A04_Statement_of_Work_(SOW)_0044043062_rev1.pdf
PDF 67 KB Posted
- Attached to
- TX-CADDO LAKE NWR-CLASS ROOM ROOF REPAIR
- Solicitation number
- 140FC126Q0040
About this file
This is a Statement of Work (SOW) for roof repair and replacement services at Caddo Lake National Wildlife Refuge in Karnack, Texas.
The project involves removal of worn shingles and repair of any existing roof damage at the Caddo Lake NWR classroom facility located at 15600 Highway 134, Karnack, TX 75661. The contractor, Right-Kut (with 63 years of construction experience), must complete the following scope of work: remove one roof and haul debris to a legal landfill; install synthetic felt and drip edge flashing around the roof perimeter; install two low-profile vents and one lead flashing vent; install 30-year architectural shingles on the building; and maintain jobsite cleanliness using magnetic rollers for debris collection. Work shall be performed during normal duty hours Monday through Friday, 8:00 a.m. to 4:30 p.m., with emergency contact information provided by the contractor. Non-duty hours include weeknights, weekends, and specified federal holidays. The technical coordinators for the project are Erik Duerkop, Refuge Manager, and Dan Walker, Administrative Technician, both located at the Caddo Lake NWR facility. The project timeline indicates completion is needed as soon as possible (ASAP).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC126Q0040_Amd_0002.pdf | ||
| B12_Q_A_0002.pdf | ||
| A04_Statement_of_Work_(SOW)rev-1_9-10-26_0002.pdf | ||
| Sol_140FC126Q0040_Amd_0001.pdf | ||
| B03_General_Decision.pdf | ||
| Sol_140FC126Q0040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. General:
1.1 Describes the project in general terms. (Caddo Lake NWR 15600 Hwy 134 Karnack, TX 75661 roof repair), and (Caddo Lake NWR Class room).
1.2 Purpose/End Application: Remove worn out shingels, and replace with new shingles.
Repair any damage to existing roof.
1.3 Contractor Qualifications: Right-Kut has 63 years of experience in the contruction business.
1.4 Other: Include, a relevant statutory authority, regulations, and/or references, pertinent background materials, or other relevant info. For extended information, reference an attachment or digital reference is recommended.
2. Place of Performance and Period of Performance (Caddo Lake NWR Class room ASAP) the project is being completed.
2.1 Caddo Lake NWR 15600 Hwy 134, Karnack, TX 75661.
2.2 Normal duty hours Monday through Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.3 Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 To remove 1 roof and haul to legal landfill.
To install synthetic felt and drip edge flashing around perimeter of roof.
To install 2 low profile vents and 1 lead flashing vent.
To install 30yr. architectural shingles on building. To keep job site clean at all times and roll with magnets.
Technical Coordinator:
Erik Duerkop, Refuge Manager 15600 Hwy 134 Karnack TX. 75661 (903) 213-
Dan Walker, Admin. Tech. 15600 Hwy 134, Karnack, TX 75661 (903) 679-9143
File details come from the government source that posted it. Updated .