RFI_Questions_and_Answers_Log_CNES7_22_24_July_24_2024_0003.xlsx

XLSX spreadsheet 202 KB Posted

Attached to
Pueblo Pintado Community School - Sports Complex
Solicitation number
140A2324R0074
Issued by

About this file

This document is a Questions and Answers log for Task Order Request for Proposal # 140A2323R0080 for a Sports Complex project at the Pueblo Pintado Community School.

The key details are:

  • The RFP is for the design and construction of a sports complex at the Pueblo Pintado Community School, including a football field, track and field events, utilities, fencing, parking, and a press box.
  • The contracting agency is the Department of the Interior, Bureau of Indian Affairs, Bureau of Indian Education.
  • Questions cover details such as the desired track and field events, sports equipment, colors, utilities, IT access, scoreboard, press box, fencing, parking, restrooms, geotechnical information, and the overall project timeline of 180 days.
  • Responses from the government provide clarification on the requirements, such as a black synthetic track, simple scoreboard, 6-foot fencing, no restrooms, and the intent to complete design and construction within the 180-day period.
  • An additional question was received from another contractor regarding excluding utilities from the bid schedule due to the undetermined final location of the sports complex.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Questions and Answers Log for Task Order Request for Proposal # 140A2323R0080 Sports Complex Project Pueblo Pintado Community School

NumberDate ReceivedContractorQuestionDate Sent to CORAnswerDate Answered
17/18/24Cherokee Nation Environmental Solutions, LLCWhat Track & Field events would the school like to consider in the design of this project? Long jump, pole vault, shot put, discus, high jump, javelin, etc.7/18/24running events, NOTE: See SOW24-Jul
27/18/24Cherokee Nation Environmental Solutions, LLCWhat sports equipment would the school like to consider in the design of this project? Combination soccer/football goals, standalone football and/or soccer goals, removable or permanent? Starting blocks? Other?7/18/24Just a football field for now, if it could work with a baseball field yes. SOW does not call for a baseball field.24-Jul
37/18/24Cherokee Nation Environmental Solutions, LLCAre there any logos or endzone letters to be considered in the base proposal? If so, what size?7/18/24It would be nice to have a logo or PPCS on end zones, but if it raises costs then no.24-Jul
47/18/24Cherokee Nation Environmental Solutions, LLCWhat color would you like the synthetic running track to be; Red or Black?7/18/24Black24-Jul
57/18/24Cherokee Nation Environmental Solutions, LLCAny synthetic turf field maintenance equipment required in the base proposal?7/18/24not sure what is needed to maintenance that. Not in the SOW24-Jul
67/18/24Cherokee Nation Environmental Solutions, LLCWhat are the expectations for installing new utilities as shown in section 4.7 in the statement of work? Are we to simply run new connection points for said utilities and stub out?7/18/24if that is possible and cheaper. Electrical Power for the new pressbox shall be provided will be provided24-Jul
77/18/24Cherokee Nation Environmental Solutions, LLCPlease expand on “IT Access” requirements and intended functionality?7/18/24Electrical power is requested for the press box24-Jul
87/18/24Cherokee Nation Environmental Solutions, LLCPlease expand on scoreboard capabilities. (video, camera, media). Are play clocks required on the scoreboard?7/18/24simple score board with clock24-Jul
97/18/24Cherokee Nation Environmental Solutions, LLCPlease expand on the press box size and interior scope. (utilities other than electrical in the pressbox?)7/18/24Size is 12'x7'24-Jul
107/18/24Cherokee Nation Environmental Solutions, LLCIs electrical desired in the utility building? (Lights, AC/Heater and/or Climate controlled)7/18/24Lighting only24-Jul
117/18/24Cherokee Nation Environmental Solutions, LLCDoes the Owner want the same color/material as existing school building?7/18/24no24-Jul
127/18/24Cherokee Nation Environmental Solutions, LLCWhat is the desired height of the fence? (4’, 6’ or 8’)7/18/24624-Jul
137/18/24Cherokee Nation Environmental Solutions, LLCDoes the Owner want privacy slats on the fencing?7/18/24no24-Jul
147/18/24Cherokee Nation Environmental Solutions, LLCIs fencing going to be perimetral or around the track?7/18/24Fencing around the sports complex, to ensure when not in use24-Jul
157/18/24Cherokee Nation Environmental Solutions, LLCHow many ADA parking spaces are wanted?7/18/24See SOW for the design guidelines24-Jul
167/18/24Cherokee Nation Environmental Solutions, LLCHow many parking spaces are wanted?7/18/243024-Jul
177/18/24Cherokee Nation Environmental Solutions, LLCRefer to 4.7: indicates utilities to include “wastewater (sewer)”, please indicate if restroom facilities are expected.7/18/24No water or sewer only electrical, SOW does not call for restrooms24-Jul
187/18/24Cherokee Nation Environmental Solutions, LLCClarify firefighting requirements.7/18/24No water or equipment for fire fighting24-Jul
197/18/24Cherokee Nation Environmental Solutions, LLCCan the existing Geotechnical Report be provided?7/18/24Will be provided to the awarded contractor if available24-Jul
207/18/24Cherokee Nation Environmental Solutions, LLCThe BIA Design Guide is referenced in the SOW, please provide.7/18/24Will be provided to the awarded contractor24-Jul
217/18/24Cherokee Nation Environmental Solutions, LLCIs there a location on property that the contractor could use to stage the construction crew's RVs?7/18/24Staging area will be planned with the awarded contractor, and none available at this time24-Jul
227/18/24Cherokee Nation Environmental Solutions, LLCWill the contractor be required to performed a threatened and endangered species survey prior to the commencement of work activities?7/18/24See the BIA Design Handbook and Clearance Guidance24-Jul
237/18/24Cherokee Nation Environmental Solutions, LLCTo clarify, is a 80 or 100 yard football field desired?7/18/24See SOW for the design guidelines24-Jul
247/18/24Cherokee Nation Environmental Solutions, LLCPlease clarify what sports the field should be striped for, i.e. football, soccer, lacrosse, field hockey?7/18/24football and trackfeild24-Jul
257/18/24Cherokee Nation Environmental Solutions, LLCIs the intent to have a dedicated road into the track/field?7/18/24Yes, if the location of the complex is located on the west end of the school campus24-Jul
267/18/24Cherokee Nation Environmental Solutions, LLCThe SOW indicates a 180 day period of performance. Is the intent that the design and construction will be completed within the 180 days?7/18/24Yes, if no delays outside of weather24-Jul
277/18/24Cherokee Nation Environmental Solutions, LLCCan the CLINs be broken down into major features of work so the client can decide how they can be selective in order to get the most for their current budget?7/18/24Inquire with the Contractor Officer24-Jul
287/18/24Cherokee Nation Environmental Solutions, LLCCan extra soil be spread on the site in lieu of being hauled off site?7/18/24Follow the Design Guidelines and the certified Field and Track Builders Association expert on the Team.24-Jul
297/18/24Cherokee Nation Environmental Solutions, LLCLEED requirements are mentioned in the SOW, what LEED requirements would like to be met for the sports complex?7/18/24See LEED guidelines to see what requirements are inline with maintain the LEED certification. Consult with your LEED certified expert24-Jul
307/18/24Cherokee Nation Environmental Solutions, LLCIs the area considered to be archeologically sensitive and is a archeological monitor required during construction?7/18/24Per SOW arch clearance is required24-Jul
317/18/24Cherokee Nation Environmental Solutions, LLCIf the site needs to be balanced and additional dirt is required, does the school have a borrow site nearby where dirt can be hauled?7/18/24None identified at this time.24-Jul
327/18/24Cherokee Nation Environmental Solutions, LLCAre chutes required for the track? If so, single, or double?7/18/24Consult with certified Field and Track Builders Association expert on the Team.24-Jul
NumberDate ReceivedContractorQuestionDate Sent to CORAnswerDate Answered
17/26/24Tohi-Efficio JVWith the final location of the sports complex being undetermined, it is impossible to calculate the distances and extent of utilities which will be required (per the solicitation). To finalize these prices, the contractor will need to coordinate with local Electric, Water, Sewer, and internet providers which service this area. As such, can the utilities be excluded from the bid schedule, as their price will be determined by the projects final location and accepted design?7/26/24Electricity only; No water or sewer7/29/24

image1.png