A04_-_SOW.pdf
PDF 5 MB Posted
- Attached to
- CHIR - REHAB QUARTERS 5 Federal contract opportunity
- Solicitation number
- 140P1525Q0014
About this file
This is a Statement of Work (SOW) for deferred maintenance and replacement of components at Quarters 5, a 1,500-square-foot housing unit within Chiricahua National Monument in Willcox, AZ. The project is managed by the National Park Service Intermountain Region.
The scope includes removal and replacement of lead-containing ceramic tile in two bathrooms; installation of a new 5-ton HVAC system with condensing unit, air handler, ductwork, line sets, electrical disconnect, thermostat and wiring; removal of existing bathtub/shower pans and replacement with 3-piece shower pans and fixtures; repair/replacement of cracked and failing drywall in house and abatement of moldy drywall in garage; repair/replacement of roof flashing around chimney; and two bid options - installation of a new wood burning stove with flue liner/chimney cap and replacement of manual garage door with an automatic opener. Detailed specifications are provided for the HVAC system (minimum SEER 16), shower installations, and other components. The contractor must follow EPA and Arizona regulations for lead/asbestos abatement and provide various submittals including safety plans, schedules, and warranty documentation. Supporting environmental testing reports identify asbestos in ductwork tape, flooring materials, roofing sealant and lead in various painted surfaces that will require proper handling during renovation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1525Q0014_Amd_0002.pdf | ||
| Sol_140P1525Q0014_Amd_0001.pdf | ||
| E30_-_Erickson_House_Site_Visit_Roster_-_344430_0001.pdf | ||
| B08_-_Master_Combined_Synopsis-Solicitation_140P1525Q0014.pdf | ||
| Sol_140P1525Q0014.pdf | ||
| B11_-_Site_visit_information_Rehab_Quaters_5_CHIR_140P1525Q0014.pdf | ||
| B03_-_DOL_Wage_Rates_AZ20240038.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHIRICAHUA NATIONAL MONUMENT
COCHISE COUNTY, AZ
SCOPE OF WORK
ADDRESSING DEFERED MAINTENANCE AND
REPLACEMENT OF SELECTIVE
COMPONENTS AT QUARTERS 5
PMIS 344430
NATIONAL PARK SERVICE
INTERMOUNTAIN REGION
Table of Contents
Contents 1 Project Overview
Location, Facilities, and Key Personnel
Project Scope
2 Summary of Requirements and Objectives
Definition of Contract Line Items
Base Bid Line Items
Bid Option Line Items
3 Codes and Standards
4 Approved Equivalents
5 Product and Material Specifications
Split Type Heat Pump Systems (5 ton) - Ducted
Ductwork and Accessories
Lead Abatement (Bathroom 1 and 2 Tile Removal)
Bathroom 1 and 2 remodel
Chimeny Roof Repair
Drywall Repair, Removal and Replacement
Garage Door Replacement (Bid Option)
Wood Burning Stove (Bid Option)
6 Additional Requirements
Project Schedule
Safety
Security
Quality Assurance
Travel
Progress Payments
Project Meetings
Substantial Completion and Final Inspection
7 Site Coordination
Existing Conditions and Coordination
Special Construction Conditions
Staging Areas
Work Zones
Protection of Public
Parking of Work Vehicles
Temporary Materials, Equipment and Services
Hot Work Permit
Smoking
Electricity
Telephone
Water
Sanitary Facilities
Hauling Restrictions
Waste Management
8 Submittals
9 Final deliverables
10 Appendix A: Erickson Photos
ENVIRONMENTAL INCORPORATED
ENVIRONMENTAL INCORPORATED
ENVIRONMENTAL INCORPORATED
11 Certificate of Training
Has completed the AHERA Course:
12 Certificate of Training
Has completed the AHERA Course:
french door
1 Project Overview
Location, Facilities, and Key Personnel
This project involves the 1,500-sf housing unit #5 within Chiricahua National Monument.
Housing unit #5 (Q5) is also referred to as the Erickson House and is located within Chiricahua National Monument (CHIR) at 9818 S. Pinery Canyon Road, Willcox, AZ 85643.
Points of contact:
SEAZ Facilities Manager: Sam Bell Email: sam_bell@nps.gov Office: (520) 824-3560 ext. 9303 Cell: (520) 274-0535
Contracting Officers Representative (COR): Ben Bledsoe Email: ben_bledsoe@nps.gov Office: (520) 824-3560 ext. 9403 Cell: (520) 503-8030
Contracting Officer: Donald Tremble Donald_Tremble@nps.gov
Project Scope
This Scope of Work (SOW) addresses multiple interior and exterior deficiencies at Q5 including the removal and replacement of lead-containing ceramic tile in two bathrooms;
removal of existing and installation of a new 5-ton heating; ventilation, and air-conditioning (HVAC) system to include condensing unit, air handler, ductwork, line sets, electrical disconnect, thermostat, and thermostat wiring; removal of existing bathtub and shower pan from two bathrooms and replacement with 3 piece shower pans and shower fixtures;
replacing/ repairing cracked and failing drywall in house and abatement of moldy drywall in garage; repair or replace roof jack/ flashing around chimney; removal of existing and installation of new wood burning stove and associated flue liner and chimney cap and replacement of existing and installation of new automatic garage door.
The Contractor shall be responsible for all necessary work to achieve required project outcomes, including labor, equipment, tools, personal protective equipment (PPE), coordination with Authorities Having Jurisdiction (AHJ), internal construction permits, incidental design, travel, and other related expenses.
2 Summary of Requirements and Objectives
Project requirements and required outcomes are described in this SOW and in Appendix A.
The Contractor is advised that project photos and mark-ups in Appendix A are indicative of current conditions only. The Contractor shall site verify all existing conditions prior to commencing work on site. Refer also to general notes provided on the project sketches.
Definition of Contract Line Items
1. Contractor proposal shall list each line item included in base bid including bid options.
Base Bid Line Items
1. Removal of Lead containing tile shower and vanity countertop in master bathroom and shower stall in secondary bathroom. Removal of existing bathtub and shower pan from two bathrooms and replacement with Fiberglass shower insert and floor pan. Installation of new solid surface countertop and sink. Install new fixtures for showers and sink.
Repair drywall and paint where required
2. Removal of existing and installation of new HVAC ductwork throughout entire structure (~90 linear feet). Existing ductwork tape contains asbestos. Hazardous material report can be found in Appendix A. See section 5 for product and material specifications regarding this bid item. Replacement of existing and installation of a new 5-ton heating, ventilation, and air-conditioning (HVAC) system to include condensing unit, air handler, line sets, electrical disconnect, and thermostat. See Appendix A. See sections 5 for product and material specifications regarding this bid item.
3. Repair of all drywall cracking throughout house. approximately 280sf of cracked and failing drywall in dining room and garage. Foundation settlement has resulted in the cracking and failure of dining room drywall. A roof leak in the garage has caused mold to grow on the drywall that encloses the water heater closet. Contractor shall remove and replace all cracked, broken, and failing drywall in-kind and finish with mud, tape, texture, and paint to match existing. See Appendix A. See section 5 for product and material specifications regarding this bid item.
4. Repair to chimney flashing to stop leaks into ceiling cavity. Contractor shall locate source of leak and make necessary repairs in accordance with industry standard to ensure roof is watertight. See Appendix A for existing conditions. See section 5 for product and material specifications and additional information regarding this bid item.
Bid Option Line Items
1. Replacement of existing and installation of new wood burning stove and associated flue and chimney cap. See Appendix A. See section 5 for product and material specifications regarding this bid item.
2. Replacement of existing and installation of new automatic garage door. Contractor shall remove existing garage door, door tracks, and all associated hardware and replace with an electric, remote controlled, automatic garage door. See Appendix A. See section 5 for product and material specifications regarding this bid item.
3 Codes and Standards
The Contractor is responsible for securing all needed permits and for ensuring compliance with all federal, state, and local codes and design standards, latest editions, including the following. If discrepancies are found between the SOW and codes or standards as referenced in this SOW, the codes or standards shall govern, unless noted otherwise.
A. International Building Code (IBC, International Code Council) (Most current edition)
B. International Mechanical Code (IMC, International Code Council) (Most current edition)
C. International Plumbing Code (IPC, International Code Council) (Most current edition)
D. National Electrical Code (NFPA 70) (Most current edition) E. National Fire Protection Association Codes (NFPA) F. American Society of Heating, Refrigerating, and Air-Conditioning Engineers
Standards (ASHRAE) G. Air-Conditioning, Heating, & Refrigeration Institute Standards (AHRI) H. Sheet Metal & Air Conditioning Contractors’ National Association Standards
(SMACNA)
I. National Environmental Balancing Bureau Standards (NEBB) J. National Electrical Equipment and Medical Imaging Manufacturers (NEMA) K. Occupational Safety and Health Administration (OSHA) L. National Air Duct Cleaners Association Standards (NADCA) M. US Department of Transportation Manual on Uniform Traffic Control Devices
(MUTCD)
4 Approved Equivalents
A. Contractor proposed equivalents shall be submitted for review during the solicitation period as Requests for Information (RFI). Proposed equivalents shall not be reviewed after the solicitation period.
5 Product and Material Specifications
Lead Abatement (Bathroom 1 and 2 Tile Removal)
A. General: Contractor shall remove and replace approximately 120-square feet of lead-containing ceramic tile, grout, and mastic, in two bathrooms and dispose of in accordance with state and federal regulations. Photos of existing conditions found in Appendix A,
1. Abatement and disposal: Follow EPA and Arizona regulations.
Bathroom 1 and 2 Remodel
A. Installation of shower stalls with fixtures: Follow manufacturers specifications.
3-Piece Shower Specifications
1. General Description The 3-piece shower system consists of a shower base and two vertical wall panels designed for residential or commercial bathroom installations. The unit is intended to provide an efficient, waterproof, and aesthetically pleasing solution for shower facilities.
2. Components
2.1 Shower Base and wall panel Material: High-quality acrylic or fiberglass, providing durability and resistance to cracking and fading.
Dimensions and Drain Location to match existing.
Slip-resistant surface for safety; textured or smooth finish.
Color White
Waterproofing Seamless design with interlocking edges for a watertight installation.
2.2 Accessories
Showerhead Standard or optional upgrades (e.g., handheld, rain shower).
Faucet and Controls Compatibility with standard plumbing fixtures, configurable for hot and cold-water supply.
Built-in shelves or corner caddies for soap and personal items.
Compliance and Standards Building Codes Compliant with local and national building codes for plumbing and safety.
Certification Products should meet standards such as ASTM, ANSI, or relevant industry certifications for quality and safety.
B. Installation of solid surface countertop and sink with fixtures: Follow manufacturers specifications.
Split Type Heat Pump Systems (5 ton) - Ducted
A. General: Split type heat pump systems comprising indoor air handling units, auxiliary electric resistance coils, evaporator coils, and outdoor condensing units with two stage compressors. Outdoor units shall be fully compatible with indoor units. Photos of existing equipment and conditions found in Appendix A.
B. Indoor Units
1. General: Indoor mounted, draw- thru, packaged air- handling unit that can be used with or without ductwork in a suspended horizontal configuration or free- standing vertical configuration. Unit shall be indoor component of a heat pump system. Unit shall consist of forward- curved belt or direct driven centrifugal fan(s), motor and drive assembly, prewired fan motor contactor, factory- installed refrigerant metering devices, bypass check valves, cooling coil, 2- in. disposable air filters, and condensate drain pans for vertical or horizontal configurations.
2. Chassis: Galvanized steel with flanged edges, removable panels for servicing, and insulation on back of panel.
3. Insulation: Faced, glass-fiber duct liner.
4. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins and thermal-expansion valve. Comply with ARI 206/110.
5. Auxiliary Electric Coil: Helical, nickel-chrome, resistance-wire heating elements; with refractory ceramic support bushings, automatic-reset thermal cutout, built-in magnetic contactors, manual-reset thermal cutout, airflow proving device, and one-time fuses in terminal box for overcurrent protection.
6. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.
7. Condensate Drain Pans:
a. Fabricated with slope in at least two planes to collect condensate from cooling coils (including coil piping connections, coil headers, and return bends), and to direct water toward drain connection.
1) Length: Extend drain pan downstream from leaving face to comply with ASHRAE 62.1-2016
2) Depth: A minimum of 2 inches deep.
b. Drain Connection: Located at lowest point of pan and sized to prevent overflow.
c. Minimum Connection Size: 3/4 inch.
8. Fan: Direct drive, centrifugal
a. Fan Motors:
1. Multitapped, multispeed with internal thermal protection and permanent lubrication.
9. Air Filtration Section:
a. General Requirements for Air Filtration Section:
1. Comply with NFPA 90A.
b. Filter-Holding Frames: Arranged for flat orientation, with access doors on front. Filters shall be removable from one side or lifted out from access plenum.
c. Extended-Surface, Disposable Panel Filters:
1. Factory-fabricated, dry, extended-surface type.
2. Thickness: 2 inches
3. MERV according to ASHRAE 52.2: 8
4. Media: Fibrous material formed into deep-V-shaped pleats and held by self-supporting wire grid.
5. Media-Grid Frame: Nonflammable cardboard
C. Air-cooled, Compressor-Condenser Components
1. Casing: Steel, finished with baked enamel, with removable panels for access to controls, weep holes for water drainage, and mounting holes in base.
Provide brass service valves, fittings, and gage ports on exterior of casing.
2. Compressor: Hermetically sealed with crankcase heater and mounted on vibration isolation device. Compressor motor shall have thermal- and current-sensitive overload devices, start capacitor, relay, and contactor.
a. Compressor Type: Scroll. Minimum 2 stage.
b. Refrigerant: 410 or newer A2L type based on price and availability.
c. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins and liquid sub cooler. Comply with ARI 206/110.
3. Fan: Aluminum-propeller type, directly connected to motor.
4. Motor: Permanently lubricated, with integral thermal-overload protection.
5. Low Ambient Kit: Permits operation down to 45 deg F.
6. Mounting Base: Polyethylene.
7. Electrical Characteristics
a. Volts: 208/230
b. Phase: 1
c. Hertz: 60
d. Disconnect: Provide new NEMA Type 3R knife blade type electrical disconnect for each outdoor condensing unit as noted in Appendix A.
Disconnects shall be located adjacent each unit (on walls where indicated) and shall be ABB, Eaton, Square D or Approved Equivalent.
8. Minimum SEER: 16 D. Unusual Service Conditions:
1. Ambient Temperature: 115F.
2. Altitude: Contractor shall coordinate.
E. Acceptable Manufacturers: Carrier Infinity 16, Trane XL18i or Approved Equivalent.
5.1.1 Thermostat
A. General: Thermostat/Controllers shall be fully compatible with all installed systems and shall be selected to achieve the sequences of operations described later in this SOW. Contractor shall provide all required components, sensors, accessories, wiring, interface modules, etc. as required for fully operational systems in accordance with this SOW. Provide one thermostat/controller for installed system. Photos of existing equipment and conditions found in Appendix A.
B. Key Characteristics: Fully programmable. Multi-stage capacity heating and cooling functionality. 7-day scheduler.
C. Acceptable Manufacturers: Carrier, Trane, Honeywell, or approved equivalent.
Ductwork and Accessories
A. General: Contractor shall replace all existing ductwork in accordance with the following specifications. Photos of existing equipment and conditions found in Appendix A.
1. Abatement and disposal: Follow EPA and Arizona regulations.
B. Rigid Ductwork: Provide metal ductwork construction, including all fittings and components that complies with SMACNA standards. Provide volume control dampers at all flexible ductwork connections. Provide fittings, branches, inlets, and outlets in such a manner that air turbulence is reduced to a minimum.
1. Galvanized Steel Ductwork: ASTM A653, A924 mill galvanized steel sheet,
1.25 oz per sq. ft. zinc coating on each side in conformance with coating designation G-90. Minimum steel rectangular duct gage shall be as follows:
a. Ducts through 12 in. wide: 24 Gage
b. Ducts 13 in. through 30 in. wide: 22 Gage.
C. Flexible Ductwork: Flexible Ductwork: Flexible duct shall be UL listed and shall maintain shape when installed. Sagging shall not exceed 1/2 in. per linear foot when installed horizontally. Insulated flex shall have a gray fire-retardant polyethylene outer jacket with an 8 oz. density, 1-1/3 in. thick fiberglass insulation blanket, factory wrapped. Fully support all flexible ductwork from existing structure.
D. Hangers and Support Installation and Spacing: Comply with SMACNA’s “HVAC Duct Construction Standards – Metal and Flexible,” Chapter 5, “Hangers and Supports.” Support ductwork from building structure, not services.
Drywall Repair, Removal and Replacement
A. General: Contractor shall repair approximately 200 square feet of existing drywall in the housing interior and remove and replace 80 square feet of existing drywall in the garage. The drywall appears to have mold growth due to a leak in previous water heater supply line. Photos of existing conditions found in Appendix A,
1. Repair of interior drywall: Contractor shall repair all cracked and damaged drywall, tape, and mud. Any new drywall, tape, and mud shall be installed in a workmanlike manner and primed, textured and painted to match existing interior finish.
2. Replacement of garage drywall: Contractor shall follow industry standard practices for removal of moldy drywall and replaced with new drywall.
Contractor shall install new drywall, tape, mud, primer, and paint to match dining room color and sheen. Texturing of new garage drywall is not required.
Chimney Roof Repair
A. General: Find leak around Chimney and repair
Garage Door Replacement (Bid Option)
A. General: Contractor shall remove existing garage door and replace with new electric powered garage door. Photos of existing conditions and equipment found in Appendix A,
1. Removal of existing equipment: Contractor shall remove and dispose of existing garage door panels, tracks, and associated hardware.
2. Installation: Contractor shall install new garage door in a workmanlike manner and in accordance with manufacturers specifications to ensure a weather and rodent-proof seal along all exterior seams.
3. Garage door specifications: New garage door shall be a track-type, steel frame, non-insulated, overhead style garage door and contain the following features:
a. electric powered opener/closer
b. remote controlled
c. ceiling mounted.
d. interior locking
e. bottom weather seal
f. automatic reversing safety sensor beams
B. Warranty: Contractor shall provide a minimum one-year warranty for garage door parts and installation.
Wood Burning Stove (Bid Option)
A. General: Contractor shall remove existing wood stove, flue, and chimney cap, and provide and install a new free-standing wood stove, flue, and chimney cap. Photos of existing equipment and conditions found in Appendix A,
1. Stove Unit: The provided unit shall be an EPA certified, air-tight, free-standing, front loading, self-contained, cord wood type, wood burning stove of steel construction with variable-speed electric blower, bypass damper, and tempered glass door. Stove shall be capable of heating a 1,500-sf space.
2. Flue: Flue shall be double walled, of steel construction, appropriately sized for the stove unit, and installed by a certified technician in accordance with manufactures specifications and applicable building codes.
3. Chimney Cap: Chimney cap shall contain a spark arrestor, be appropriately sized to flue and stove unit, installed in a workmanlike manner, and sealed to existing masonry so as not to allow intrusion by the elements or wildlife.
4. Installation: Installation technician shall be certified by National Fireplace Institute (NFI), Chimney Safety Institute of America, or approved equivalent.
6 Additional Requirements
Project Schedule
A. The Contractor shall develop a detailed project schedule. This schedule shall include key milestones of the project, including start and finish dates, as well as proposed work times. The Contractor shall submit this schedule for review and approval prior to work proceeding. The Contractor shall actively maintain and update the schedule as required by the COR.
Safety
A. The Contractor shall submit the following prior to work proceeding and maintain a copy onsite during the project:
1. Material Safety Data Sheets (MSDS)
2. Project specific site safety plan. This plan shall include the following at a minimum:
a. Description of work
b. Nomination of project management staff, including site safety representative
c. Contact information for project management staff.
d. Contact and location information for local emergency services.
e. Description of anticipated high safety risk activities, including activity hazard analyses and safety control measures
f. Site protection and traffic control measures, including sketches to illustrate provisions.
B. Contractor shall be responsible for complete and strict compliance with the park policies.
C. The Contractor shall fully comply with 29 CFR 1926.
D. The Contractor shall provide temporary safety barriers, as necessary, to provide a safe, hazard-free space for workers, pedestrians, and vehicles during construction.
E. The Contractor shall install protective measures to contain dust and debris during construction to assure a safe and irritant free work environment for building occupants. Return all areas to the original condition at the conclusion of work.
F. The Contractor shall remove and dispose of excess materials, debris, or waste at an approved off-site location in accordance with applicable Local, Tribal, State and Federal laws and regulations, and pay any related fees. Burning or burial of materials is not permitted.
Security
A. The Contractor shall secure new equipment and materials. Limited storage space is available in the maintenance yard for Contractor. However, the location of trailers, storage, sheds, and staging areas shall be approved by the COR.
B. The Contractor shall comply with all park security policies.
Quality Assurance
A. The Contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices. The quality of all work shall be the responsibility of the Contractor. Inspect and test all work as needed to ensure that the quality of materials, workmanship, work, finish, and functional performance is following the SOW.
B. The Government shall periodically evaluate the Contractor’s performance in accordance with this SOW.
C. All new equipment shall conform to the manufacturer’s instructions and guidelines for installation and start-up.
Travel
A. Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
Progress Payments
A. Progress payments during work will be based on the percentage of work completed on items listed on the approved Bid Schedule, Schedule of Values or by Contract Line Item. Actual work completed and in place will form the basis for payment.
Verification of the percentage (%) complete shall be initiated by the Contractor for approval by the COR. The Contractor shall make the computations for payment based on the Government’s verification of work completed and in place for any periods for which progress payments are requested.
B. The Contractor shall furnish the originals of all field notes, invoices and payroll reports, and all other records relating to the basis for payment, to the CO, who shall use them as necessary to determine the final amount of progress payments. The Contractor shall retain copies of all such material furnished to the CO.
Project Meetings
A. Pre-construction meeting: The CO will arrange an on-site pre-construction meeting with the Contractor. Notes of the meeting shall be recorded by the Contractor and will be distributed after the meeting. The meeting agenda shall include the following as a minimum:
1. Park rules and regulations
2. Correspondence procedures
3. Progress meetings
4. Lines of authority
5. Roles and responsibilities
6. Coordination of sub-contractors
7. Submittal process
8. Project schedule
9. Progress payments
10. Acceptance/rejection of the work
11. Labor standards and labor law application
12. Payroll reports
13. Modifications
14. Accident Prevention Plan and accident reporting
15. Medical emergency processes, availability, emergency numbers, and contacts
16. Park permits, burning work waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns.
17. Visitation, access, and public relations
Substantial Completion and Final Inspection
A. Submit written certification that project, or designated portion of project, is substantially complete, and request, in writing, a final inspection. Upon receipt of written request that project is substantially complete, the CO will proceed with inspection within 10 calendar days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. When work is determined to be substantially complete, the COR will prepare a list of deficiencies ("Punch List") to be corrected before final acceptance. The CO will issue a Letter of Substantial Completion. If work is not determined to be substantially complete, the CO will notify the Contractor in writing. After completing work, the Contractor shall resubmit certification and request a new final inspection.
C. If, following final inspection, the work is determined to be substantially complete, CO will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 15 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the CO may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Work clause of the contract.
7 Site Coordination
Existing Conditions and Coordination
A. The Contractor shall fully inform himself regarding all peculiarities and limitations of the spaces available for the installation of all work and materials furnished and installed under the contract. Coordinate with all other trades, as well as with existing conditions, in advance of the work, including requirements for openings, recesses and chases in the walls, partitions, framing or openings and routing of piping, conduit, etc. relative to each trade to alleviate conflicts.
Special Construction Conditions
A. Contractor requests to work afterhours shall be approved by the Contracting Officer’s Representative (COR). Requests to work outside normal business hours shall be submitted in writing to the COR and Facility Manager not less than 48 hours in advance of the proposed after-hours work. Any SAGU park staff overtime required may be charged back to the Contractor.
Staging Areas
A. Work sites shall be limited to the smallest feasible area. Ground disturbances and site management shall be carefully controlled to prevent undue damage to vegetation, soils, and archeological resources and to minimize air, water, soil, and noise pollution.
B. Confine storage of work materials and equipment to immediate vicinity of project site, unless directed otherwise by the COR. All staging areas shall be returned to pre-work conditions once work is complete. Standards for this, and methods for determining when the standards are met, shall be developed in consultation with the COR. If used, all temporary water, sewer, sanitary facilities, electric and other utilities, and utility connections shall be completely removed upon project completion.
Work Zones
A. Do not disturb portions of project site beyond areas in which the work is indicated.
Work zones may require work barrier fencing, chain link, plastic or portable fencing as directed by the COR. The fencing shall define the work zone and confine activity to the minimum area required for work. All protection measures shall be clearly stated in the work documents, and workers will be instructed to avoid conducting activities beyond the work zone as defined by the work zone fencing.
B. Confine limits of work to the smallest safe and efficient working areas. Prevent compaction of soils by equipment, and do not damage existing plantings or their root systems. All left over construction material shall be disposed of by Contractor.
C. Establishment of a construction camp shall not be permitted.
Protection of Public
A. The Contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. Erect and maintain fencing, barricades, lights, signals, and warning signs in accordance with MUTCD-2003 as applicable.
Parking of Work Vehicles
A. Parking of vehicles shall be limited to existing parking lot, in designated areas close to the jobsite, and within approved staging area.
Temporary Materials, Equipment and Services
A. Temporary materials may be new or used but shall be adequate in capacity for the required usage, shall not create unsafe conditions, and shall not violate requirements of applicable codes and standards.
Hot Work Permit
A. A Hot Work Permit is required for any welding, cutting, brazing, soldering or any work that generates sparks or excessive heat. Contractor shall provide at least a 24-hour advanced notice to obtain a Hot Work Permit. A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include providing and maintaining fire protection equipment and establishing and maintaining safe torch cutting and welding procedures.
Smoking
A. Smoking at the work site is prohibited. Due to drought conditions and the danger of wildland fire, smoking is allowed only within Contractor vehicles.
Electricity
A. Power will be available at construction site at no cost.
Telephone
A. Cell phone service is not available at many of the project sites. Contractor needs an alternate means of communication if emergency services and needed at the site.
Water
A. Water is available as advised by CHIR.
Sanitary Facilities
A. Restrooms are available in the park and on location.
Hauling Restrictions
A. Comply with all legal and local load restrictions in the hauling of materials.
Waste Management
A. Employ processes that ensure the generation of as little waste as possible. Minimize waste generation due to over-packaging, poor planning, breakage, mishandling, contamination, error, or other factors. Of the waste generated, as much as is economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills shall be minimized. All material unsuitable for recycling shall be disposed of, in a legal manner, at public or private dumping areas outside the park.
8 Submittals
A. Submit the items listed below for review and approval within 14 calendar days of contract award (unless otherwise noted). Government review comments will be returned within 7 calendar days after receipt of submittals. Note that some submittals are subject to award of bid options or alternate.
1. Schedule of values
2. Project schedule
3. Material safety data sheets
4. Safety plan
5. Shop drawings.
6. Product data
a. Heat pump system product data.
b. Housekeeping pads
c. Electrical disconnects.
d. Air filters
e. Thermostat / Controllers
f. Volume Control dampers
g. Ductwork insulation
h. Piping insulation
i. Paint manufacturer and color codes
j. Woodstove and piping
7. Pre-Functional testing forms/checklists (submit prior to functional testing)
8. Test, adjust, and balance deficiencies report (submit prior to functional testing)
9. Test, adjust, and balance report (submit prior to functional testing)
10. Functional test report (submit after functional testing and prior to inspection)
9 Final deliverables
A. Contractor shall provide the following within seven (7) calendar days of project completion and prior to final inspection. Submit draft versions of these items electronically (PDF). Once reviewed and approved, provide deliverables in two (2) 3-ring binders with section dividers for each deliverable. Final deliverables shall include a CD (or thumb drive) with all approved deliverables in electronic form (PDF). Contractor shall provide the following PRIOR TO FINAL PAYMENT.
1. Warranty Certificates – 2 hard copies and 1 digital (PDF)
2. Operation and Maintenance Manual - 2 hard copies and 1 digital
3. Record of training attendees
10 Appendix A: Erickson Photos and environmental report.
Figure 3. Overview of living room from dining room. Looking north.
Figure 4. Overview of living room looking into dining room. Looking south.
Figure 5. Original rock fireplace and shelving in living room.
Figure 6. Kitchen. Looking east.
Figure 7. Kitchen, looking into dining room. View west.
Figure 9. Hallway leading from laundry room to bedrooms. PDF for this pic
Figure 10. Bedroom, northwest corner of house.
Figure 11. Bedroom, northeast corner of house. Window on right, looks into garage.
Figure 12. Garage. It is assumed that the Fischer’s added the garage in 1980s.
Figure 13. Current heating-cooling unit. To be replaced with a new unit.
Figure 14. Current furnace. To be replaced with a newer unit and the removal of the asbestos furnace tape.
Figure 15. Drywall damage in the dining room, southwest corner.
Figure 16. More drywall damage in the dining area at the west window.
Figure 17. Drywall damage of the ceiling in the dining room.
Figure 18. Drywall damage at front door. Also, can see other damage at corner of window on two places on the ceiling.
Figure 19. Drywall damage around doorway leading from dining room to kitchen.
Figure 20. Drywall damage, kitchen side, of doorway leading into the dining room.
Figure 21. Back wall of the rock fireplace.
Figure 22. Drywall damage of hallway ceiling
Figure 23. Main bathroom.
Figure 24. Main bathroom. Black tile tested positive for lead.
Figure 25. Main bathroom. Black tile tested positive for lead. Note the damaged greenboard above the black tile. This will be replaced.
Figure 26. View of laundry room from kitchen doorway, showing half-bathroom entrance and door leading to back patio.
Figure 27. Shower stall in half-bathroom. Brown-red tiles tested positive for lead.
Figure 29. Front porch of the Erickson house.
Figure 41. South side of house.
Figure 44. North side of structure showing garage addition.
Figure 45. Manual garage door that is to be replaced with an automatic garage door opener. The replaced door will be similar in style as the current design.
ACl ENVIRONMENTAL INCORPORATED
Environmental, Health and Safety Consultants
Prepared For:
Ms. Shanna Ramsey, Facility Services Assistant National Park Service
Chiricahua National Monument 12856 East Rhyolite Creek Road Willcox, AZ 85643
William F. Martin, Certified Industrial Hygienist ACT Environmental, Inc.
Lead-Based Pain (LBP), Lead- Containing Material (LCM) and Asbestos Inspection
Home Located at
9818 Pinery Canyon Road, Willcox, AZ AEI
Date Submitted:
August 26, 2016
7592 N. la Cholla Blvd.• Tucson, Arizona 85741 • www.actenv.com • (520) 791-9029 fax (520) 791-9062
TABLE OF CONTENTS
Title of Section Page Number
1.0 Executive Summary ............................................................................................... I
2.0 Introduction
3.0 Scope of Work........................................................................................................ I
4.0 Testing Procedures ............................................................................................. 1-2
5.0 Building Description
6.0 Findings ............................................................................................................... 2-3
7.0 Recommendations/Conclusions
8.0 Project Staff
9.0 Limitations
List of Tables:
Table 1- Asbestos Summary Table Table 2- Detailed XRF Testing Results
List of Figures:
Figure 1- Site Plan
List of Appendices:
Appendix A- Appendix B Appendix C-
Laboratory Analysis Reports
Accreditation Certificates for AEI and Personnel Site Photos
ENVIRONMENTAL INCORPORATED
7592 N. La Challa Blvd. •Tucson, Arizona 85741 • www.actenv.com • (520) 791-9029 fax (520) 791-9062
1.0 EXECUTIVE SUMMARY
ACT Environmental Inc., (AEI) performed a lead-based paint (LBP), lead-containing material (LCM) and asbestos inspection of a home located at 9818 Pinery Canyon Road, Willcox, Arizona. The building is owned by the National Park Service. AEl is a registered environmental engineering consulting firm under contract to perform consulting services including LBP and asbestos inspections.
The scope of the inspection included all interior and exterior areas of the building. The inspection included one single story 1,800 square foot building plus a metal storage building.
The inspection was conducted on August 23, 2016. The inspection was performed by an EPA certified LBP inspector and Asbestos Hazard Emergency Response Act (AHERA) accredited inspector. One hundred forty nine (149) LBP sampling areas were tested for lead content. Lead testing was performed using a portable X-ray fluorescence analyzer. Fifty (50) samples of suspect asbestos-containing materials were analyzed.
LBP, LCM and asbestos containing building materials were identified.
2.0 INTRODUCTION
This inspection was performed at the request of the National Park Service. The intent of the inspection was to perform a LBP and asbestos inspection of building materials that may be impacted by building renovation.
3.0 SCOPE OF WORK
The scope of the project was to perform a LBP, LCM and asbestos inspection of all building materials on the interior and exterior of the building.
Asbestos bulk samples were submitted to Desert Analytical Services (DAS). The analysis was performed in accordance with EPA Test Method EPA-600/R-93/116. DAS is rated proficient in the AIHA Bulk Asbestos Proficiency Analytical Testing Program lab #198554. Copies of laboratory reports are included in Appendix A.
4.0 TESTING PROCEDURES
LBP/LCM Inspection-
Selected sites in the building area including all walls and each type of component were surveyed for the presence ofLBP/LCM using a spectrum analyzer portable X-Ray fluorescence (XRF) paint tester. The XRF unit was a Niton Xlp 300A. The analyzer reads the lead content non-destructively without collection of physical samples or stripping of paint. The analyzer automatically reads the lead content which gives an instantaneous readout oflead content. The instrument is calibrated every four hours or less.
Prior to testing, a review was performed. Buildings with common construction and painting history were identified. The testing protocol uses a north, south, east and west system for both interior and exterior walls.
P, LCMand Asbrstos lnsptctton, Home locc.Jtd al 9818 Pmtry Can,,on Rood. W1llcoz, AZ, AEI 169$
7592 N. La Cholla Blvd.• Tucson, Arizona 85741 • www.actenv.com • (520) 791·9029 fax (520) 791·9062
Asbestos Inspection-
Random and/or convenience samples of suspect asbestos-containing materials were collected.
Random sample locations were determined in accordance with EPA's guidance document EPA560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing materials. All testing utensils such as chisels, drills, and knives were cleaned between collection of each sample. Each sample container was labeled with a sequential ID# and also noted in the bulk sample log.
Suspect asbestos-containing materials in each building were categorized into homogeneous sampling areas. Homogeneous sampling areas are those areas which contain similar suspect materials. Similar materials are those which have the same physical appearance and appear to be applied at the same time using the same methods.
Chain of custody was initiated at the time of sample collection. Samples were hand delivered to the lab. Upon delivery to the lab, the samples are logged by the lab. At that point, the chain of custody became the responsibility of the lab.
All accessible areas were inspected. Despite efforts to identify all suspect asbestos-containing materials, additional suspect materials may be concealed by building components. Examples of these materials include piping concealed between walls, fire proofing, Transite panels and duct seam tape. If suspect materials are found, they should be assumed to contain asbestos unless further testing proves otherwise.
5.0 BUILDING DESCRIPTION
The original date of construction is estimated to be 1910. The home appeared to be recently renovated.
Buildings built prior to 1978 may contain LBP. The owner is the National Park Service.
The home is a single story building approximately 1,800 square foot building. A 300 square foot metal storage building is located north of the home. The home is constructed with stone walls and wood framing.
The roof is constructed with metal. The home has a crawl space below with a dirt floor. The home has an attic. Interior ceilings and walls are constructed with Sheetrock. The floors are a wood and vinyl floor tile.
The doors and door frames are wood. The original windows are steel-frame. New aluminum windows have been attached to the original windows.
6.0 FINDINGS
LBP and LCM was found including:
l. Room 3 Living room/dining room- The east French door. The main entrance, west side, door jamb.
2. Room 4 Hall Bathroom- The pink and black ceramic tile walls. Ceramic tile is classified as LCM.
3. Room 6 Laundry Bathroom- The pink and black ceramic tile walls. The ceramic tile is classified as LCM.
4. Room 7 Laundry room- The east exterior door jamb.
5. Room 8 Kitchen- The south exterior door jamb.
,LI l" P, LCM a11d Asbtsto.s b!SfNCllt)II, Homt localtdat 9818 PuwryOvtJon Rood, W11/cox, AZ. AEJ /695
..ii\) I_ENVIRONMENTAL INCORPORATED
]] 7592 N. La Cholla Blvd. •Tucson, Arizona 85741 • www.actenv.com • (520) 791-9029 fax (520) 791-9062
A(M
No other LBP or LCM was found.
Asbestos containing materials (asbestos content greater than 1%) found including:
I) 300 square feet of resilient flooring. The flooring is located in the hall bathroom room 4, laundry bathroom, room 6, laundry room 7, and kitchen room 8, This includes the bottom layers of resilient flooring found below newer 6"X6" and l 2"X12" vinyl floor tile. The bottom asbestos containing flooring includes beige/white floor tile with black adhesive attached to the original wood floor.
Some areas have a new wood underlayment applied to the original wood sub-floor. The flooring is categorized as Category I and II non-friable material, under the U.S. EPA NESHAP regulation.
2) 50 square feet of black roofing sealant, This includes black sealants applied to metal seams and roof penetrations. The roofing is categorized as Category I non-friable material, under the U.S. EPA NESHAP regulation.
3) 13 square feet of duct seam tape. The seam tape is applied to HVAC ducts found in the furnace room 5. The seam tape is also assumed to be found in the attic and crawl space on HVAC ducting.
The material is categorized as friable RACM under the U.S. EPA NESHAP regulation.
4) 50 square feet of exterior widow glazing is assumed to contain asbestos. The glazing is found on the original steel-frame windows. The glazing is found on the exterior glass window panes.
These panes are incased by new aluminum framed windows and could not be sampled without damaging the window system. The glazing is classified as RACM under the U.S. EPA NESHAP regulation.
Note: The interior Sheetrock texture/joint compound was reported to contain trace levels of asbestos, <I% asbestos. Therefore, the EPA does not consider it to be an asbestos-containing material. However, OSHA has minimal work practice requirements and prohibitions for trace levels of asbestos. These OSHA work practices require the use of wet methods, or wetting agents, prompt clean-up and disposal of waste in leak-tight containers. OSHA prohibits the use of high-speed abrasive disc saws and the use of compressed air to remove materials containing asbestos.
7.0 RECOMMENDATIONS/CONCLUSIONS
Asbestos building materials within the building include roofing, window glazing, flooring and duct seam tape. The materials do not present a health hazard in the undisturbed condition. The material should remain in place until a major renovation or demolition occurs. The EPA requires removal of these materials if the materials would be disturbed during renovation activities.
LBP and LCM were found on building components. LBP and LCM are in good condition and do not present a health hazard. The condition of the LBP and LCM should be monitored to assure it remains in good condition. lfLBP and LCM building components are disturbed, the work should be performed in accordance EPA's lead safe work practices and in compliance with the OSHA lead standard. Contractors performing work must be certified by the EPA for lead renovation, repair and painting work.
r P, LCM and Asb,stos lnsp<ellon, Hom, /ocai,d at 98/8 Pm<ry UV!.>"'' Road, W,1/co.r, AZ, A£/ /69$
I.) I. ENVIRONMENTAL INCORPORATED
7592 N. La Cholla Blvd.• Tucson, Arizona 85741 • www.actenv.com • (520) 791·9029 fax (520) 791-9062
8.0 PROJECT STAFF
William F. Martin and Nate Pfister perfonned the inspections. One additional technician assisted with the inspections. Mr. William F. Martin is a certified industrial hygienist, an EPA certified lead inspector/risk assessor and an EPA accredited asbestos inspector. Mr. Pfister is an EPA accredited asbestos inspector.
9.0 LIMITATIONS
Every effort was made to locate asbestos-containing materials. Specific limitations applicable to this inspection include the following:
Some areas of the building, such as between walls and above the ceiling, were not accessible. Examples of asbestos-containing materials which may be present in these inaccessible areas include duct tape, pipe insulation, fire proofing, Transite pipes and Transite panels.
Paint containing less than 1.0 mg per square centimeter is considered "lead free" by the EPA. OSHA has not adopted the EPA "lead free" definition and does not have a regulatory threshold for lead content.
This inspection was perfonned in accordance with existing standards and acceptable practices. Every reasonable effort was made to identify all suspect asbestos-containing materials located in the building.
L1 P. LCM and Asb,stos lnsp<c11on, Hom.loaued at 9818 Pi11try °"'>""' Road. W1/lcor, AZ. AEJ i69S
...Ii, ENVIRONMENTAL INCORPORATED
Table1
Summary of Asbestos Analysis
9818 Pinery Canyon Dr.
Willcox.AZ
Sample Number
Homogeneous Sampling
Area
(asbestos-containing materials (>1%) are shown in shaded bold print)
Asbestos
Content
Location
I Roof penetration sealant S% Attic - north, roofvent
2 Penetration sealant S% Attic - north, roof vent
3 Blown-in insulation None detected Attic - north
4 Blown-in insulation None detected Attic - south
5 Blown-in insulation None detected Attic - north
6 Paperback rolled insulation
None detected Attic - north
7 Paperback rolled insulation
None detected Attic - north
8 Duct tape 60% Room S - furnace ducting
9 Duct tape 60% Room S - furnace ducting
10 Duct tape 60% Room 5- furnace ducting
11 Caulking None detected Room 8 - south wall
12 Vibration fabric None detected Room 5 - furnace ducting
13 Vibration fabric None detected Room 5 - furnace ducting
14 Wall core Drywall surface texture
None Detected
0.5%
Room 5 north wall
15 Caulking None detected Hallway wall - behind fireplace
16 Drywall None detected Access hatch to bath tub in room 4
17 Caulking None detected room 8 - east wall 18 Wall core swface texture
None detected
0.75%
Hallway - behind chimney
19 Drywall None detected Room 3- at Fireplace
20 Wall core Dcywall surface texture/joint compound
None Detect
0.25%
Room 5 south wall
21 Wall core Drywall tape texture
Non detected
0.50%
Hallway behind chimney
22 Drywall None detected Room 8 - east wall 23 Original vinyl flooring and adhesive 1-2% 5%
Room 7 - northeast near water heater
Table1
Summill)I of Asbestos Analysis
9818 Pinery Canyon Dr.
Willcox.AZ
Sample Number
Homogeneous Sampling
Area
(asbestos-containing materials (>1%) are shown in shaded bold print)
Asbestos
Content
Location
24 12xl2 floor tile adhesive
None detected
None detected
Room 7 - northeast near water heater
25 Original vinyl flooring and adhesive
1-2%
5%
Room 7- southeast corner
26 6x6 floor tile and adhesive
None detected
None detected
Room 4 - southeast comer
27 6x6 floor tile and adhesive
None detected
None detected
Room 4 below linen closet
28 Mortar None detected Room 3 Fireplace
29 Caulking None detected Room 6 - bathtub
30 Tile grout None detected Room6
31 Caulking None detected Room 8 - south wall
32 White window caulking None detected Exterior - south face, room 8 window
33 Black window caulking None detected Exterior - south face, room 8 window
34 Original window caulk None detected Exterior- east patio, room 7, window
35 Original window caulk None detected Exterior - west face, porch, south end
36 Window caulking None detected Exterior - north face, room 2, window
37 Mortar None detected Exterior - northeast comer
38 Cement None detected Exterior - driveway near northeast comer
39 White roof sealant None detected Roof- center. Roof peak at chimney
40 Black roof sealant 10% Roof - center, roof peak
41 Door caulk None detected Exterior- south face, room 8
AEI # 1695 Table 2: Lead Based Paint Testing 9818 Pinery Canyon Road
Willcox, AZ
:8!8]:IILComP.9.nent ColO[ on....Resaffi i:jj\2) - jfum_ - _ ...l!-- Dlijsjon Calibration 1
2 Calibration 1
3 Calibration 1.1
4 window shade wood cream intact negative 0 exterior west 5 window frame metal black intact negative 0 exterior west 6 railing metal black intact negative 0 exterior
7 roof deck wood cream intact negative 0.01 porch
8 rafter wood cream intact negative 0 porch west
9 beam wood brown intact negative 0 porch west 10 floor wood blue intact negative 0 porch west 11 security door metal black intact negative 0 porch west 12 door frame wood brown intact positive 2.6 porch west 13 door wood cream intact negative 0.6 porch west 14 gutter metal brown intact negative O· porch west 15 window header metal brown intact negative 0.01 porch west 16 rafter wood cream intact negative 0 porch west
17 eav wood cream intact negative 0.26 porch west 18 fascia wood brown intact negative 0.09 exterior north 19 roof deck wood cream intact negative 0 exterior north 20 T111 wood cream intact negative 0 exterior north 21 window wood brown intact negative 0 exterior north 22 garage door frame wood brown intact negative 0 exterior north 23 support beam wood brown intact negative 0 exterior north
24 T111 wood cream intact negative 0 exterior east 25 eav wood cream intact negative 0 exterior east 26 rafter tail wood cream intact negative 0 exterior east 27 door frame wood brown…
This is the start of the file's text. The full file is on GovTribe.