This document is a submittal list with review estimate template for a National Park Service (NPS) construction project. It outlines the various submittals required throughout the construction phase, including product data, shop drawings, samples, and certifications across numerous specification sections. The submittal list covers requirements for Division 1 general requirements, as well as Division 2-49 technical specifications.

The template is designed to be used by the Architect/Engineer (A/E) to provide an estimate of the review time required for each action submittal by discipline (e.g. architect, civil engineer, structural engineer). This information is then used to negotiate the submittal review portion of the A/E's construction services task order. The Construction Management Representative is responsible for reviewing all informational submittals. The document provides detailed instructions for its use by the NPS, A/E, and Construction Contracting Officer Representative.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAHA

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:CAHA 248511(Complete this portion for Architect / Engineer (A/E)
Project Title:OREGON INLET FISHING CENTER – PAVEMENT MILL AND OVERLAYconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
DIVISION 1 SPECIFICATIONS
01 31 00Project Management & Coordination
1.3.ADivision 1 DocumentsX
1.4.AGeneral: RFIX
1.7.C.4Pollution Prevention (P2) practicesX
1.7.C.5Compliance with environmental regulationsX
01 32 16Construction Schedule
1.3.BSchedule of ValuesX
1.3.CConstruction Baseline ScheduleX
1.3.DConstruction Schedule updatesX
1.3.EConstruction Schedule Revisions and Time Impact AnalysisX
1.4.BContractor's Schedule RepresentativeX
01 32 33Photographic Documentation
1.2.AConstruction ImagesX
01 35 23Safety Requirements
1.2.AAccident Prevention PlanX
01 35 43.13Environmental Procedures for Hazardous Materials
1.7.AHazardous Materials and Waste Work PlanX
1.7.B; 3.2.AHazardous Materials and Waste ReportX
01 35 46Indoor Air Quality Management
1.3.AIndoor Air Quality (IAQ) Management PlanX
1.3.B.1Material Safety Data SheetsXXX
01 35 91Historic Preservation Treatment Procedures
1.3.AHistoric Preservation Treatment PlanX
1.3.BAlternative Methods and MaterialsX
1.3.CPhotographs or VideotapeXX
01 40 00Quality Requirements
1.4.AQuality Control PlanX
1.4.BTesting Agency Qualification DataX
1.4.CContractor's Quality Control Daily ReportsX
1.4.DTest ReportsX
1.4.EOff-Site Inspection ReportsX
1.4.GPermits, Licenses, and CertificatesX
1.6.DCertified written test reports, inspections and other Quality Control services.XX
01 57 23Temporary Storm Water Pollution Prevention
1.3.ASWPPP PlanX
1.3.BInspection ScheduleX
1.3.CInspection ScheduleX
1.3.DErosion Control ProductsXX
1.4.AQuality Assurance PlanX
1.4.DPollution Prevention Manager DesigneeX
1.4.EPollution Prevention and Erosion Control Manager DesigneeX
01 67 00Product Requirements
1.3.A.1Affirmative Procurement Reporting FormX
1.3.A.2Environmental DataXX0000000
1.3.A.3SDS - Safety Data Sheets (formerly MSDS)XX
1.3.A.4Chain-of-Custody DocumentationXX
1.8.BSpecial WarrantiesXX
01 73 29Cutting and Patching
1.2.ACutting and Patching PlanX
01 73 40Execution
1.2.ALandfill ReceiptsX
1.2.BQuantity SurveysX
01 74 19Construction Waste Management & Disposal
1.4.AWaste Management PlanX
1.4.BProgress DocumentationX
1.4.CWaste Reduction CalculationsX
1.4.DRecords of DonationsX
1.4.ERecords of salesX
1.4.FRecycling and Processing Facility RecordsX
1.4.GLandfill and Incinerator Disposal RecordsX
1.4.HQualification DataX
1.4.IProgress PaymentXX
01 77 00Closeout Procedures
1.3.ACloseout documentsXXXX
1.6WarrantiesX
01 78 23Operation & Maintenance Data
1.2.AOperation and Maintenance ManualsXX
01 79 00Demonstration and Training
1.3.AInstruction Program OutlineX
1.3.BDemonstration and Training VideoXX
01 91 14Total Building Commissioning
1.6.ATwo (2) Week look-ahead schedulesX
1.6.BCertificates of ReadinessX
1.6.CContractor’s Commissioning Representative QualificationsX
1.6.DCommissioning PlanX
1.6.EPre-functional checklistsX
1.6.FOwner’s project requirementsX
1.6.GFunctional performance test formsX
1.6.HList of test instrumentation, equipment, and monitoring devicesX
1.6.IDeficiency Report and Resolution RecordX
DIVISION 2-49 SPECIFICATIONS
02 41 00Demolition & Abandonment
1.2.B.1Permit for transportation and disposal of debrisX
1.2.B.2Proposed method and scheduleX
02 41 16Structure Demolition
1.2.BSchedule of demolitionX
02 41 19Selective Demolition
1.3.ASchedule of work and methodsX
03 11 13Cast-in-Place Concrete Forms
1.3.AQuality Assurance/Control of Instructions for form release agent
1.3.BShop Drawings & Engineering DataX
2.1.BExpansion/Contraction JointsX
03 21 00Concrete Reinforcing Steel
1.3.BSupplier Certification that steel meets minimum requirementsXX
03 30 00Cast-In-Place Concrete Site Elements
1.3.AProduct DataXX
1.3.BSamplesX
1.3.CConcrete Mix DesignX
1.3.DMaterial and Mill CertificatesX
1.3.EConstruction JointsXX
1.3.FPour Sequence for Mat FoundationX
1.3.GIndustrial Slabs Pour SequenceX
1.3.HConcrete Test break resultsX
03 31 00Normal-Weight Structural Concrete
1.4.B.1Concrete Mix DesignX
1.4.B.2Delivery TicketsX
03 40 00Precast Concrete
1.3.A.1Shop DrawingsX
1.3.A.2Structural Calculations signed and sealed by current PE or SE licenseeX
1.3.A.3Anti-buoyancy calculationsX
1.3.A.4Placement DrawingsX
1.3.A.5Reinforcement ScheduleX
1.3.A.7Manhole lids rated for H-20 LoadingX
1.3.A.8Non-shrink Grout Manufacturer’s DataX
03 82 13Concrete Core Drilling
1.4.BConcrete Coring ProcedureX
1.4.CProcedure to repair cut reinforcementX
1.4.DCore location descriptions with cores to COX
05 05 23.16Structural Welding
1.2.A.1Welder Quality Assurance PlanX
1.2.A.2Welder, Welding Operator, and Tacker QualificationX
1.2.A.3Welding Electrodes and RodsX
1.2.A.4Nondestructive Testing Weld Inspection LogX
05 50 00Product Data
1.3.BProduct DataXX
1.3.CShop DrawingsX
05 50 16Miscellaneous Metal for Utilities
1.5.BProduct DataXX
05 51 19Metal Grating Stairs
1.2.AShop DrawingsX
05 52 00Metal Railings
1.2.AShop DrawingsX
05 52 13Pipe and Tube Railings
1.2.AShop DrawingsX
05 53 00Aluminum Grating
1.2.AShop DrawingsX
06 10 00Carpentry
1.4.BProduct DataXX
06 17 53Shop Fabricated Wood Trusses
1.4.BShop DrawingsX
1.4.CStructural Calculations signed/sealed by current CA PEX
1.4.DCertificate of Conformance to CodesX
06 20 00Interior Finish Carpentry
1.4.BLow-Emitting Adhesives & Sealant MaterialsXX
1.4.CFinish Wood SamplesX
07 21 00Building Insulation (Ash Mtn. Only)
1.4.AProduct DataXX
07 25 00Weather Resistive Barrier System (Ash Mtn. Only)
1.4.BProduct DataXX
1.4.CQuality AssuranceX
1.4.DWarranty AuthorizationX
07 31 13Asphalt Shingles
1.4.BProduct DataXX
1.4.CSamplesX
1.4.DManufacturers WarrantyX
1.4.EInstaller CertificationX
07 46 46Fiber-Cement Siding
1.3.BProduct DataXX
07 62 00Sheet Metal Flashing & Trim
1.4.BProduct DataXX
1.4.CShop DrawingsX
1.4.DColor Samples for Prefinished Sheet MetalX
1.4.EFastener SamplesX
07 81 00Firestopping
1.3.BProduct Data on Volatile Organic compounds
1.3.CInstaller Qualification DataX
1.3.DTesting Laboratory accreditationsX
1.3.EManufacturers Literature and DataXX
1.3.FCertificates On ability to meet fire ratingsX
1.3.GManufacturers approval on surfaces, install & applicatorXX
07 92 00Joint Sealers
1.3.B.1Certification Statement of VOC levels of sealantsXX
1.3.B.2Certification Statement of VOC levels of primersXX
07 95 13Expansion Joint Cover Assemblies
1.5.BShop DrawingsX
08 11 13Hollow Metal Doors & Frames (Ash Mtn. Only)
1.4.AProduct DataXX
1.4.BShop DrawingsX
1.4.CDoor ScheduleXX
08 14 00Wood Doors
1.3.BProduct DataXX
1.3.CShop DrawingsX
08 31 00Access Doors & Panels
1.2.AProduct DataXX
1.2.BShop DrawingsX
1.2.CWarrantyX
08 54 13Fiberglass Windows
1.4.BProduct DataXX
1.4.CShop DrawingsX
08 71 00Door Hardware
1.4.BFinish Hardware ScheduleXX
08 80 00Glazing
1.4.BProduct DataXX
1.4.CExterior Insulated SamplesX
1.4.DSingle Glazing SamplesX
08 87 00Glazing Surface Films
1.4.BShop DrawingsX
1.4.CSamplesX
1.4.DOperation and Maintenance DataXX
1.4.EMockupsX
08 90 00Louvers & Vents
1.4.BProduct DataXX
1.4.CShop DrawingsX
1.4.DSampleX
09 29 00Gypsum Board Assembly (Ash Mtn. Only)
1.4.BProduct DataXX
09 65 00Resilient Flooring (Ash Mtn. Only)
1.4.BSamplesX
09 72 00Plastic Sheet Wainscots
1.4.BProduct DataXX
1.4.CSampleX
09 90 00General Paints Concrete Stain & Coatings
1.4.BProduct DataXX
1.4.CPaint ScheduleX
1.4.DPaint Drawdown SamplesX
09 96 56High-Performance Coatings
1.4.BProduct DataXX
1.4.CSamplesX
1.4.DScheduleX
1.4.EManufacturer’s CertificateXX
1.4.FManufacturer’s InstructionsX
1.4.GQuality Assurance DataXX
1.4.HQualifications StatementsX
10 14 00Signage
1.4.BProduct DataXX
1.4.CShop DrawingsX
1.4.DSelection SamplesX
1.4.EVerification SamplesX
10 44 00Fire Extinguisher and Brackets (Ash Mtn. Only)
1.4.BProduct DataXX
12 32 00Casework (Ash Mtn. Only)
1.4.BLow Emitting MaterialsX
1.4.CProduct DataXX
1.4.DShop DrawingsX
1.4.ESamplesX
13 34 18Post-Frame Building Systems
1.3.AProduct DataXX
1.3.BShop DrawingsX
1.3.CDesign Data & CalculationsX
1.4.EColor Samples for SelectionX
22 05 00Common Work Results for Plumbing
1.4.AProduct DataXX
1.4.BWelding CertificatesXX
22 05 19Meters & Gauges for Plumbing Piping
1.4.AManufacturers Literature and DataXX
1.4.BProduct DataXX
22 05 23General Duty Valves for Plumbing Piping
1.4.AProduct Data for each type of valve indicatedXX
22 05 29Hangers & Supports for Plumbing Piping & Equipment
1.5.AProduct DataXX
1.5.BShop DrawingsX
1.5.C.1Detail trapeze hanger fabrication and assemblyXXXX
1.5.C.2Trapeze hanger Design CalculationsX
1.5.DWelding CertificatesX
22 05 48Vibration & Seismic Controls for Plumbing Piping & Equipment
1.5.AProduct DataXX
1.5.B.1Design CalculationsX
1.5.B.2Riser Support DiagramsXX
1.5.B.3Vibration Isolation Base DetailsX
1.5.B.4Seismic-Restraint DetailsX
1.5.CCoordination DrawingsX
1.5.DWelding CertificatesX
1.5.EQualification DataX
1.5.FField quality-control test reportsX
1.5.GOperation and Maintenance DataXX
22 05 53Identification for Plumbing Piping & Equipment
1.3.AProduct DataXX
1.3.BSamplesX
1.3.CEquipment Label ScheduleX
1.3.DValve Numbering SchemeX
1.3.EValve SchedulesX
22 07 00Plumbing Insulation
1.3.AProduct DataXX
1.3.BShop Drawings
1.3.CSamplesX
1.3.DInstaller Qualification DataX
1.3.EMaterial Test ReportX
1.3.FField Quality Control ReportX
22 11 00Facility Water Distribution (Ash Mtn. Only)
1.3.BProduct DataXX
22 11 19Domestic Water Piping Specialties
1.3.AProduct DataXX
1.3.BShop DrawingsX
1.3.CField Quality Control ReportsX
1.4.EOperation & Maintenance DataXX
22 13 13Facility Sanitary Sewers
1.4.AProduct DataXX
1.4.BManufacturer’s CertificateXX
1.4.CManufacturer’s InstructionsX
22 13 16Sanitary Waste & Vent Piping
1.5.AProduct DataXX
1.5.BLEED Product DataXX
1.5.CShop DrawingsX
1.5.DField quality-control inspection and test reportsXX
22 40 00Plumbing Fixtures (Ash Mtn. Only)
1.4.AProduct DataXX
1.4.BLEED SubmittalX
1.4.CShop DrawingsX
1.4.DOperations and Maintenance DataXX
1.4.EWarrantyX
23 05 00Common Work Results for HVAC
1.4.AProduct DataXX
1.4.BWelding CertificatesX
23 34 23HVAC Power Ventilators (Ash Mtn. Only)
1.4.AProduct DataXX
1.4.BShop DrawingsX
1.4.CCoordination DrawingsX
1.4.DCertified Factory & Construction Test ReportsX
1.4.EOperation and Maintenance ManualsXX
23 82 39Unit Heaters
1.4.AProduct DataXX
1.4.BLEED Product DataXX
1.4.CShop DrawingsX
1.4.DCoordination DrawingsXX
1.4.ESamples for Color SelectionX
1.4.FSamples for VerificationX
1.4.GSeismic CertificationXXX
1.4.HField Quality-Control Test ReportXX
1.4.IOperation & Maintenance DataXX
26 05 00Common Work Results for Electrical
1.4.AProduct Data – Sleeve SealsXX
26 05 19Low Voltage Electrical Power Conductors & Cables
1.4.AProduct DataXX
1.4.BField Quality-Control Test ReportsXXX
26 05 26Grounding & Bonding for Electrical Systems
1.3.AProduct DataXX
26 05 29Hangers & Supports for Electrical Systems
1.5.AProduct DataXX
26 05 33Raceway & Boxes for Electrical Systems
1.4.AProduct DataXX
1.4.BShop DrawingsX
26 05 48Seismic Requirements for Electrical Systems
1.5.AProduct DataXX
1.5.BCoordination DrawingsX
1.5.CWelding CertificatesXX
1.5.DQualification DataXX
1.5.EField Quality-Control Test ReportsXX
26 05 53Identification for Electrical Systems
1.3.AProduct DataXX
26 22 00Low-Voltage Transformers
1.3.AProduct DataXX
1.3.BShop DrawingsX
1.3.CSeismic CertificationXXX
1.3.DQualification Data - Testing AgencyXX
1.3.ESource Quality Control Test ReportsX
1.3.FField Quality-Control Test ReportsXX
1.3.GOperation and Maintenance DataXX
26 24 16Panel Boards
1.3.AProduct DataXX
1.3.BShop DrawingsX
1.3.CField quality-control reportsXX
1.3.DPanelboard schedulesX
1.3.EOperation and Maintenance DataXX
26 27 26Wiring Devices
1.4.AProduct DataXX
1.4.BShop DrawingsX
1.4.CSamplesX
1.4.DField Quality-Control Test ReportsXX
1.4.EOperation and Maintenance DataXX
26 28 13Fuses
1.3.AProduct DataXX
1.3.BOperation and Maintenance DataXX
26 28 16Enclosed Switches & Circuit Breakers
1.4.AProduct DataXX
1.4.BShop DrawingsX
1.4.COperation and Maintenance DataXX
26 29 23Variable-Frequency Motor Controllers
1.5.AProduct DataXX
1.5.BShop DrawingsX
1.5.CProduct CertificatesX
1.5.DSource Quality-Control ReportsX
1.5.EOperation and Maintenance DataXX
1.5.FLoad-current & Overload-Relay Heater ListXX
1.5.GLoad-Current & List Settings of Adjustable Overload RelaysXX
26 32 13.16Propane Drive Generator Sets
1.6.A.3Product DataXX
1.6.A.4Shop Drawingsx
1.6.A.5Computer CalculationsX
1.6.A.6Manufacture Qualification/Experience DataXX
26 36 23Automatic Transfer Switches
1.5.AProduct DataXX
1.6.AField quality-control reportsX
1.6.B.1Operation and Maintenance DataXX
1.6.B.3Field CertificationsXX
26 51 00Interior Lighting
1.4.AProduct DataXX
1.4.BProduct CertificatesX
1.4.CField quality-control reportsX
1.4.DOperation and Maintenance DataXX
1.4.EWarrantyXX
26 56 00Exterior Lighting
1.4.AProduct DataXX
1.4.BField quality-control reportsX
1.4.COperation and Maintenance DataXX
1.4.DWarrantyXX
31 10 00Site Clearing
1.2.ACertifications and TestingXXX
31 22 19Finish Grading
1.3.AQuality Control/AssuranceX
31 23 00General Excavation & Fill
1.3.BSamples and Test ResultsXX
31 23 16.10Importing Soils & Fill Materials
1.3.BCommercial Source CertificationX
1.3.CIndependent Testing Report & CertificationXX
1.3.DCertification & Gradation ReportXX
1.3.EIndependent Testing Laboratory QualificationXX
1.3.FIndependent Field Testing Service QualificationXX
31 23 33Trenching & Backfilling
1.4.BSheeting and Shoring PlanX
1.4.CA written description of barricading, shoring, cribbing, bracing, and sloping precautionsX
1.4.DA written procedure for trench dewatering and disposal of fluidized materials removedX
1.4.EPotholing ReportX
1.4.FQualifications of Independent Testing LaboratoryXX
1.4.GQualifications of Independent Field Testing ServiceXX
1.4.HMaterials Test Results and CertificationsX
1.4.IField Testing ReportX
1.4.JA written description of materials proposed for imported backfillX
3.1.A.1.aDewatering ProcedureX
31 23 33.20Restoration of Surfaces
1.3.ARestoration Operations ScheduleX
31 25 00Erosion & Sediment Control
1.3.BQuality Assurance / Control PlanX
1.3.CInformation to NPS for SWPPP PermitX
32 11 23Aggregate Base Courses
1.3.BCommercial Source CertificationX
1.3.CIndependent Testing Report & CertificationXX
1.3.DQualifications of Independent Testing LaboratoryXX
1.3.EQualifications of Independent Field Testing ServiceXX
1.3.FQuality Control ReportsXX
32 12 16Asphalt Paving
1.3.BQualifications of Independent Testing LaboratoryXX
1.3.CQualifications of Independent Field Testing ServiceXX
1.3.DCertifications and Laboratory Testing ResultsXX
1.3.EQuality Assurance Inspection DataX
32 12 16.10Removal & Processing of Asphalt for Recycling
1.3.BMethods of Pavement DemolitionXX
1.3.CDescriptions of Process & Equipment for Asphalt RecyclingX
1.3.DSamples of Processed Asphalt & Test ReportsXX
32 17 23Pavement Markings
1.3.BCertificates & Laboratory Testing ResultsX
1.3.CProduct DataXX
32 17 24Signage
1.3.BCertificates of ComplianceX
1.3.CManufacturers Quality Control PlanX
33 01 30.63Polyurea Interior Coating (Manholes, Tanks & Vaults)
1.3.B.1Coating Manufacturer Data SheetsX
1.3.B.2.aCertification of Factory ApplicatorXX
1.3.B.2.bFactory Quality Assurance ManagerXX
1.3.B.3Polyurea Coating Systems Factory Installed Application PlanX
1.3.B.4Third-Party Test Results Verifying Properties Of Coating MaterialsX
1.3.B.5Factory Applicator’s proceduresXX
1.3.B.6Certification of Factory ApplicatorX
33 05 63Concrete Vaults and Chambers
1.4.AShop DrawingsX
1.4.BCertifications signed and sealed by current SE licenseeXX
33 08 30Commissioning of Sanitary Sewerage Utilities
1.3.AHydrostatic testing test reportXXX
33 31 13Sanitary Sewer Pipe
1.3.ASanitary Sewer Pipe Material CertificationsX
33 33 33Temporary Sewer Bypass Pumping
1.3.ABypass Pumping PlanX
1.3.BOutline for SPPP DevelopmentX
1.3.CPlan to handle existing Wastewater FlowsX
40 05 19Ductile Iron Process Pipe
1.5.BProduct DataXX
1.5.CShop DrawingsX
40 61 13Process Control System - General
1.4Shop DrawingsX
40 61 21Process Control System - Testing
1.2.BFunctional Test DocumentationXXX
40 66 33Process Control System - Conductors
1.3.AProduct DataXX
1.3.BField quality-control reportsX
1.3.COperation and Maintenance DataXX
40 43 26Gauge Pressure Transmitter (Ash Mtn. Only)
1.3.AProduct DataXX
46 53 00Biological Treatment Sytem
1.3Shop DrawingsX
33 05 26Utility Line Identification Marking
1.2.BSamplesX
1.2.CMaterial CerifiactionX
33 41 14Storm Sewer Drainage Piping
1.3.BManufacturer’s Material SpecificationsXX
1.3.CManufacturer's Installation GuideXX

Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) 01+024page &P of

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) 01+024page &P of

File details come from the government source that posted it. Updated .