This document is a Statement of Work (SOW) for the construction of a new sports complex at the Pueblo Pintado Community School in Pueblo Pintado, New Mexico. The project requires the design and construction of a football/track field with artificial turf, six-lane track, utility building, press box, and bleacher seating for 400. The work includes site development, landscaping, and utilities.
The SOW specifies that the contractor must be licensed in New Mexico and certified by the American Sports Builders Association as a Track and Field Builder. Site visits during the bidding phase are strongly encouraged. The 180-calendar day period of performance begins upon notice to proceed. The contractor must comply with all applicable codes, guidelines, and regulations, including LEED Silver certification, NMAA rules, and ADA/ABA accessibility requirements. Deliverables include design drawings, specifications, and as-built documentation. The government will provide an archaeological/historical clearance and locate main utility lines. The contractor is responsible for Navajo Nation and New Mexico taxes, temporary utilities, and following COVID protocols at the site.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for Pueblo Pintado Community
School
1.0 Location
The project is located at the Pueblo Pintado Community School, Pueblo Pintado, NM. The school is located off Navajo Route N-9, 1 mile east of the Pueblo Pintado Community Chapter House.
2.0 Background
Pueblo Pintado Community School is a Bureau operated school that serves Kindergarten (K) through 8th grade with residential dormitories. The administration has requested a new sports complex with a football/track field, new utility building, new press box, bleacher seating on both sides of the field with a total capacity for 400. The project includes associated site development to include minimum arid land landscaping and utilities. The sports complex shall be fully compliant with Americans with Disabilities Act/Architectural Barriers Act Guidelines
(ADAABAG).
The sports complex shall provide the Pueblo Pintado Community School students and staff with an outdoor sports facility that is safe, accessible, aesthetically pleasing and provides an additional outdoor space for sports and learning activities.
3.0 Offeror Requirements
3.1 Offerors shall be the Prime Contractors licensed by the State of New Mexico Construction Industries Division and certified as Field and Track Builders by the American Sports Builders Association (See for more details: sportsbuilders.org). Provide a copy of Contractor’s License and certification by the American Sports Builders Association when submitting a proposal.
3.2 Offerors are strongly encouraged to conduct a site visit during the bidding phase at no charge to the Government via advanced arrangements with Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency.
4.0 Scope of Work
4.1 The contractor will provide all labor, tools, materials, equipment, transportation, services and other incidentals necessary for the design and construction of a new outdoor sports complex for K- 8th grades, comprised of a football/track field with a six (6) lane track, new utility building, new press box, bleacher seating on both sides of the field with a total capacity for 400. The project includes associated site development to include minimum arid land landscaping and utilities.
4.2 The contractor shall be responsible for the professional quality, technical accuracy, timely completion and restoration of the area.
4.3 Football/Track Field Requirements
Designed for K-8th Grades Provide a new outdoor multi-use football field with artificial turf. Proposed location is north of the existing school (See A06 Map). The School Principal shall approve location of the complex and layout.
Provide a 6-lane track with a polyurethane surface around the football field.
Provide sub-base with proper drainage for the new football/track field and grounds Provide scoreboard on the southeast end of the field Utilities are not permitted to pass through, over or under track area. This includes water, sanitary sewer, electrical, gas, communications cables, etc.
Option for stadium lights, shall be considered after award.
4.4 Bleacher Requirements
Provide bleachers to seat a total of 400. Bleachers for 200 will be provided on both sides of the field.
Provide ADA accessible bleachers Provide ADA accessible surface from parking to the bleachers Provide ADA accessible surface from sidewalks to the bleachers.
Provide ADA accessible parking Provide ADA accessible surface from parking to the bleachers Provide access and egress, per code requirements, to the football/track field area to accommodate safe access and evacuation of all occupants. This shall require an upgrade of the two existing access/egress points of entry.
4.5 Press Box Requirements
Provide an enclosed Press Box structure on between the bleachers (location shall be approved by the School Principal.
Provide public address system inside the new Press Box.
Provide electrical supply for lighting and public address system in the new Press Box.
4.6 Utility Building Requirements
Provide a 20ft X 40ft utility building for storage of sports equipment.
4.7 Site and Landscaping Requirements
Field and site lighting, Note: Will be determined afterward.
Public address system Provide utilities to new the sports complex (utilities include wastewater(sewer), water distribution system for drinking and firefighting, three phase electrical distribution system, IT access. Note: Extent of utility will be determined after award.
New fencing and existing fence enhancement.
Upgrade the existing vehicle access to the sports complex with new asphalt paved road and provide a new ADA parking.
Minimum arid land landscaping (xeriscaping) o Surfaces adjacent to track, bleachers, walkway, stairways, ramps and upgraded embankment shall be landscaped to control erosion and drainage and for ease of maintenance.
4.8 Color selections, school logo design and layout shall be approved by the School Principal.
4.9 School Principal shall approve the final design prior to submittal to Barbara Hanson, COR, Facility Manager, New Mexico Navajo Central Agency.
sanitary sewer, electrical, gas, communications cables, etc.
Option for stadium lights, shall be considered after award.
5.0 Design Compliance
5.1 The sports complex shall be constructed by a Contractor that is certified as Track and Field Builders by the American Sports Builders Association.
5.2 After contract award to the successful Contractor, a site visit and meeting shall be held with Bureau of Indian Education (BIE) staff to review/discuss the contract work requirements. The licensed or professional architects and engineers preparing the drawings and specifications (A-E firm) shall gather all technical data determined necessary for providing a complete design.
5.3 The contractor shall provide comprehensive design-build construction documents. The design-build contractor shall use only licensed or registered professional architects and engineers to prepare the drawings and specifications for the project. The drawings and specifications shall bear the registration stamp or seal of the registered professional responsible for their preparation.
5.4 Pueblo Pintado Community School is a LEED Silver certified facility. The sustainable objective for this project shall maintain the LEED Silver certification.
5.5 Designed for K-8th Grades
5.6 The Football field with six (6) lane track shall be compliant with the New Mexico Activities Association (NMAA) rules and regulations.
5.7 Design services shall be provided in compliance with the BIA School Facilities Design Handbook and Space Templates, March 30, 2007.
5.8 The construction documents shall comply with current laws, codes, and guidelines contained in the “Safety, Health, and Accessibility Guidelines for Architects, Engineers, and Design Firms”, Indian Affairs Division of Safety and Risk Management, dated May 2020.
5.9. The NFPA 5000, Building Construction and Safety Code applies to this project.
5.10 Fully compliant with Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADAABAG).
5.11 IAM, Chapter 1.5.D.7 and Chapter 2.5.E.7
5.12 BIA Safety and Health Handbook, Topic 26.9i
6.0 Deliverables and Submittals
6.1 Design drawings and specifications shall be submitted to the Barbara Hanson, COR for review and approval by the School Principal.
6.2 After approval by the School Principal, design drawings and specifications shall be submitted to Barbara Hanson for submission to the BIA Division of Safety and Risk Management (DSRM) for review and approval.
6.3 DSRM approved Architectural and Engineering construction drawings shall be used to construct the new sports complex. All proposed designs and drawings must be reviewed and approved prior to ordering any materials and installation.
6.4 Five (5) sets of the STAMPED design documents, full size drawings and specifications, shall be submitted at the 100% completion for review by the school, New Mexico Navajo Central Agency, and BIA DSRM.
6.5 Provide final as-built drawings and specifications in AutoCAD, latest release software, and submitted on electronic storage. Provide final operation manuals, operating instructions, and other closeout documents.
7.0. Government Furnished Property
7.1 An updated Archeological and Historical Clearance with a CATX will be provided by Barbara Hanson, New Mexico Navajo Central Agency.
7.2 BIA will mark the locations of the main water line and valves to isolate the system during construction.
7.3 The Contractor shall be responsible to contact, schedule and pay for blue staking services for natural gas, electrical, telephone and other utilities not shown on the BIA proposed route map.
In the event a utility line is damaged by Contractor during the construction period, the Contractor shall immediately repair or replace the damaged utility line at no cost to the Government.
8.0. Pre- Construction Submittals
8.1 The Contractor shall submit a Health and Safety plan in accordance with 29 CFR 1910.120 that is protective of workers and the public.
9.0. Work Schedule
9.1 The work shall be performed on Monday through Friday between the hours of 8:00 AM and 4:30 PM local time. Alternate time schedule shall be preapproved by the Contracting Officer.
10.0 Performance Time
10.1 Period of Performance shall be one-hundred eight (180) calendar days from Notice to Proceed.
10.2. The Contractor shall prepare and submit a schedule which shows the start date, location and dates necessary to complete the work in accordance with performance time allowed under the contract.
11.0 Special Requirements
11.1 Offerors are strongly encouraged to conduct a site visit during the bidding phase at no charge to the Government via advanced arrangements with Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency.
11.2 Navajo Nation and State of New Mexico Taxes
11.3 The Contractor is responsible and required to pay the Navajo Nation Business Activity Tax.
Contact the Office of the Navajo Tax Commission – Navajo Nation at 928-871-6681 or visit the website: www.tax.navajo-nsn.gov.
11.4 The contractor will also be required to pay State of New Mexico Gross Receipts Tax.
11.5 Contractor shall be licensed by the State of New Mexico Construction Industries Division and certified as Field and Track Builders by the American Sports Builders Association. Provide copy of Contractor’s License and certification by the American Sports Builders Association to the Contracting Officer.
11.6 Contractor’s Work Coordination
Contractor Superintendent shall perform daily sign- in and sign – out at the Pueblo Pintado Community School front office in Building No. 1729.
11.7 Temporary Utilities.
Contractor shall arrange with local utility companies for temporary connections and payment arrangements.
11.8 The Contractor shall comply with current COVID check guidelines at the school location (COVID symptoms checks, mask required and social distancing)
11.9 Any unsafe work practices shall be reported to Mr. Harrison Nez, Agency Safety Officer (505)786-6191 for immediate reconciliation.
12.0 Payment and Closeout
12.1 Completed work shall be approved and signed off by Barbara Hanson, Facility (COR) after the following are completed:
Final inspection performed by Principal, School Maintenance Worker and Contractor Training of local school staff designated by the School Principal.
Final inspection by the Division of Safety and Risk Management (DSRM) Warranty and any operating manuals are provided to Barbara Hanson.
12.2 The final invoice shall be submitted in accordance with the contract and certified completion of the project.
13.0 Technical Consultation and Coordination
Contact Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency, and Contracting Officer’s Representative (COR) at 505-786-6168 for questions or discussions regarding technical matters relative to the services required. The Contractor shall notify Barbara Hanson to schedule site visits. Ms. Hanson shall ensure that a School Maintenance Worker is present to accompany the contractor.
PREPARED BY BARBARA HANSON, FACILITY MANAGER, NMNCA