This statement of work outlines requirements for replacing the telephone system at Chaco Culture National Historical Park with a new Avaya IP Office VoIP system. The scope of work includes installing an Avaya IP Office, 31 desk phones, one conference phone, embedded voicemail licenses, and an UPS. Additional requirements specify installing the system within 90 days, conducting a site survey, ensuring IPv6 compliance, supporting voice, caller ID and fax, allowing separate voice and data VLANs, configuring Aruba switches, and testing phone functionality. The contractor must also provide training, a one-year warranty, and optional yearly maintenance agreements for up to five years. The related solicitation from the National Park Service seeks proposals for installing the new VoIP phones and telephone system, with optional years for maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1323Q0086_Amd_0002.pdf | ||
| B09_Questions_Answers_0002.docx | DOCX document | |
| A06_Cabling_Standards_0001.pdf | ||
| Sol_140P1323Q0086_Amd_0001.pdf | ||
| B03_0001.pdf | ||
| A15_0001.pdf | ||
| Sol_140P1323Q0086.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for Chaco Culture National Historical Park Telecom Phone Project
This project will replace the phone system that serves Chaco Culture National Historical Park (CHCU). This Statement of Work, issued by the National Park Service, is for the removal of existing and installation of a new telephone system which includes phones, associated hardware, software, programming, and maintenance support. This scope of work describes the minimum level of performance required by the National Park Service. Alternate designs and or equipment minimum required standards are not accepted unless agreed upon. All equipment must be new and unused as well as Trade Agreement Act (TAA) compliant (limits allowed countries of origin). All technicians performing the work must be certified by Avaya. *Connecting non-government devices to the government data network is strictly prohibited.
Description of Work
Install most current Windows-based Avaya IP Office at Chaco Culture National Historical Park.
This will also include:
| Equipment |
| Quantity |
| Avaya IP Office |
| 1 |
| Avaya desk phone (J159) |
| 31 |
| Avaya conference phone (B179) |
| 1 |
| Embedded Voicemail + Essential Ed. Lic |
| 1 |
| Uninterrupted Power Supply 1500VA |
| 1 |
-Details are in the Requirements and Specification section 1.0
Period of Performance Finish no later than 90 days after award.
Site Survey Date TBD by Contracting Officer. Attendance is not required to submit a bid but is recommended.
1.0 Requirements and Specification
1.1 Locations and Details
Chaco Culture National Historical Park (CHCU) 1808 County Road 7950, PO box 220, Nageezi, NM 87037
This phone system and phones serve the following buildings on existing analog trunks with plans for PRI service in the near future:
Headquarters:
· Headquarters building uses analog lines for fax and alarm systems. Comment by Cubbage, Edward H: Are there any lines that run to Fax, Alarms, or Credit Card Machines? Needs clarification and update Maintenance Building
· Maintenance buildings uses analog lines for fax and alarm systems. Comment by Cubbage, Edward H: Are there any lines that run to Fax, Alarms, or Credit Card Machines? Needs clarification and update
Work details
· Install a new Avaya VoIP Telecom System with associated hardware and software for the voice network at CHCU.
· IP Office equipment will fit in provided 19” equipment racks or mounted in the same location as the replaced phone system. Comment by Cubbage, Edward H: Verify equipment rack and room available.
· Ensure proper grounding based on manufacturer specifications.
· The system must be IPV6 compliant or have the capability to become compliant in the future based on manufacturer plans, specifications, business roadmaps, etc.
· This system must have the latest version of software and all devices must be compatible with the proposed Avaya IP Office.
· The system must support voice, caller ID, and fax.
· Allow voice to use one vLAN and data on another vLAN. The IP Offices shall have at least 2 Network Interface Cards.
· The POP/demarcation point is located in the Headquarters Bldg. Comment by Cubbage, Edward H: Verify demarcation point. The building where the phone lines come into the building. Typically the same room as the server but must confirm.
· Aruba switches will be configured by NPS WAN Manager.
· The VoIP Telephone switch's IP address and subnet mask is to be determined, one for voice and the other for the park’s 10-dot data range.
· Vendor will work with NPS IT for any Aruba data switch programing (Contact WAN Manager and Telecom Manager at the Regional Office).
· VoIP phone sets will use dynamic IP assignment from the respective phone system. IP ranges will be provided by the government. System must have static IP addresses.
· All licenses must reside on the telecom switch.
· System must have the capability for remote system maintenance using a secure meeting and no direct access. No contractor IT equipment can be attached to the Government network.
· Remove all old phone system and components and neatly pack for proper electronics disposal by CHCU staff.
· The vendor must provide all settings with complete / correct syntax needed to route the VoIP traffic between all the sites using the Enterprise Switch Network (ESN). All sets regardless of data connection must function as designed. All features listed must be active and fully operational before project close out.
· Telephone sets will act as a network switch. Phone sets connect to the wall Ethernet port and the computer will connect to the phone.
· Connect phone systems to relevant circuits.
· Coordinate with the local exchange carrier to ensure all subscriber lines are functional as well as users having caller ID (if no cost) and E911. Must test and verify.
· Test and verify functionality of existing Private Business Lines (2) for alarm systems. Comment by Cubbage, Edward H: Verify lines that will be routed outside of phone system
· Provide and install all desk phones and conference phones plus voicemail in the specific locations determined by CHCU Staff. Contractor to provide patch cable with each phone (See NPS Structured Cable Plant Standard document).
· Replace current auto attendants at each site with new auto attendants (per site), program the auto-attendants, and provide training to CHCU administrators on how to change / program auto attendant.
· Enable (3 or 4) digit extension dialing on all internal VoIP sets at CHCU. Comment by Cubbage, Edward H: Confirm 3 or 4 digit internal dialing
· Program all extensions into the system and assign to users as determined by CHCU. Data will be provided to awardee.
· Test all phones to ensure operability, includes but not limited to; out dialing, voicemail access, call forwarding, test that calls to the primary number at each site, followed by entering an extension number, rings to the appropriate extension and office.
· Resolve potential voice quality issues such as echo, static, etc.
· Vendor is responsible for cleaning the work area at the end of each day and after the project.
· At the completion of the project the vendor is responsible for restoring all walls, floors, and other surfaces to the condition they were in prior to the commencement of work activity.
· Produce and provide as-built logical diagram for the voice network.
· Provide on-site, instructor lead, user overview training about basic set operation. Training will be conducted in a room to be provided by the government. Vendor must perform 20 - 30 minute long, user training sessions with up to (10) participants in each session. The training must include hands on use time for the users. The users should be taught how to use the features associated with the set and system. A visual aid or online tutorial does not substitute for instructor led training.
· Provide in-person, on-site, instructor led, in-depth administrator training in a room to be provided by the government. Vendor must perform (1) 1 hour long or as needed, in-depth system administrator training sessions with up to (3) attendees. This session must cover everything covered in the user training in addition to how to perform all system administration functions. A visual aid or online tutorial does not substitute for instructor led training.
· One-year Warranty on the installation for all equipment and all contractor performed work.
· One-year phone service and support; Next Business Day (NBD) per hour on-site charge, site trip charge, same day phone support charge; this would be to support the CHCU system.
1.1.1 Option Items- Yearly Maintenance
Option for 1 + 4-year maintenance agreement if exercised, cost broken down by each year to include on-site and remote repair help with NBD parts with Avaya Software upgrades. Does not include moves, adds and changes (MAC’s) or trouble caused by Network Provider.
1.2 Applicable Standards and Regulations
The Contractor shall conform to and be compliant with all applicable Federal Communications Commission (FCC) rules and regulations, local construction codes, and established industry standards. The Contractor shall also be compliant with NPS Structured Cable Plant Standard, April 22, 2021. The standards shall be applied during the engineering, fabrication, assembly, wiring, installation, testing, operation, maintenance, and management of the system(s) or service(s). If a conflict arises between standards, the contractor shall submit written requests for clarification citing the specific particulars to the Contracting Officer. The Contracting Officer will respond with written direction.
1.3 Site Access
· Contractor will coordinate with CHCU staff on all access to buildings and offices.
· The contractor shall restore walls, ceilings, and floors if they become damaged by contractor or sub-contractor employees. The restoration must bring the worksite to the appearance and condition that existed prior to the work being performed.
· The contractor is also responsible for cleanup, removal, and disposal of any debris associated with their installation of equipment and restoration of the building if damaged.
1.4 Deliverables
Inspection and Acceptance: All equipment must be new and have original warranty. In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected by an onsite inspector and reported to COR and CO.
1.5 Contract Type
This is a firm fixed price contract.
1.6 Service Interruptions
All service interruptions must be coordinated with CHCU staff approved by COR and the time-of-service interruption must be as short as possible. The NPS shall be notified as far in advance as possible of any scheduled interruptions by the contractor, but no less than 24 hours prior to the planned interruption. The contractor shall inform the government as soon as it is known that there may be an occurrence, which may result in an interruption of service.
1.7 Invoices
Invoices must show item detail and work order references. Invoices without correct work order reference or inadequate line-item detail will be returned as improper invoices.
1.8 Points of Contact
NOTE: The contractor shall immediately bring problems or potential problems affecting performance to the attention of the Contracting Officer, COR, and Project Manager. Problems affecting a particular action should be resolved prior to starting the specific task. Verbal reports must be followed up with written reports when directed by the COR, or Contracting Officer
Onsite (CHCU) Matilda Arviso, Administrative Officer Matilda_Arviso@nps.gov
IT Specialist William Opdyke, IT Specialist william_opdyke@nps.gov
Contracting Officer’s Representative (COR)
TBD
NPS Contracting Officer Sam Hyslop samuel_hyslop@nps.gov 970-880-4482
Administrative Section
2.0 Special terms and conditions
2.1 Security
The work itself is unclassified. However, work on this contract is in government facilities and involves data network / telecom equipment. Therefore, the government retains the right to request removal of contractor personnel, regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interests of the government. The reason for removal will be fully documented in writing by the Contracting Officer. When and if such removal occurs, the contractor will, within 5 working days, assign qualified personnel to any vacancy(ies) thus created. The government also retains the right to require an escort of contractor employees within sensitive / classified areas if the government deems it is required. The contractor will be notified in writing in the event this is required.
2.2 Key Personnel
The contractor shall identify key personnel in the technical proposal regardless of the type of task. It is required that personnel certified by the manufacturer perform the work, and copies of their certifications must be submitted to the government with the vendor proposal. Key personnel may not be added nor removed from the task without express approval of the Contracting Officer.
2.3 Payment Procedures & Status Report
All invoicing will be done per procedures to be determined by the Contracting Officer at the time of award.
2.4 Government Furnished Items
- The government will provide the following:
- The existing physical space needed and structures.
- Information needed to perform the work to include but not limited to extension ranges, IP addresses, etc.
Contractor Furnished Items
- Everything other than aforementioned government furnished items.