Long Lake Dike "A" Rehab at Long Lake NWR
Solicitation number
140F0122R0078
Issued by

About this file

This document outlines submittal requirements for the rehabilitation of Dike "A" at Long Lake National Wildlife Refuge. The project includes site clearing, rehabilitation of approximately 1,900 linear feet of dike, installation of riprap with geotextile along the lakeside slope of the dike, and reseeding of the dike crest with a seed mixture designated by the Refuge Manager.

The contractor must provide various submittals by specified deadlines to the Contracting Officer and Contracting Officer's Representative, including a schedule of values, subcontractor list, construction schedule and updates, testing reports, permits, reseeding plans, and as-built surveys. Digital photographs must be taken for preconstruction conditions and periodically during construction. Testing is required for imported soils, rock, and filter fabric prior to delivery. A Stormwater Pollution Prevention Plan must also be submitted prior to mobilization.

View the file

Other files

File Type Posted
Sol_140F0122R0078_Amd_0001.pdf PDF
B03_-_DOL_Wage_Determination.pdf PDF
A04_-_Bid_Schedule.pdf PDF
A04_-_Drawings.pdf PDF
Sol_140F0122R0078.pdf PDF
A04_-_Specifications.pdf PDF
PP_Questionaire.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME: REHABILITATE "A" DIKE ENGR. PROJECT NO.: 21-041

LOCATION: LONG LAKE NWR CONTRACT NO.:

CONTRACTOR:

Spec.

Section Number

Spec.

Paragraph

No.

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Delivery Schedule

Contractor's Submittal Number

Date Submitted

Action Taken

Date Resubmitted

Action Taken Comments

012900 1.3.C Schedule of Values to CO/COR ‐ Initial Not later than 30 days prior to initial Pay application

012900 1.3.D Schedule of Values to CO/COR ‐ Final Pay App After completing all closeout actions 013100 1.3.A Subcontractor List 14 calendar days after contract award 013100 1.6.A.2. Update 3‐Week Look‐Ahead Schedule Prior to each Project Progress Meeting 01 32 00 1.3.A Initial Construction Schedule 14 calendar days after contract award 01 32 00 1.3.B Construction Schedule Updates Submit with pay applications

013233 1.2 Digital Photographs 3.1.D Pre‐construction condition photos, 013233 3.1.E 3.1.E Periodic ‐ weekly on‐site 013233 3.1.F 3.1.F Final completion 013300 1.3.A Submittal Schedule 14 calendar days after contract award 014000 1.4 Testing Agency Qualifications Prior to Site Mobilization 014000 1.5.A Test and Inspection Reports Within one week of test completion 014100 1.3.A Project permits Prior to Site Mobilization

014500 1.5.A All failing field moisture content and compaction testing Within 24 hours of testing

014500 1.5.B Summary of all materials testing Weekly 015000 1.3 Erosion and Sedimentation Control Plan Prior to Site Mobilization

017400 1.3 Reseeding Prior to Ordering Mix, minimum of 14 days prior to start of reseeding

017700 1.3 Closeout Submittals Prior to final completion 022100 1.5.B Surveyor Qualifications 14 calendar days prior to survey work

022100 1.5.C Record Survey Prior to final completion

310500 1.5.A Imported Soil and Rock ‐ each material, each source 14 calendar days prior to delivery

310500 1.5.B Native Soil 14 calendar days prior to delivery

310500 1.5.C Filter Fabric 14 calendar days prior to delivery

312500 1.2 SWPPP Prior to mobilization, to include approved ND NPDES Construction Stormwater Permit See also 011100 para 1.4.D

PROJECT SUBMITTAL LIST

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.