This Statement of Work (SOW) details an asphalt paving installation project for the National Park Service at 5696 Foresta Drive in El Portal, California. The project involves installing approximately 1,000 linear feet of new asphalt pavement, with site preparation and base aggregate placement scheduled for the final week of September or first week of October 2025. The contractor is required to complete asphalt paving within two days of aggregate completion, adhering to Caltrans Revised Standard Specifications and Section 32 12 00 Flexible Paving requirements.

The project is associated with Solicitation Number 140FC225Q0036 under the Department of the Interior Fish and Wildlife Service. The period of performance is from September 29 to October 10, 2025, with the goal of creating a durable roadway surface to support year-round access and maintenance operations. The primary point of contact is Darren Stover, who can be reached at Darren_stover@fws.gov or 302-222-7598 for additional project details.

View the file

Other files

File Type Posted
Sol_140FC225Q0036_Amd_0002.pdf PDF
Sol_140FC225Q0036_Amd_0001.pdf PDF
question_and_answer_0001.docx DOCX document
A06_Aggregate_Surfacing.pdf PDF
Sol_140FC225Q0036.pdf PDF
B03_WD.pdf PDF
A06_Flexible_Paving.pdf PDF
A06_BASE_COURSES.pdf PDF
A06_Drawings.pdf PDF
A06_Roadway_Cut_Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Description: Asphalt Paving Installation – 5696 Foresta Drive, El Portal, CA In September 2025, the National Park Service will support operations to install approximately 1,000 linear feet of new asphalt pavement along Foresta Drive in El Portal, California (ZIP 95318). The scope of work includes site preparation and installation of base aggregate by others during the final week of September and/or first week of October. The contractor will mobilize promptly after base placement to install the asphalt pavement within two (2) days of aggregate completion to minimize the risk of weather-related erosion or rework due to early October rainfall. Asphalt paving shall conform to the specifications outlined in Section 32 12 00 Flexible Paving, including compaction and placement requirements per FP-14 and Caltrans Revised Standard Specifications. The finished work will provide a durable roadway surface that supports year-round access and maintenance operations.

Period of Performance: September 29 – October 10, 2025 Project Site: 5696 Foresta Drive, El Portal, CA Project POC: Darren Stover, Darren_stover@fws.gov , 302-222-7598