This document is a set of specifications from the Bureau of Land Management's Elko District Office for a material/truck hauling contract. The agency requires approximately 420 tons (300 cubic yards) of oversized recycled concrete, 8-12 inches in size with no iron, to be delivered and dumped at specified locations to stabilize eroded culverts on Rock Springs Road. The contractor must provide trucks and drivers capable of offloading using dump trucks or side dump semi-trailers.

Delivery specifications include a two-week delivery window after contract award, with a final delivery deadline of September 30, 2025. Two specific map coordinates are provided for material dumping: a primary location at 41° 43' 29327" N 114° 22' 15.61" W and a secondary location at 41° 35' 11.40" N 114° 26' 8.05" W. Payment terms are Net 30, meaning the contractor will be compensated within 30 days of invoice submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management – Elko District Office

Elko District/Rock Springs Road Material/Truck Hauling Specifications

Introduction:

Elko District has need to purchase oversized recycled concrete to be delivered and dumped to stabilize badly eroded culverts on the Rock Springs Road. The contractor will provide the trucks/drivers, and the specific stone referenced below. The total amount of stone is 420 tons, and the contractor will deliver 14 days after award of contract.

Requirement:

1. Approximately 420 tons or 300 cubic yards of oversized concrete, 8-12 inched in size NO IRON delivered.

2. The vendor has to be able to offload, using dump truck, side dump semi-trailer, etc.

Delivery:

The vendor can contact COR when ready to deliver. Delivery shall take place within 2 weeks after contract awarded, but before September 30, 2025.

Stone will be delivered and dumped at the following map coordinates:

Primary location:

41° 43’ 29327” N 114° 22’ 15.61” W

In the event the primary location is unavailable, the product is to be delivered and dumped at the following map coordinates:

Secondary location:

41° 35’ 11.40” N 114° 26’ 8.05” W

Payment:

Payment will be made Net 30.