5326R0006.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. GENERAL NOTES
2. AUTHORITIES HAVING JURISDICTION
BUILDING CODE AUTHORITY: NATIONAL PARK SERVICE
1. THE INTENDED USE OF THE STRUCTURE IS BASED ON INFORMATION FROM THE OWNER.
2. THE INTENDED USE OF THE STRUCTURE IS NOT OCCUPIABLE.
3. ALL DEMOLITION AND CONSTRUCTION INVOLVED TO COMPLETE THIS PROJECT SHALL CONFORM TO
ALL APPLICABLE CODES.
3. APPLICABLE CODES & STANDARDS
INTERNATIONAL BUILDING CODE (IBC) (2021)
1. PROJECT SUMMARY
THE PROPOSED PROJECT IS A NEW MONUMENT SIGN FOR THE NATIONAL PARK
SERVICE - MAMMOTH CAVE VISITOR PARKING AREAS.
4. CLASSIFICATION OF THE WORK
BUILDING CODE CLASSIFICATION OF THE WORK:
NEW CONSTRUCTION (IBC, SECTION 101.2)
BUILDING CODE REQUIREMENTS:
NEW CONSTRUCTION SHALL COMPLY WITH IBC
LIFE SAFETY CODE CLASSIFICATION OF THE WORK:
NOT APPLICABLE
LIFE SAFETY CODE REQUIREMENTS:
NOT APPLICABLE
6. STRUCTURAL REQUIREMENTS - IBC CHAPTER 16
1. REFER TO SHEET G001 FOR STRUCTURAL REQUIREMENTS.
INDEX OF DRAWINGS
TITLE OF PROJECT: DRAWING NO.
PMIS/PKG NO.
OF
SHEET
NAME OF PARK
MAMMOTH CAVE NATIONAL PARK
REGION COUNTY STATE
SE EDMONSON KENTUCKY
NATIONAL PARK SERVICE
UNITED STATES
DEPARTMENT OF THE INTERIOR
A/E FIRM:
PRIME:
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
QUALITY DESIGN CERTIFICATION
Prepared in Accordance with Design Development (Title I) ________________ OR Drawing No.
Variance from Design Development (Title I) Approved by Superintendent on ___________ OR Date Construction Drawing Not Preceded by Design Development (Title I)
Project Manager
Date
Mark Sheet Date InitialREVISION
/1
/2
:5 :4
P
M NPS - MAMMOTH CAVE PARKING
AND ENTRY SIGN RENOVATIONS
PROJECT PHASE
GENERAL
G000 COVER
G001 GENERAL NOTES, SYMBOL LEGEND AND ABBREVIATIONS
MACA 323725, 325833
MACA 323722, 325832
MACA 323654, 325833
NATIONAL PARK SERVICE
MAMMOTH CAVE NATIONAL PARK
PARKING AND ENTRY SIGN RENOVATIONS
CEDAR SINK
ENTRANCE
CHAUMONT
ENTRANCE
GREEN RIVER FERRY
ENTRANCE
MAMMOTH CAVE NATIONAL PARK,
EDMONSON, HART, AND BARREN COUNTIES, KY
EDMONSON
COUNTY
HART
COUNTY
BARREN
COUNTY
N.T.S.
ARCHITECTURAL
A101 MONUMENT SIGN PLANS AND ELEVATIONS
A102 MONUMENT SIGN SECTIONS
CIVIL
C001 CHAUMONT SITE
C002 CHAUMONT GRADING
C003 CHAUMONT EPSC
C004 CEDAR SINK SITE
C005 CEDAR SINK GRADING
C006 CEDAR SINK EPSC
C007 GREEN RIVER FERRY SITE
C008 GREEN RIVER FERRY GRADING
C009 GREEN RIVER FERRY EPSC
C010 CIVIL DETAILS
C011 CIVIL DETAILS
G000
01 15
WALL SECTION
DETAIL/ SECTION
NUMBER
SHEET NUMBER
BUILDING SECTION
EXTERIOR ELEVATION
SHEET NUMBER
ELEVATION NUMBER
INTERIOR ELEVATION
SHEET NUMBER
ELEVATION NUMBER
LARGE SCALE BLOWUP
OF PLAN OR DETAIL
PLAN OR DETAIL
NUMBER
SHEET NUMBER
LEVEL REFERENCE
LEVEL DESCRIPTION
LEVEL ELEVATION
NEW
STRUCTURAL GRID
GRID REFERENCE
GRID LINE
EXISTING
STRUCTURAL GRID
EXISTING GRID
REFERENCE
EXISTING GRID LINE
MATCH LINE 1 / A0103
1 / A0102
SHEET NUMBER
SHEET NUMBER
MATCH LINE
REVISION
CLOUDED AREA
OF REVISION
NORTH ARROW
SIMILAR INDICATION
DETAIL SECTION
DETAIL/ SECTION
NUMBER
SHEET NUMBER
A101
DETAIL NUMBER
SHEET NUMBER
N
Level 01
100' - 0"
A101
SIM
A101
A101
A101
A201
01 / A301
AC AIR CONDITIONING
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ARCH ARCHITECT, ARCHITECTURAL
AUTO AUTOMATIC
BLDG BUILDING
BRG BEARING
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CFCM COLD FORMED METAL FRAMING
CIP CAST-IN-PLACE (CONCRETE)
CJ CONTROL JOINT
CL CENTERLINE
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
DEMO DEMOLISH, DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DIM DIMENSION
DN DOWN
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC, ELECTRICAL
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EXP EXPANSION
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FT FOOT/FEET
FURN FURNISH, FURNISHED, FURNISHINGS
GA GAUGE, GAGE
GWB GYPSUM WALL BOARD
HSS HOLLOW STRUCTURAL SECTION
HVAC HEATING-VENTILATING-AIR CONDITIONING
ID INSIDE DIAMETER
INT INTERIOR
LAV LAVATORY
LWIC LIGHTWEIGHT INSULATING CONCRETE
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER, MANUFACTURED
MIN MINIMUM
MISC MISCELLANEOUS
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PCF POUNDS PER CUBIC FOOT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
R RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
REV REVISE (ISION)
RO ROUGH OPENING
RTU ROOF TOP UNIT
SF SQUARE FOOT, FEET
SIM SIMILAR
SPEC SPECIFY, SPECIFICATION
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STRUC STRUCTURE, STRUCTURAL
TBD TO BE DETERMINED
TEMP TEMPORARY
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
T&G TONGUE AND GROOVE
UC UNDERCOUNTER
UOI UNLESS OTHERWISE INDICATED
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
WD WOOD
WP WEATHERPROOF
1. DO NOT SCALE DRAWINGS. RELY ON THE NUMERIC DIMENSIONS SHOWN FOR
MEASUREMENT. IF DIMENSIONS ARE IN QUESTION, OBTAIN CLARIFICATION FROM THE
ARCHITECT
2. REVIEW AND FIELD VERIFY ALL DIMENSIONS AND CONDITIONS RELATING TO THE
EXISTING SITE WHICH INTERFACE WITH THE NEW CONSTRUCTION. NOTIFY THE
ARCHITECT WHEN EXISTING CONDITIONS VARY FROM THE PROJECT DRAWINGS.
3. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER
SMALLER SCALE DRAWINGS.
4. UNLESS INDICATED OTHERWISE, PLAN DIMENSIONS ARE TAKEN FROM CENTERLINE OF
STEEL STRUCTURE, FACE OF CONCRETE OR CMU.
5. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE PRODUCT MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS AND STANDARD DETAILS, IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATION REQUIREMENTS AND DESIGN
INTENT.
6. PRIME AND PAINT ALL PIPES, CONDUITS, AND OTHER UTILITIES EXPOSED TO VIEW
UNLESS INDICATED OTHERWISE, OR PROHIBITED BY MANUFACTURER.
PRIMARY CODES AND SPECIFICATIONS:
1. GENERAL BUILDING CODE:
A. 2018 KENTUCKY BUILDING CODE (2015 IBC)
2. DESIGN LOADS:
A. ASCE 7-10 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES.
3. CONCRETE CODES:
A. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE.
B. ACI 301 SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS.
C. CRSI MANUAL OF STANDARD PRACTICE.
4. PRECAST AND PRECAST-PRESTRESSED REQUIREMENTS:
A. PCI MNL 120 PCI DESIGN HANDBOOK.
B. PCI MNL 116 MANUAL FOR QUALITY CONTROL FOR PLANTS AND PRODUCTION OF PRECAST
PRESTRESSED CONCRETE PRODUCTS.
C. PCI MNL 122 ARCHITECTURAL PRECAST CONCRETE.
D. PCI MNL 117 MANUAL FOR QUALITY CONTROL FOR PLANTS AND PRODUCTION OF
ARCHITECTURAL PRECAST CONCRETE PRODUCTS.
5. MASONRY CONSTRUCTION:
A. TMS 402-13 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES.
B. TMS 602-13 SPECIFICATIONS FOR MASONRY STRUCTURES.
6. STRUCTURAL STEEL CODES:
A. AISC 360-10 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.
B. AISC 303-10 CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
FOUNDATIONS:
1. FOUNDATION DESIGN IS BASED ON A PRESUMED ALLOWABLE BEARING PRESSURE OR 1500 PSF
PER IBC TABLE 1806.2. THE BUILDING OWNER HAS NOT ELECTED TO PROVIDE A PROJECT
GEOTECHNOCAL REPORT.
2. ALL VEGETATION, TOPSOILS, ROOTS AND ORGANIC ZONES SHALL BE STRIPPED AND REMOVED
FROM THE CONSTRUCTION AREA FOR A DISTANCE OF AT LEAST 5 FEET BEYOND THE
FOUNDATION LIMITS. THE DEPTH OF STRIPPING SHALL BE THAT REQUIRED TO REMOVE
SIGNIFICANT ROOT ZONES, SMALL TREE STUMPS AND OTHER UNACCEPTABLE MATERIALS, BUT
IN NO CASE LESS THAN 6 INCHES.
3. THE EXPOSED SOILS AT THE STRIPPED SURFACE SHALL BE COMPACTED TO AT LEAST 95
PERCENT OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D-1557).
REINFORCING STEEL:
1. REINFORCING STEEL: ASTM A615, GRADE 60.
2. MINIMUM REINFORCING STEEL CLEAR COVER (U.N.O.):
A. CONCRETE CAST DIRECTLY AGAINST EARTH ...................... 3"
B. FOUNDATION AND EXTERIOR WALLS......................................2"
C. EXTERIOR SLABS ....................................................................... 1-1/2"
CAST-IN-PLACE CONCRETE:
1. ALL CONCRETE SHALL BE NORMAL WEIGHT (145 PCF), WITH MIXES DESIGNED TO MEET THE
FOLLOWING CRITERIA FOR USE IN VARIOUS ELEMENTS OF THE STRUCTURE AS FOLLOWS:
28-DAY
COMPRESSIVE MAX. SLUMP
STRENGTH MAX. SIZE W/C RANGE
STRUCTURAL ELEMENT (PSI) AGGREGATE RATIO (IN)
A. FOOTINGS & FOUNDATION WALLS 3000 1" 0.55 3-6
CONCRETE MASONRY:
1. CONCRETE MASONRY UNITS SHALL BE LOAD BEARING TYPE CONFORMING TO ASTM C-90 HAVING
A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI (NET AREA).
2. MORTAR SHALL CONFORM TO ASTM C-270 TYPE S.
3. FILL CELLS AS NOTED ON DRAWINGS WITH 3000 PSI GROUT, OR GROUT CONFORMING TO ASTM
C-476, SPECIFICALLY DESIGNED FOR FILLING OF CELLS.
DESIGN LOADS:
1. WIND LOADS:
A. ULTIMATE DESIGN WIND SPEED, 3 SECOND GUST, Vult..... 105 MPH
NOMINAL DESIGN WIND SPEED, 3 SECOND GUST, Vasd.... 82 MPH
HURRICANE PRONE REGION................................................... NO
WINDBORNE DEBRIS REGION................................................. NO
BUILDING RISK CATEGORY..................................................... I
WIND EXPOSURE CATEGORY................................................. C
WIND TOPOGRAPHIC FACTOR (Kzt)....................................... 1.0
ENCLOSURE CATEGORY......................................................... SIGN
INTERNAL PRESSURE COEFFICIENT..................................... 0.0
MEAN ROOF HEIGHT................................................................. 12 FEET WIND DIRECTIONALITY FACTOR, Kd....................................... 0.85 VELOCITY PRESSURE COEFFICIENT (Kh).............................. 0.85 ULTIMATE VELOCITY PRESSURE (qh[ult])............................... 24.5 PSF
STRUCTURAL STEEL:
1. MATERIALS:
ANGLES & PLATES................................................... ASTM A36
HSS SHAPES............................ASTM A1085, GRADE A OR ASTM A500, GRADE C
ANCHOR RODS...................... ASTM F1554, GRADE 55 TYPE S1(UNO)
WELDING ELECTRODES.......................................... AWS D1.1, E70 SERIES
2. NON-SHRINK, NON-METALLIC GROUT WITH A MINIMUM 28 DAY STRENGTH OF 5000 PSI SHALL BE
USED UNDER BASE PLATES AND SHALL CONFORM TO CORPS OF ENGINEERS CRD-C621,
FACTORY PREMIX GROUT.
STRUCTURE MAINTENANCE:
1. THE SIGN OWNER SHALL BE AWARE THAT ALL BUILDINGS AND STRUCTURES REQUIRE
ROUTINE AND PERIODIC MAINTENANCE. THIS MAINTENANCE IS ESPECIALLY IMPORTANT FOR
ALL ELEMENTS EXPOSED TO THE ATMOSPHERE, SALT ENVIRONMENTS OR HARSH CHEMICALS.
THE OWNER SHALL ESTABLISH A MAINTENANCE PROGRAM IN ORDER TO PREVENT DAMAGE TO
THE STRUCTURE WHICH WILL SHORTEN THE LIFESPAN. ROUTINE MAINTENANCE ITEMS WOULD
INCLUDE CLEANING, PAINTING, PRESSURE WASHING, SEALANT REPLACEMENT AND REPAIR OF
ANY CRACKED OR SPALLED CONCRETE.
REFERENCE SYMBOLS (ALL DISCIPLINES) ABBREVIATIONS
DRAWN BY:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
/2
/2
:5
:5
P
M
JMO
JMO
05/24/2024
G001KL
GENERAL NOTES, SYMBOL
LEGEND AND ABBREVIATIONS
NPS - MAMMOTH CAVE PARKING
AND ENTRY SIGN RENOVATIONS
GENERAL NOTESGENERAL STRUCTURAL NOTES
G001
02 15
A101
A101
A102
A102
A102
CONCRETE
FOOTING BELOW
GRADE
STONE VENEER,
THINSET ON
SIDES, BATTERED
AT EACH END
REINFORCED 12"
WIDE CMU
A101
A101
A102
A102
A102
STONE MASONRY
ANCHORED TO CMU
STRUCTURAL WALL
CORTEN STEEL
TUBE CROSS BAR
FLEXIBLE JOINT
SEALANT ON BACKER
ROD AROUND CROSS
BAR PENETRATIONS,
TYP.
2'-8" 2'-10" 2'-8"
REINFORCED
12"X8"X16" CMU
STRUCTURAL WALL
PRECAST CONC. CAP
TYPE - A
PRECAST CONC. CAP
TYPE - B
FINISHED GRADE
0"
LOCAL NATURAL STONE CLADDING
OVER REINFORCED CMU
PRECAST CONCRETE CAP TYPE - A
3X3 CORTEN TUBE STEEL
CROSS BARS
3/16" THICK POWDER COATED ALUM. SHEET W/
FACTORY APPLIED GRAPHICS. ATTACH SIGN TO
CROSS BARS USING SS SELF-TAPPING
FASTENERS AT 12" O.C. MAX, EQUALLY SPACED,
STARTING 1-1/2" FROM CORNERS, CENTERED IN
CROSS BAR, ALIGNED STRAIGHT. PROVIDE SS
WASHERS AS SPACERS BETWEEN STEEL TUBES
AND ALUMINUM PANEL
7'-0"
A102
A102
5" 1'-11" 3"3" 3" 1'-11" 5"
PRECAST CONCRETE CAP TYPE - C
PRECAST CONCRETE CAP TYPE - B
FINISHED GRADE
0"
A102
/2
/2
4" 4"
8"
8"X8" SQUARE PRECAST
CONC. CAMERA POST W/
CHAMFERED CORNERS
CONCRETE FOOTING
8" 8" 8"
2'-0"
EXISTING GRADE
COMPACTED STRUCTURAL
GRADE FILL
/2
/2
/2
1/2" 7"
1/2"
8"
A
PROVIDE RIBBED SURFACE FOR
STANDING DEVICES ON END
A
PLAN VIEW
INTERNAL
REINFORCING PER
PRECAST MANUF.
DRAWN BY:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
/1
/2
:3
:1
P
M
JMO
JMO
05/24/2024
A101KL
MONUMENT SIGN PLANS AND
ELEVATIONS
NPS - MAMMOTH CAVE PARKING
AND ENTRY SIGN RENOVATIONS
3/8" = 1'-0"
BASE PLAN
3/8" = 1'-0"
SIGN PLAN
3/8" = 1'-0"
FRONT / BACK ELEVATION
3/8" = 1'-0"
SIDE ELEVATION
1" = 1'-0"
PRECAST CAMERA POST - SEE CIVIL FOR LOCATIONS
03 15
FINISHED GRADE
0"
A102
PRECAST CONCRETE CAP
TYPE - C
(2) #4 CONT. IN LOW WEB
BOND BEAM
PRECAST CONCRETE CAP
BEYOND
NATURAL STONE VENEER
THINSET ON CMU
12"X8"X16" REINFORCED
CMU - GROUT ALL CELLS
SOLID
1'-8"
3'-0"
FINISHED GRADE
0"
A102
(2) #4 CONT. IN LOW WEB
BOND BEAM
PRECAST CONCRETE CAP
W/ INTERNAL REINFORCING
PER MANUF.
NATURAL STONE VENEER
THINSET ON CMU
REINFORCED CONC.
FOOTING W/ (3) #5 BARS
CONT. AND #5 BARS
PERPENDICULAR AT 24" O.C.
(2) #5 BARS VERTICAL AT
48" O.C. MAX
12"X8"X16" REINFORCED
CMU - GROUT ALL CELLS
SOLID
3'-0"
3X3 CORTEN TUBE STEEL
CROSS BARS
3/16" THICK POWDER
COATED ALUM. SIGN PANEL,
FASTENED TO CROSS BARS
USING SS SELF-TAPPING
FASTENERS AT 12" O.C.
MAX, EQUALLY SPACED,
STARTING 1-1/2" FROM
CORNERS, CENTERED IN
CROSS BAR, ALIGNED
STRAIGHT
FINISHED GRADE
0"
A102
A102
PRECAST CONCRETE
CAPS - REINFORCING
AND ATTACHMENT
PER PRECAST
MANUFACTURER
9 3/8" 9 3/8"
EQ
3 5/8"
8" 2'-8" 3'-4" 2'-8" 8"
3 5/8"
EQ
1'-3 5/8" 8'-0" 1'-3 5/8"
/2
/2
SLOPE GRADE
AWAY ON ALL SIDES
BATTERED NATURAL STONE
VENEER. PROVIDE MASONRY WALL
TIES AT 8" O.C. HORIZ. AND VERT.,
STAGGERED, TYP. AT EACH END
PRECAST CONCRETE
CAPS - REINFORCING
AND ATTACHMENT
PER PRECAST
MANUFACTURER
3"X3"X3/16" STEEL TUBE
CROSS BARS WELDED TO
3"X9"X3/16" PLATE. FASTEN
TO CMU USING (4) 1/2"
STAINLESS STEEL EPOXY
ANCHORS. SHIM USING
STAINLESS STEEL
WASHERS AS NEEDED, TYP.
(2) #4 CONT. IN LOW
WEB BOND BEAM
REINFORCED CONC.
FOOTING W/ (4) #5
BARS CONT. AND #5
BARS PERPENDICULAR
AT 24" O.C. MAX
(4) #5 BARS
VERTICAL AT EACH
PIER
ABA
CC
14'-7"
C
PLAN VIEW
2'-2"
2'-2"
SIDE VIEW
TYPE -B
PLAN VIEW
2'-9 1/4"
/2
SIDE VIEW
TYPE -
2'-9 1/4"
/2
1" 1'-8" 1"
" 1
/2
/2
A
PLAN VIEW
2'-7"
/2
SIDE VIEW
TYPE -
2'-7"
/2
1" 4" 1'-0" 4" 1"
" 1
/2
/2
END VIEW
1"
END VIEW
E Q
E Q
E Q
E Q
DRAWN BY:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO: TITLE OF SHEET: DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
/1
/2
:3
:0
P
M
JMO
JMO
05/24/2024
A102KL
MONUMENT SIGN SECTIONS
NPS - MAMMOTH CAVE PARKING
AND ENTRY SIGN RENOVATIONS
3/4" = 1'-0"
SECTION 1
3/4" = 1'-0"
SECTION 2
3/4" = 1'-0"
SECTION 3
1 1/2" = 1'-0"
PRECAST SHAPE DETAILS
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
EXISTING SIGN TO BE RELOCATED TO A
LOCATION SPECIFIED BY OWNER
EDGE KEY INTO
EXISTING (TYP)
EDGE KEY INTO
EXISTING (TYP)
STABILIZE EXISTING
ELECTRICAL POLE
EXISTING ELECTRICAL
OVERHEAD POWER LINE
EXISTING TREE LINE
PROPOSED 5' WIDE EXPOSED
AGGREGATE SIDEWALK,
SEE DETAIL SHEET
PROPOSED 5' WIDE EXPOSED
AGGREGATE SIDEWALK,
SEE DETAIL SHEET
PROPOSED 5' WIDE EXPOSED
AGGREGATE SIDEWALK,
SEE DETAIL SHEET
PROPOSED PARK SIGN,
SEE ARCHITECTURAL
PLANS
ASPHALT PARKING LOT,
PER DETAIL SHEET
R25.0'
R25.0'
R25.0'
R10.0'
R25.0'
20.0'
10.0'
235.6'
34.0'
20.0'
5.0'
R7.0'
EXISTING MAMMOTH CAVE RD (RT 70/255)
NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE
PROJECT LIMITS FOR ANY SITE DEMOLITION AND SHALL BE
RESPONSIBLE FOR MAINTAINING ANY AND ALL WORK WITHIN THE
LIMITS OF THE WORK AS DESIGNATED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY ENCROACHMENT BEYOND THE LIMITS AND
SHALL BE RESPONSIBLE FOR OBTAINING ANY PERMITS, PERMISSIONS,
EASEMENTS, ETC TO UTILIZE AREAS BEYOND THE PROJECT LIMITS.
2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND OR OVERHEAD
UTILITIES PRIOR TO DEMOLITION WORK EITHER BY UTILIZATION OF
B.U.D. OR A 3RD PARTY UTILITY LOCATE COMPANY. COSTS FOR
ESTABLISHING THE LOCATION OF EXISTING UTILITIES SHALL BE THE
COST OF THE CONTRACTOR.
3. THE CONTRACTOR SHALL ESTABLISH TRAFFIC CONTROL AND SIGNING
AS REQUIRED BY THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES, PROVIDE TEMPORARY BARRICADES, TRAFFIC BARRELS,
FLAGGERS AS NECESSARY FOR CREW AND MOTORIST SAFETY AND PER
THE MAINTENANCE OF TRAFFIC/TEMPORARY TRAFFIC CONTROL PLAN
INCLUDED IF INCLUDED IN THE CONTRACT DOCUMENTS. CONTRACTOR
IS RESPONSIBLE FOR COORDINATING ANY STREET CLOSURES,
DETOURS, ETC. WITH AUTHORITIES HAVING JURISDICTION AND
GOVERNING AGENCIES OF STREETS AND ROADS.
4. DURING CONSTRUCTION, THE WORK AREA SHALL BE KEPT CLEAR OF
DEBRIS. ALL DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE
SITE AND DISPOSED OF IN A LAWFUL MANNER. CONTRACTOR SHALL
PAY ALL HAULING AND LANDFILL EXPENSES AND OBTAIN ANY
NECESSARY PERMITS TO DO SO.
5. CONTRACTOR TO PROTECT EXISTING TREES OUTSIDE OF
CONSERVATION LIMITS. NO MATERIAL IS TO BE STORED WITHIN A
TREE DRIP LINE.
6. PROVIDE TREE PROTECTION FENCING FOR ALL EXISTING TREES THAT
ARE NOT DESIGNATED TO BE REMOVED WITHIN THE CONSTRUCTION
LIMITS.
7. SAWCUT EDGES OF PAVEMENT TO REMAIN IN CLEAN STRAIGHT LINES.
COORDINATE SAWCUTS WITH PROPOSED LAYOUT PLAN.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ANY
OVERHEAD UTILITY LINES THAT MAY CONFLICT WITH ANY ASPECT OF
THE SITE DEMOLITION AND SHALL BE RESPONSIBLE FOR SAFE
OPERATION OF EQUIPMENT AND PERSONNEL THAT MAY CONFLICT
WITH ANY OVERHEAD UTILITY SERVICES.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH
LOCAL NOISE ORDINANCES THAT MAY RESTRICT THE TYPE OF
EQUIPMENT OR TIMES OF WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXTENT, IF ANY, OF LOCAL
NOISE ORDINANCES ASSOCIATED WITH CONSTRUCTION OR
DEMOLITION ACTIVITIES.
10. DIMENSIONS ARE NOT TO BE SCALED. SHOULD DISCREPANCIES OCCUR
WITH DIMENSIONS ON THESE PLANS, NOTIFY ENGINEER FOR
CLARIFICATION.
11. PRIOR TO CONSTRUCTION OR DEMOLITION, THE CONTRACTOR SHALL
VERIFY THE LOCATION OF ALL UTILITIES SO THAT NEW
CONSTRUCTION WILL NOT DAMAGE OR INTERFERE WITH EXISTING
UTILITY LINES. SHOULD DAMAGE OCCUR, IT IS THE CONTRACTOR'S
RESPONSIBILITY TO REPAIR AND/OR REPLACE SAID DAMAGE AT THE
CONTRACTOR'S EXPENSE..
12. ALL PAVEMENT MARKING LINES SHALL BE 4" PAINTED AND MEASURED
CENTER TO CENTER U.N.O.
13. ALL WORK, CONSTRUCTION REQUIREMENTS, AND PERFORMANCE
STANDARDS SHALL COMPLY WITH LOCAL AND STATE STANDARDS.
14. EXISTING BUILDINGS, PAVEMENTS, SIDEWALKS, AND OTHER SITE
IMPROVEMENTS SHALL BE PROTECTED DURING CONSTRUCTION. THEIR
CONDITIONS SHALL BE PHOTOGRAPHICALLY DOCUMENTED PRIOR TO
CONSTRUCTION. DAMAGE SHALL BE REPAIRED AT CONTRACTOR'S
EXPENSE.
15. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL OSHA
JOBSITE REQUIREMENTS.
16. ALL PAVED AREAS INCLUDING SIDEWALKS, PARKING AREAS, SERVICE
AREAS, ETC. ARE SPECIFIED WITH MATERIALS FOR THE INTENDED
FINAL USE OF EACH AREA. THE AREAS ARE NOT SPECIFIED TO BE USED
FOR TEMPORARY CONSTRUCTION TRAFFIC. SHOULD THE CONTRACTOR
INSTALL OR CONSTRUCT THE PAVED AREA AS SPECIFIED AND THE USE
FOR TEMPORARY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL
(AT NO COST TO THE OWNER) REPAIR AND/OR RECONSTRUCT THE
AREAS WITH REGARDS TO MEETING MATERIAL SPECIFICATIONS,
SUBSEQUENT STABILIZATION, AND GRADING PRIOR TO CONSTRUCTION
OF FINAL PAVEMENT SURFACES.
17. ALL IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY SHALL
COMPLY WITH MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND
SHALL COMPLY WITH LOCAL, STATE, AND FEDERAL PUBLIC RIGHT OF
WAY ACCESSIBILITY GUIDELINE STANDARDS AND REGULATIONS.
CONTRACTOR SHALL SCHEDULE ANY REQUIRED INSPECTIONS WITH
LOCAL/STATE INSPECTORS.
TOTAL AREA TO BE PAVED
PARKING LOT = 5,700 SF
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C001
BGB
CHAUMONT SITE
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
FLUSH CURB (TYP),
SEE DETAIL SHEET INTEGRAL CURB (TYP),
SEE DETAIL SHEET
2' CURB
TAPER
30° ANGLED
PARKING (TYP)
PROPOSED CAMERA POST,
SEE ARCHITECTURAL PLANS
R7.0'
R25.0'
2' CURB
TAPER
ACCESSIBLE CURB RAMP,
SEE DETAIL SHEET
ACCESSIBLE CURB RAMP,
SEE DETAIL SHEET
INTEGRAL CURB (TYP),
SEE DETAIL SHEET
INTEGRAL CURB (TYP),
SEE DETAIL SHEET
POST CURB (TYP), SEE
DETAIL SHEET
15.4'
15.8'
13.8'
R4.0'
4.5'
R28.0' 5.5'
R1.0'R5.0'
R7.0'
R2.0'R2.0'
R2.0'
R2.0'
6.1'
53.6'
69.3'
WHEEL STOP (TYP),
SEE DETAIL SHEET
EXISTING ELECTRICAL
OVERHEAD POWER LINE
5.5'
R25.0'
4.1'
4.1' R1.0'
C001
05 15
852 853
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
853852851
854.00 855.00 856.00 857.00 858.00 859.00 860.00
861.00 862.00
853.00
854.00 855.00
856.00 857.00
858.00 859.00
860.00 861.00
3.0
4.0
5.0
6.0
7.0
8.0
850.00
851.00
853.00 852.00
852.00
853.00 T/C = 853.65
B/C = 853.15
853.25
T/C = 853.00 B/C = 852.50
T/C = 853.50 B/C = 853.00
853.55
T/C = 853.25 B/C = 852.75
853.30
853.05
T/C = 852.75 B/C = 852.25
T/C = 852.75 B/C = 852.25
852.25852.25 852.80
852.65
852.30
851.45
851.50
T/C = 852.60 B/C = 852.10
T/C = 852.25 B/C = 851.75851.40
853.20852.00 852.70
852.75852.35
T/C = 852.85 B/C = 852.35
852.85
852.90
852.80
852.95
852.95
852.90
852.90
852.80 852.50
852.60
T/C = 853.10 B/C = 852.60
851.75
853.25
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
R7.0'
EXISTING MAMMOTH CAVE RD (RT 70/255)
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C002
BGB
CHAUMONT GRADING
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
PROPOSED ENDWALL,
SEE DETAIL SHEET
O.E. = 849.55
PROPOSED 15" TRAFFIC RATED
NYLOPLAST DRAIN BASIN
WITH LOCKING DI GRATE
RIM = 852.70
I.E. = 850.24
72 LF OF 15" ADS HP STORM PIPE
@ 0.5% SLOPE
PROPOSED HEADWALL,
SEE DETAIL SHEET
I.E. = 850.60
PROPOSED 15" TRAFFIC RATED
NYLOPLAST DRAIN BASIN
WITH LOCKING DI GRATE
RIM = 852.00
I.E. = 849.81
86 LF OF 15" ADS HP STORM PIPE
@ 0.5% SLOPE
2.5:1 SLOPE
2.5:1 SLOPE
2.
5:
SL
O
PE
NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE PROJECT LIMITS
FOR ANY SITE DEMOLITION AND SHALL BE RESPONSIBLE FOR MAINTAINING ANY AND
ALL WORK WITHIN THE LIMITS OF THE WORK AS DESIGNATED. THE CONTRACTOR
WILL BE RESPONSIBLE FOR ANY ENCROACHMENT BEYOND THE LIMITS AND SHALL BE
RESPONSIBLE FOR OBTAINING ANY PERMITS, PERMISSIONS, EASEMENTS, ETC TO
UTILIZE AREAS BEYOND THE PROJECT LIMITS.
2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND OR OVERHEAD UTILITIES PRIOR TO
DEMOLITION WORK EITHER BY UTILIZATION OF B.U.D. OR A 3RD PARTY UTILITY
LOCATE COMPANY. COSTS FOR ESTABLISHING THE LOCATION OF EXISTING UTILITIES
SHALL BE THE COST OF THE CONTRACTOR.
3. THE CONTRACTOR SHALL ESTABLISH TRAFFIC CONTROL AND SIGNING AS REQUIRED
BY THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, PROVIDE TEMPORARY
BARRICADES, TRAFFIC BARRELS, FLAGGERS AS NECESSARY FOR CREW AND
MOTORIST SAFETY AND PER THE MAINTENANCE OF TRAFFIC/TEMPORARY TRAFFIC
CONTROL PLAN INCLUDED IF INCLUDED IN THE CONTRACT DOCUMENTS.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY STREET CLOSURES,
DETOURS, ETC. WITH AUTHORITIES HAVING JURISDICTION AND GOVERNING
AGENCIES OF STREETS AND ROADS.
4. DURING CONSTRUCTION, THE WORK AREA SHALL BE KEPT CLEAR OF DEBRIS. ALL
DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
LAWFUL MANNER. CONTRACTOR SHALL PAY ALL HAULING AND LANDFILL EXPENSES
AND OBTAIN ANY NECESSARY PERMITS TO DO SO.
5. CONTRACTOR TO PROTECT EXISTING TREES OUTSIDE OF CONSERVATION LIMITS. NO
MATERIAL IS TO BE STORED WITHIN A TREE DRIP LINE.
6. PROVIDE TREE PROTECTION FENCING FOR ALL EXISTING TREES THAT ARE NOT
DESIGNATED TO BE REMOVED WITHIN THE CONSTRUCTION LIMITS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ANY OVERHEAD
UTILITY LINES THAT MAY CONFLICT WITH ANY ASPECT OF THE SITE DEMOLITION
AND SHALL BE RESPONSIBLE FOR SAFE OPERATION OF EQUIPMENT AND PERSONNEL
THAT MAY CONFLICT WITH ANY OVERHEAD UTILITY SERVICES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH LOCAL NOISE
ORDINANCES THAT MAY RESTRICT THE TYPE OF EQUIPMENT OR TIMES OF WORK. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXTENT, IF ANY, OF
LOCAL NOISE ORDINANCES ASSOCIATED WITH CONSTRUCTION OR DEMOLITION
ACTIVITIES.
9. PRIOR TO CONSTRUCTION OR DEMOLITION, THE CONTRACTOR SHALL VERIFY THE
LOCATION OF ALL UTILITIES SO THAT NEW CONSTRUCTION WILL NOT DAMAGE OR
INTERFERE WITH EXISTING UTILITY LINES. SHOULD DAMAGE OCCUR, IT IS THE
CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE SAID DAMAGE AT THE
CONTRACTOR'S EXPENSE..
10. ALL WORK, CONSTRUCTION REQUIREMENTS, AND PERFORMANCE STANDARDS SHALL
COMPLY WITH LOCAL AND STATE STANDARDS.
11. ALL PAVED AREAS INCLUDING SIDEWALKS, PARKING AREAS, SERVICE AREAS, ETC.
ARE SPECIFIED WITH MATERIALS FOR THE INTENDED FINAL USE OF EACH AREA. THE
AREAS ARE NOT SPECIFIED TO BE USED FOR TEMPORARY CONSTRUCTION TRAFFIC.
SHOULD THE CONTRACTOR INSTALL OR CONSTRUCT THE PAVED AREA AS SPECIFIED
AND THE USE FOR TEMPORARY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL
(AT NO COST TO THE OWNER) REPAIR AND/OR RECONSTRUCT THE AREAS WITH
REGARDS TO MEETING MATERIAL SPECIFICATIONS, SUBSEQUENT STABILIZATION,
AND GRADING PRIOR TO CONSTRUCTION OF FINAL PAVEMENT SURFACES.
12. ALL IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY SHALL COMPLY WITH
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND SHALL COMPLY WITH LOCAL,
STATE, AND FEDERAL PUBLIC RIGHT OF WAY ACCESSIBILITY GUIDELINE STANDARDS
AND REGULATIONS. CONTRACTOR SHALL SCHEDULE ANY REQUIRED INSPECTIONS
WITH LOCAL/STATE INSPECTORS.
13. SPOT ELEVATIONS DESIGNATE FINISHED SURFACE ELEVATION.
14. ANY MATERIAL RESULTED FROM A NET CUT OF THE SITE IS TO BE REMOVED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
15. TOPSOIL SHALL BE STRIPPED, STOCKPILED, AND REDRESSED FOR THE ENTIRETY OF
THE DISTURBED AREA SHOWN.
16. ALL ROCK ENCOUNTERED SHALL BE UNDERCUT MINIMUM 12" BELOW SUBGRADE OR
AS SPECIFIED IN THE GEOTECHNICAL REPORT U.N.O. ALL EXCAVATION IS
UNCLASSIFIED.
17. ALL GRADING SHALL RESULT IN WATER BEING DIRECTED AWAY FROM STRUCTURES,
NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
18. CONTRACTOR MUST COMPLY WITH ALL ADA REQUIREMENTS AND SPECIFICATIONS
INCLUDING MAX 2% CROSS SLOPE FOR ADA ROUTES AND MAX 2% SLOPE ON LANDING
AND RAMPS. CONTRACTOR MUST VERIFY ADA COMPLIANT GRADES PRIOR TO PAVING
AND NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
19. ANY FILL MATERIAL MUST BE VERIFIED BY A LICENSED GEOTECHNICAL ENGINEER AS
SUITABLE STRUCTURAL FILL MATERIAL.
20. RIM ELEVATIONS OF ALL STRUCTURES SHALL BE FLUSH WITH SURROUNDING GRADE
U.N.O.
21. TOPSOIL SHALL BE MINIMUM 4" DEEP IN GRASS AREAS AND 12" DEEP IN LANDSCAPED
AREAS.
22. FINISH GRADING MUST BE INSPECTED AND APPROVED BY ENGINEER AND MUST BE
FREE OF OBSTACLES, DEPRESSIONS, OR OTHER INCONSISTENCIES. ANY REGRADING
EFFORTS MUST BE COMPLETED AT CONTRACTOR'S EXPENSE.
23. REFER TO ARCHITECTURAL PLANS FOR ALL TIE-INS WITH BUILDING UTILITIES AND
RAIN WATER LEADERS. NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
24. STORM PIPING STONE BACKFILL TO BE COMPLETED PER MANUFACTURER'S
SPECIFICATION, BUT MUST NOT BE LESS THAN 12" OVER PIPING IN TURF AREAS AND
FULL DEPTH UNDER PAVEMENT.
25. CONTRACTOR SHALL COMPLETE ANY DEWATERING ACTIVITIES AT THE
CONTRACTOR'S EXPENSE. DEWATERING MUST BE PERFORMED IN THE PRESENCE OF
GROUNDWATER INTRUSION.
26. ANY SUMPS IN STORMWATER STRUCTURES SHALL BE FILLED WITH CONCRETE TO
INVERT ELEVATION SPECIFIED.
PROPOSED 15" TRAFFIC RATED
NYLOPLAST DRAIN BASIN
WITH LOCKING DI GRATE
RIM = 851.40
I.E. = 849.59
44 LF OF 15" ADS HP STORM PIPE
@ 0.5% SLOPE
10 LF OF 15" ADS HP STORM PIPE
@ 0.5% SLOPE
C002
06 15
852 853
853852851
S
F
S
F
S
F
S
F
S F
SF SF SF SF SF SF
S
F
S
F
S
F
SF SF SF SF
S
F
S
F
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
R7.0'
EXISTING MAMMOTH CAVE RD (RT 70/255)
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C003
BGB
CHAUMONT EPSC
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
RIP RAP OUTLET PROTECTION,
SEE DETAIL SHEET
RIP RAP SPLASH BLOCK,
SEE DETAIL SHEET
RIP RAP INLET PROTECTION,
SEE DETAIL SHEET
BIODEGRADABLE EROSION CONTROL
MATTING ON ALL SLOPES GREATER THAN 4:1,
SEE DETAIL SHEET
BIODEGRADABLE EROSION CONTROL
MATTING ON ALL SLOPES GREATER THAN 4:1,
SEE DETAIL SHEET
BIODEGRADABLE EROSION CONTROL
MATTING ON ALL SLOPES GREATER THAN 4:1,
SEE DETAIL SHEET
SILT FENCE, SEE DETAIL SHEET
SILT FENCE, SEE DETAIL SHEET
SILT FENCE, SEE DETAIL SHEET
SILT FENCE J-HOOK,
SEE DETAIL SHEET
SILT FENCE J-HOOK,
SEE DETAIL SHEET
INLET PROTECTION,
SEE DETAIL SHEET
INLET PROTECTION,
SEE DETAIL SHEET
NOTES:
1. NO VEGETATION OR CONSTRUCTION DEBRIS SHALL BE BURIED ON SITE
AND NO BURNING PITS SHALL BE PLACED IN FUTURE RIGHT - OF - WAY
OR LIKELY BUILDING LOCATIONS OR SANITARY SEWER EASEMENTS.
2. ALL DISTURBED AREAS THAT REMAIN INACTIVE FOR MORE THAN 21
DAYS SHALL BE STABILIZES BY SEEDING, SODDING MULCHING,
COVERING, OR BY OTHER EQUIVALENT EROSION CONTROL MEASURES
AS SOON AS PRACTICABLE, BUT IN NO CASES MORE THAN 14 DAYS
AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS
TEMPORARILY OR PERMANENTLY CEASED.
3. WHEN CONDITIONS PROHIBIT THE APPLICATION OF TEMPORARY, OR
PERMANENT SEEDING, NON-VEGETATIVE SOIL STABILIZATION
PRACTICES SUCH AS MULCHING AND MATTING SHALL BE USED, UNTIL
SUCH TIME AS CONDITIONS PERMIT.
4. INSTALL SLIT FENCES FOR CURB INLET PROTECTION AS INDICATED ON
SITE PLAN PRIOR TO ANY OTHER DISTURBANCES.
5. SLIT FENCE SHALL BE CLEANED/REPAIRED WHEN SLIT BUILDUP
REACHES 1/3 SLIT FENCE HEIGHT.
6. PERFORM ROUGH GRADING OPERATION AS INDICATED ON
CONSTRUCTION DRAWINGS.
7. REDISTRIBUTE TOPSOIL AND SOW GRASS SEED IMMEDIATELY AFTER
SPREADING TOPSOIL.
8. MAINTAIN ALL EROSION CONTROL DEVICES IN FULLY FUNCTIONAL
CONDITION UNTIL 90% OF THE CONTRIBUTING WATERSHED IS BUILT
OUT AND/OR VEGETATIVE IS ACHIEVED. AT SUCH TIME THAT ALL SLIT
FENCE MUST BE REMOVED, PROPERLY REGRADE AND SEED THESE
AREAS.
9. ALL INSTALLED BMP MEASURES MUST BE INSPECTED EVERY 7 DAYS
AND / OR WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5”.
AN INSPECTION LOG SHALL BE KEPT ON SITE AND MADE AVAILABLE
FOR REVIEW.
10. THE FOLLOW GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
· AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT
REQUIRED TO DO THE JOB
· PRODUCTS AND MATERIALS WILL BE STORED AWAY FROM THE
SURFACE DRAINAGE SYSTEM.
· ALL MATERIALS STORED ONSITE WILL BE SORTED IN A NEAT,
ORDERLY MANNER IN THEIR IN THEIR APPROPRIATE CONTAINER
AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE.
· PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH
THE ORIGINAL MANUFACTURE'S LABEL.
· SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
· MANUFACTURES RECOMMENDATIONS FOR PROPER USE AND
DISPOSAL WILL BE FOLLOWED.
· THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE
PROPER USED AND DISPOSAL OF MATERIALS ONSITE.
· DUST WILL BE CONTROLLED BY WATER SPRAYED FROM A TANKER
TRUCK AS NEEDED DURING DRY WEATHER.
· ANY NEEDED DEWATERING SHALL BE FILTERED PRIOR TO RELEASE
ON THE SURFACE.
ROCK CHECK DAM,
SEE DETAIL SHEET
C003
07 15
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
EDGE KEY INTO
EXISTING (TYP)
EDGE KEY INTO
EXISTING (TYP)
EXISTING TREE TO
BE REMOVED
PROPOSED 5' WIDE EXPOSED
AGGREGATE SIDEWALK,
SEE DETAIL SHEET
PROPOSED 5' WIDE EXPOSED
AGGREGATE SIDEWALK,
SEE DETAIL SHEET
EXISTING PARK SIGN
ASPHALT PARKING LOT,
PER DETAIL SHEET
R25.0'
R25.0'
EXISTING PARK BOUNDARY RD
NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE
PROJECT LIMITS FOR ANY SITE DEMOLITION AND SHALL BE
RESPONSIBLE FOR MAINTAINING ANY AND ALL WORK WITHIN THE
LIMITS OF THE WORK AS DESIGNATED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY ENCROACHMENT BEYOND THE LIMITS AND
SHALL BE RESPONSIBLE FOR OBTAINING ANY PERMITS, PERMISSIONS,
EASEMENTS, ETC TO UTILIZE AREAS BEYOND THE PROJECT LIMITS.
2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND OR OVERHEAD
UTILITIES PRIOR TO DEMOLITION WORK EITHER BY UTILIZATION OF
B.U.D. OR A 3RD PARTY UTILITY LOCATE COMPANY. COSTS FOR
ESTABLISHING THE LOCATION OF EXISTING UTILITIES SHALL BE THE
COST OF THE CONTRACTOR.
3. THE CONTRACTOR SHALL ESTABLISH TRAFFIC CONTROL AND SIGNING
AS REQUIRED BY THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES, PROVIDE TEMPORARY BARRICADES, TRAFFIC BARRELS,
FLAGGERS AS NECESSARY FOR CREW AND MOTORIST SAFETY AND PER
THE MAINTENANCE OF TRAFFIC/TEMPORARY TRAFFIC CONTROL PLAN
INCLUDED IF INCLUDED IN THE CONTRACT DOCUMENTS. CONTRACTOR
IS RESPONSIBLE FOR COORDINATING ANY STREET CLOSURES,
DETOURS, ETC. WITH AUTHORITIES HAVING JURISDICTION AND
GOVERNING AGENCIES OF STREETS AND ROADS.
4. DURING CONSTRUCTION, THE WORK AREA SHALL BE KEPT CLEAR OF
DEBRIS. ALL DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE
SITE AND DISPOSED OF IN A LAWFUL MANNER. CONTRACTOR SHALL
PAY ALL HAULING AND LANDFILL EXPENSES AND OBTAIN ANY
NECESSARY PERMITS TO DO SO.
5. CONTRACTOR TO PROTECT EXISTING TREES OUTSIDE OF
CONSERVATION LIMITS. NO MATERIAL IS TO BE STORED WITHIN A
TREE DRIP LINE.
6. PROVIDE TREE PROTECTION FENCING FOR ALL EXISTING TREES THAT
ARE NOT DESIGNATED TO BE REMOVED WITHIN THE CONSTRUCTION
LIMITS.
7. SAWCUT EDGES OF PAVEMENT TO REMAIN IN CLEAN STRAIGHT LINES.
COORDINATE SAWCUTS WITH PROPOSED LAYOUT PLAN.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ANY
OVERHEAD UTILITY LINES THAT MAY CONFLICT WITH ANY ASPECT OF
THE SITE DEMOLITION AND SHALL BE RESPONSIBLE FOR SAFE
OPERATION OF EQUIPMENT AND PERSONNEL THAT MAY CONFLICT
WITH ANY OVERHEAD UTILITY SERVICES.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH
LOCAL NOISE ORDINANCES THAT MAY RESTRICT THE TYPE OF
EQUIPMENT OR TIMES OF WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXTENT, IF ANY, OF LOCAL
NOISE ORDINANCES ASSOCIATED WITH CONSTRUCTION OR
DEMOLITION ACTIVITIES.
10. DIMENSIONS ARE NOT TO BE SCALED. SHOULD DISCREPANCIES OCCUR
WITH DIMENSIONS ON THESE PLANS, NOTIFY ENGINEER FOR
CLARIFICATION.
11. PRIOR TO CONSTRUCTION OR DEMOLITION, THE CONTRACTOR SHALL
VERIFY THE LOCATION OF ALL UTILITIES SO THAT NEW
CONSTRUCTION WILL NOT DAMAGE OR INTERFERE WITH EXISTING
UTILITY LINES. SHOULD DAMAGE OCCUR, IT IS THE CONTRACTOR'S
RESPONSIBILITY TO REPAIR AND/OR REPLACE SAID DAMAGE AT THE
CONTRACTOR'S EXPENSE..
12. ALL PAVEMENT MARKING LINES SHALL BE 4" PAINTED AND MEASURED
CENTER TO CENTER U.N.O.
13. ALL WORK, CONSTRUCTION REQUIREMENTS, AND PERFORMANCE
STANDARDS SHALL COMPLY WITH LOCAL AND STATE STANDARDS.
14. EXISTING BUILDINGS, PAVEMENTS, SIDEWALKS, AND OTHER SITE
IMPROVEMENTS SHALL BE PROTECTED DURING CONSTRUCTION. THEIR
CONDITIONS SHALL BE PHOTOGRAPHICALLY DOCUMENTED PRIOR TO
CONSTRUCTION. DAMAGE SHALL BE REPAIRED AT CONTRACTOR'S
EXPENSE.
15. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL OSHA
JOBSITE REQUIREMENTS.
16. ALL PAVED AREAS INCLUDING SIDEWALKS, PARKING AREAS, SERVICE
AREAS, ETC. ARE SPECIFIED WITH MATERIALS FOR THE INTENDED
FINAL USE OF EACH AREA. THE AREAS ARE NOT SPECIFIED TO BE USED
FOR TEMPORARY CONSTRUCTION TRAFFIC. SHOULD THE CONTRACTOR
INSTALL OR CONSTRUCT THE PAVED AREA AS SPECIFIED AND THE USE
FOR TEMPORARY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL
(AT NO COST TO THE OWNER) REPAIR AND/OR RECONSTRUCT THE
AREAS WITH REGARDS TO MEETING MATERIAL SPECIFICATIONS,
SUBSEQUENT STABILIZATION, AND GRADING PRIOR TO CONSTRUCTION
OF FINAL PAVEMENT SURFACES.
17. ALL IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY SHALL
COMPLY WITH MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND
SHALL COMPLY WITH LOCAL, STATE, AND FEDERAL PUBLIC RIGHT OF
WAY ACCESSIBILITY GUIDELINE STANDARDS AND REGULATIONS.
CONTRACTOR SHALL SCHEDULE ANY REQUIRED INSPECTIONS WITH
LOCAL/STATE INSPECTORS.
TOTAL AREA TO BE PAVED
PARKING LOT = 4,500 SF
R25.0'
R10.0'
EXISTING ROADBED TO
REMAIN (PARK TRAIL)
10.0' 20.0'
34.0'
10.0'
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C004
BGB
CEDAR SINK SITE
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
34.2'
R519.3'
FLUSH CURB (TYP),
SEE DETAIL SHEET
INTEGRAL CURB (TYP),
SEE DETAIL SHEET
30° ANGLED
PARKING (TYP)
PROPOSED CAMERA POST,
SEE ARCHITECTURAL PLANS
2' CURB
TAPER
ACCESSIBLE CURB RAMP,
SEE DETAIL SHEET
POST CURB (TYP),
SEE DETAIL SHEET
WHEEL STOP (TYP),
SEE DETAIL SHEET
18.5'
2' CURB
TAPER
2' CURB
CUT
R5.0'
R1.0'
R2.0'
R4.0'
R2.0'
R7.0'
R7.0'
ACCESSIBLE CURB RAMP,
SEE DETAIL SHEET
20.5'
EXISTING SIGN TO BE RELOCATED TO A
LOCATION SPECIFIED BY OWNER
R10.0'
R508.0'
6.0'
52.7'
15.5'
21.7'
4.4'
4.8'
4.1'
POST CURB (TYP),
SEE DETAIL SHEET
INTEGRAL CURB (TYP),
SEE DETAIL SHEET
2' CURB
TAPER
C004
08 15
715.00
714.00
713.00
712.00
711.00 712.00
713.00
714.00
713.00 712.00
711.00 710.00
714.00
T/C = 714.00 B/C = 713.50
713.0 T/C = 713.60 B/C = 713.10
T/C = 713.60 B/C = 713.10
T/C = 714.25 B/C = 713.75
T/C = 713.60 B/C = 713.10
713.40 T/C = 713.80
B/C = 713.30
T/C = 714.00 B/C = 713.50
T/C = 714.50 B/C = 714.00
T/C = 714.90 B/C = 714.40
714.50
714.55 714.70
714.90 714.90
714.70
714.85 714.85
714.10
714.15
714.10
713.40
713.65
713.55
714.15
713.55
714.50
714.75
715.15
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
EXISTING PARK BOUNDARY RD
15 LF OF 18" ADS HP STORM
PIPE CONNECT TO
EXISTING STORM LINE
WITH COUPLING PER
MANUFACTURER'S
RECOMMENDATION
EXISTING 18" STORM LINE
= DRAINAGE ARROW
EXISTING ROADBED
TO REMAIN
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C005
BGB
CEDAR SINK GRADING
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
O.E. = 709.50
10 LF OF 12" ADS HP STORM
@ 1.0% SLOPE
PROPOSED 12" TRAFFIC
RATED NYLOPLAST
DRAIN BASIN WITH
LOCKING DI GRATE
RIM = 713.00
I.E. = 711.00
3:1 SLOPE
3:1 SLOPE
O.E. = 710.90
NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE PROJECT LIMITS
FOR ANY SITE DEMOLITION AND SHALL BE RESPONSIBLE FOR MAINTAINING ANY AND
ALL WORK WITHIN THE LIMITS OF THE WORK AS DESIGNATED. THE CONTRACTOR
WILL BE RESPONSIBLE FOR ANY ENCROACHMENT BEYOND THE LIMITS AND SHALL BE
RESPONSIBLE FOR OBTAINING ANY PERMITS, PERMISSIONS, EASEMENTS, ETC TO
UTILIZE AREAS BEYOND THE PROJECT LIMITS.
2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND OR OVERHEAD UTILITIES PRIOR TO
DEMOLITION WORK EITHER BY UTILIZATION OF B.U.D. OR A 3RD PARTY UTILITY
LOCATE COMPANY. COSTS FOR ESTABLISHING THE LOCATION OF EXISTING UTILITIES
SHALL BE THE COST OF THE CONTRACTOR.
3. THE CONTRACTOR SHALL ESTABLISH TRAFFIC CONTROL AND SIGNING AS REQUIRED
BY THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, PROVIDE TEMPORARY
BARRICADES, TRAFFIC BARRELS, FLAGGERS AS NECESSARY FOR CREW AND
MOTORIST SAFETY AND PER THE MAINTENANCE OF TRAFFIC/TEMPORARY TRAFFIC
CONTROL PLAN INCLUDED IF INCLUDED IN THE CONTRACT DOCUMENTS.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY STREET CLOSURES,
DETOURS, ETC. WITH AUTHORITIES HAVING JURISDICTION AND GOVERNING
AGENCIES OF STREETS AND ROADS.
4. DURING CONSTRUCTION, THE WORK AREA SHALL BE KEPT CLEAR OF DEBRIS. ALL
DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
LAWFUL MANNER. CONTRACTOR SHALL PAY ALL HAULING AND LANDFILL EXPENSES
AND OBTAIN ANY NECESSARY PERMITS TO DO SO.
5. CONTRACTOR TO PROTECT EXISTING TREES OUTSIDE OF CONSERVATION LIMITS. NO
MATERIAL IS TO BE STORED WITHIN A TREE DRIP LINE.
6. PROVIDE TREE PROTECTION FENCING FOR ALL EXISTING TREES THAT ARE NOT
DESIGNATED TO BE REMOVED WITHIN THE CONSTRUCTION LIMITS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ANY OVERHEAD
UTILITY LINES THAT MAY CONFLICT WITH ANY ASPECT OF THE SITE DEMOLITION
AND SHALL BE RESPONSIBLE FOR SAFE OPERATION OF EQUIPMENT AND PERSONNEL
THAT MAY CONFLICT WITH ANY OVERHEAD UTILITY SERVICES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH LOCAL NOISE
ORDINANCES THAT MAY RESTRICT THE TYPE OF EQUIPMENT OR TIMES OF WORK. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXTENT, IF ANY, OF
LOCAL NOISE ORDINANCES ASSOCIATED WITH CONSTRUCTION OR DEMOLITION
ACTIVITIES.
9. PRIOR TO CONSTRUCTION OR DEMOLITION, THE CONTRACTOR SHALL VERIFY THE
LOCATION OF ALL UTILITIES SO THAT NEW CONSTRUCTION WILL NOT DAMAGE OR
INTERFERE WITH EXISTING UTILITY LINES. SHOULD DAMAGE OCCUR, IT IS THE
CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE SAID DAMAGE AT THE
CONTRACTOR'S EXPENSE..
10. ALL WORK, CONSTRUCTION REQUIREMENTS, AND PERFORMANCE STANDARDS SHALL
COMPLY WITH LOCAL AND STATE STANDARDS.
11. ALL PAVED AREAS INCLUDING SIDEWALKS, PARKING AREAS, SERVICE AREAS, ETC.
ARE SPECIFIED WITH MATERIALS FOR THE INTENDED FINAL USE OF EACH AREA. THE
AREAS ARE NOT SPECIFIED TO BE USED FOR TEMPORARY CONSTRUCTION TRAFFIC.
SHOULD THE CONTRACTOR INSTALL OR CONSTRUCT THE PAVED AREA AS SPECIFIED
AND THE USE FOR TEMPORARY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL
(AT NO COST TO THE OWNER) REPAIR AND/OR RECONSTRUCT THE AREAS WITH
REGARDS TO MEETING MATERIAL SPECIFICATIONS, SUBSEQUENT STABILIZATION,
AND GRADING PRIOR TO CONSTRUCTION OF FINAL PAVEMENT SURFACES.
12. ALL IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY SHALL COMPLY WITH
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND SHALL COMPLY WITH LOCAL,
STATE, AND FEDERAL PUBLIC RIGHT OF WAY ACCESSIBILITY GUIDELINE STANDARDS
AND REGULATIONS. CONTRACTOR SHALL SCHEDULE ANY REQUIRED INSPECTIONS
WITH LOCAL/STATE INSPECTORS.
13. SPOT ELEVATIONS DESIGNATE FINISHED SURFACE ELEVATION.
14. ANY MATERIAL RESULTED FROM A NET CUT OF THE SITE IS TO BE REMOVED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
15. TOPSOIL SHALL BE STRIPPED, STOCKPILED, AND REDRESSED FOR THE ENTIRETY OF
THE DISTURBED AREA SHOWN.
16. ALL ROCK ENCOUNTERED SHALL BE UNDERCUT MINIMUM 12" BELOW SUBGRADE OR
AS SPECIFIED IN THE GEOTECHNICAL REPORT U.N.O. ALL EXCAVATION IS
UNCLASSIFIED.
17. ALL GRADING SHALL RESULT IN WATER BEING DIRECTED AWAY FROM STRUCTURES,
NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
18. CONTRACTOR MUST COMPLY WITH ALL ADA REQUIREMENTS AND SPECIFICATIONS
INCLUDING MAX 2% CROSS SLOPE FOR ADA ROUTES AND MAX 2% SLOPE ON LANDING
AND RAMPS. CONTRACTOR MUST VERIFY ADA COMPLIANT GRADES PRIOR TO PAVING
AND NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
19. ANY FILL MATERIAL MUST BE VERIFIED BY A LICENSED GEOTECHNICAL ENGINEER AS
SUITABLE STRUCTURAL FILL MATERIAL.
20. RIM ELEVATIONS OF ALL STRUCTURES SHALL BE FLUSH WITH SURROUNDING GRADE
U.N.O.
21. TOPSOIL SHALL BE MINIMUM 4" DEEP IN GRASS AREAS AND 12" DEEP IN LANDSCAPED
AREAS.
22. FINISH GRADING MUST BE INSPECTED AND APPROVED BY ENGINEER AND MUST BE
FREE OF OBSTACLES, DEPRESSIONS, OR OTHER INCONSISTENCIES. ANY REGRADING
EFFORTS MUST BE COMPLETED AT CONTRACTOR'S EXPENSE.
23. REFER TO ARCHITECTURAL PLANS FOR ALL TIE-INS WITH BUILDING UTILITIES AND
RAIN WATER LEADERS. NOTIFY ENGINEER IF ANY DISCREPANCIES ARISE.
24. STORM PIPING STONE BACKFILL TO BE COMPLETED PER MANUFACTURER'S
SPECIFICATION, BUT MUST NOT BE LESS THAN 12" OVER PIPING IN TURF AREAS AND
FULL DEPTH UNDER PAVEMENT.
25. CONTRACTOR SHALL COMPLETE ANY DEWATERING ACTIVITIES AT THE
CONTRACTOR'S EXPENSE. DEWATERING MUST BE PERFORMED IN THE PRESENCE OF
GROUNDWATER INTRUSION.
26. ANY SUMPS IN STORMWATER STRUCTURES SHALL BE FILLED WITH CONCRETE TO
INVERT ELEVATION SPECIFIED.
= DRAINAGE ARROW
C005
09 15
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
EXISTING PARK BOUNDARY RD
EXISTING 18" STORM LINE
EXISTING ROADBED
TO REMAIN
DESIGNED:
CADD:
TECH REVIEW:
DATE:
SUB SHEET NO:
TITLE OF SHEET:
DRAWING NO.
PMIS/PKG NO.
OF
A/E FIRM:
PRIME:
SHEET
SUB:
HMB
FRANKFORT, KY
WALKER
ARCHITECTS,
GAINESVILLE, FL
MACA 323725,325833; MACA 323722,325832; MACA 323654,325833
DKB
DKB
C006
BGB
CEDAR SINK EPSC
NPS - MAMMOTH CAVE PARKING AND
ENTRY SIGN RENOVATIONS
BEFORE YOU DIG
The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system for information on the location of existing underground utilities. The call is to be placed a minimum of two (2) and no more than ten (10) business days prior to excavation. The contractor should be aware that owners of underground facilities are not required to be members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate excavation with the utility owners, including those whom do not subscribe to KY 811. It may be necessary for the contractor to contact the County Court Clerk to determine what utility companies have facilities in the area.
10 LF OF 12" ADS HP STORM
@ 1.0% SLOPE
RIP RAP OUTLET PROTECTION,
SEE DETAIL SHEET
BIODEGRADABLE EROSION CONTROL
MATTING ON ALL SLOPES GREATER THAN 4:1,
SEE DETAIL SHEET
SILT FENCE J-HOOK,
SEE DETAIL SHEET
INLET PROTECTION,
SEE DETAIL SHEET
SILT FENCE, SEE DETAIL SHEET
SILT FENCE J-HOOK,
SEE DETAIL SHEET
NOTES:
1. NO VEGETATION OR CONSTRUCTION DEBRIS SHALL BE BURIED ON SITE
AND NO BURNING PITS SHALL BE PLACED IN FUTURE RIGHT - OF - WAY
OR LIKELY BUILDING LOCATIONS OR SANITARY SEWER EASEMENTS.
2. ALL DISTURBED AREAS THAT REMAIN INACTIVE FOR MORE THAN 21
DAYS SHALL BE STABILIZES BY SEEDING, SODDING MULCHING,
COVERING, OR BY OTHER EQUIVALENT EROSION CONTROL MEASURES
AS SOON AS PRACTICABLE, BUT IN NO CASES MORE THAN 14 DAYS
AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS
TEMPORARILY OR PERMANENTLY CEASED.
3. WHEN CONDITIONS PROHIBIT THE APPLICATION OF TEMPORARY, OR
PERMANENT SEEDING, NON-VEGETATIVE SOIL STABILIZATION
PRACTICES SUCH AS MULCHING AND MATTING SHALL BE USED, UNTIL
SUCH TIME AS CONDITIONS PERMIT.
4. INSTALL SLIT FENCES FOR CURB INLET PROTECTION AS INDICATED ON
SITE PLAN PRIOR TO ANY OTHER DISTURBANCES.
5. SLIT FENCE SHALL BE CLEANED/REPAIRED WHEN SLIT BUILDUP
REACHES 1/3 SLIT FENCE HEIGHT.
6. PERFORM ROUGH GRADING OPERATION AS INDICATED ON
CONSTRUCTION DRAWINGS.
7. REDISTRIBUTE TOPSOIL AND SOW GRASS SEED IMMEDIATELY AFTER
SPREADING TOPSOIL.
8. MAINTAIN ALL EROSION CONTROL DEVICES IN FULLY FUNCTIONAL
CONDITION UNTIL 90% OF THE CONTRIBUTING WATERSHED IS BUILT
OUT AND/OR VEGETATIVE IS ACHIEVED. AT SUCH TIME THAT ALL SLIT
FENCE MUST BE REMOVED, PROPERLY REGRADE AND SEED THESE
AREAS.
9. ALL INSTALLED BMP MEASURES MUST BE INSPECTED EVERY 7 DAYS
AND / OR WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5”.
AN INSPECTION LOG SHALL BE KEPT ON SITE AND MADE AVAILABLE
FOR REVIEW.
10. THE FOLLOW GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
· AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT
REQUIRED TO DO THE JOB
· PRODUCTS AND MATERIALS WILL BE STORED AWAY FROM THE
SURFACE DRAINAGE SYSTEM.
· ALL MATERIALS STORED ONSITE WILL BE SORTED IN A NEAT,
ORDERLY MANNER IN THEIR IN THEIR APPROPRIATE CONTAINER
AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE.
· PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH
THE ORIGINAL MANUFACTURE'S LABEL.
· SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
· MANUFACTURES RECOMMENDATIONS FOR PROPER USE AND
DISPOSAL WILL BE FOLLOWED.
· THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE
PROPER USED AND DISPOSAL OF MATERIALS ONSITE.
· DUST WILL BE CONTROLLED BY WATER SPRAYED FROM A TANKER
TRUCK AS NEEDED DURING DRY WEATHER.
· ANY NEEDED DEWATERING SHALL BE FILTERED PRIOR TO RELEASE
ON THE SURFACE.
ROCK CHECK DAM,
SEE DETAIL SHEET
RIP RAP OUTLET PROTECTION,
SEE DETAIL SHEET
RIP RAP SPLASH BLOCK,
SEE DETAIL SHEET
C006
10 15
E E E E E E E E E E E E E E E E
846 847 848 849 850 851 852 853 854 855 856
853 854
2851850
3/14/2024
Feet
0 10 20
1" = 10' ON 24"x36" SHEET
NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING THE
PROJECT LIMITS FOR ANY SITE DEMOLITION AND SHALL BE
RESPONSIBLE FOR MAINTAINING ANY AND ALL WORK WITHIN THE
LIMITS OF THE WORK AS DESIGNATED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY ENCROACHMENT BEYOND THE LIMITS AND
SHALL BE RESPONSIBLE FOR OBTAINING ANY PERMITS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .