This document includes a bidding schedule and description for a federal contract opportunity to rehabilitate Dike A at Long Lake National Wildlife Refuge. The bidding schedule outlines line items for site preparation, erosion and sedimentation control, excavation, embankment fill, imported riprap, placement of riprap and on-site materials, riprap bedding, filter fabric, reclamation, and a total price. Bidders are required to furnish all labor, materials, and equipment to return the dike crest and lakeside slope to original conditions, install riprap, bedding and filter fabric along the lakeside slope, and reseed the dike crest in accordance with provided drawings and specifications. The related federal contract opportunity posted by the Department of the Interior Fish and Wildlife Service seeks rehabilitation of Dike A, including clearing and rehabilitating approximately 1,900 linear feet of dike, installing riprap with geotextile along the lakeside slope, and reseeding the dike crest with a designated seed mixture.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140F0122R0078_Amd_0001.pdf | ||
| B03_-_DOL_Wage_Determination.pdf | ||
| A04_-_Drawings.pdf | ||
| Sol_140F0122R0078.pdf | ||
| A04_-_Specifications.pdf | ||
| PP_Questionaire.doc | DOC document | |
| A04_-_Submittals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE
REHAB A DIKE 21-041
LONG LAKE NWR
MOFFITT, BURLEIGH COUNTY, NORTH DAKOTA
PROJECT DESCRIPTION:
2 Site Prepartion $
3 Erosion and Sedimentation Control $
4 Excavation $
5 Embankment Fill $
6 Import Riprap $
7 Place Riprap (Imported and On-Site) $
8 Riprap Bedding $
9 Filter Fabric $
10 Reclamation $
TOTAL ALL LINES $
Furnish all labor, materials, and equipment to return dike crest and lake-side slope to original conditions, install riprap, bedding and filter fabric along lakeside slope of dike, and reseed dike crest. Complete all work in accordance with the attached drawings and specifications.
Mobilization, Demobilization, Bonds, Testing, Permits