A04-_SOW_0001.pdf

PDF 113 KB Posted

Attached to
ROCK SPRINGS ROAD MATERIALS
Solicitation number
140L3925Q0079
Issued by

About this file

This document is a Request for Quote (RFQ) from the Bureau of Land Management's Elko District Office for rock material and truck hauling services. The requirement is to procure approximately 420 tons (300 cubic yards) of oversized recycled concrete, sized 8-12 inches, with no iron content, to be used for stabilizing eroded culverts on Rock Springs Road. The contractor must provide trucks and drivers capable of offloading the material using dump trucks or side dump semi-trailers.

Delivery is specified within 14 days after contract award, but no later than September 30, 2025, to either of two defined GPS coordinates (primary: 41° 43' 29327" N 114° 22' 15.61" W; secondary: 41° 35' 11.40" N 114° 26' 8.05" W). The vendor will be paid Net 30 terms upon successful delivery. The Contractor must coordinate delivery timing with the Contractor's Authorized Representative (COR) and ensure the stone meets the specified size and material requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management – Elko District Office

Elko District/Rock Springs Road Material/Truck Hauling Specifications

Introduction:

Elko District has need to purchase oversized recycled concrete to be delivered and dumped to stabilize badly eroded culverts on the Rock Springs Road. The contractor will provide the trucks/drivers, and the specific stone referenced below. The total amount of stone is 420 tons, and the contractor will deliver 14 days after award of contract, but by September 30,2025.

Requirement:

1. Approximately 420 tons or 300 cubic yards of oversized concrete, 8-12 inched in size NO IRON delivered.

2. The vendor has to be able to offload, using dump truck, side dump semi-trailer, etc.

Delivery:

The vendor can contact COR when ready to deliver. Delivery shall take place within 2 weeks after contract awarded, but by September 30, 2025.

Stone will be delivered and dumped at the following map coordinates:

Primary location:

41° 43’ 29327” N 114° 22’ 15.61” W

In the event the primary location is unavailable, the product is to be delivered and dumped at the following map coordinates:

Secondary location:

41° 35’ 11.40” N 114° 26’ 8.05” W

Payment:

Payment will be made Net 30.

File details come from the government source that posted it. Updated .