CACO MAINTAIN WATER STORAGE TANKS Federal contract opportunity
Solicitation number
140P4325Q0068
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is a Statement of Work (SOW) for maintenance and repairs of public drinking water storage tanks at two locations within Cape Cod National Seashore: Coast Guard Beach in Eastham and Head of the Meadow Beach in Truro, Massachusetts. The project involves comprehensive rehabilitation of tank interiors and exteriors, including surface preparation, steel coating, concrete repair, and installation of new components, with the primary objectives of ensuring regulatory compliance, extending infrastructure lifespan, maintaining public health standards, and supporting park operations.

Key technical requirements include SP2/SP3 and SP10 surface preparations, application of epoxy/urethane coating systems to interior and exterior steel, concrete repairs, and installation of pressure vent assemblies. The maintenance work aims to meet EPA Safe Drinking Water Act requirements, Massachusetts DEP regulations, and NPS Public Health Policy. The project is expected to extend tank operational life by 5-10 years, mitigate water contamination risks, and enhance visitor experience by ensuring reliable drinking water infrastructure. The solicitation is issued by the Department of the Interior National Park Service Northeast Region, with the solicitation number 140P4325Q0068.

View the file

Other files for this federal contract opportunity

Other files attached to CACO MAINTAIN WATER STORAGE TANKS, newest first.
File Type Posted
Sol_140P4325Q0068_Amd_0002.pdf PDF
B09-Amd2-RFI_3-11_0002.docx DOCX document
B09-Amd2-MA-Truro_CCNS_25KG_Inground_05_10_16_Report_(1)_0002.pdf PDF
B09-Amd2-ma1_r0_0002.txt TXT text file
B09-Amd2-MA-Eastham_CCNS_Coast_Guard_25KG_Inground_06_20_16_Report_0002.pdf PDF
Sol_140P4325Q0068_Amd_0001.pdf PDF
B09-Amd1-RFI1-2_0001.docx DOCX document
B03-WD-MA20250001-Mod10-8_1_25_0001.pdf PDF
B08-Attachment_3_-Construction_Contract_Administration.pdf PDF
B03-WD-MA20250001-Mod10-8_1_25.pdf PDF
Sol_140P4325Q0068.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of work for Public Drinking Water Storage Tank Maintenance and Repairs at Coast Guard Beach in Eastham and Head of the Meadow Beach in Truro at the Cape Cod National Seashore Project Overview:

This project aims to address critical deficiencies identified in the public drinking water storage tanks within the Cape Cod National Seashore at Coast Guard Beach in Eastham, and Head of the Meadow Beach in Truro, Massachusetts. Comprehensive maintenance and repairs are essential to ensure the safety, reliability, and longevity of these facilities, which are vital for providing potable water to park visitors and staff.

Items needed for Coast Guard Beach include but are not limited to.:

Interior & Exterior Rehab:

1. Sp2/SP3 surface preparation of steel on exterior hatch.

2. Application of epoxy/urethane coatings system to steel on exterior hatch

3. Concrete repair of exterior hatch

4. SP10 surface preparation of interior steel

5. Two coats of 100% solids epoxy applied to interior steel.

Items needed for Head of the Meadow Storage Tank include, but are not limited to:

Preparation and painting of interior & exterior steel:

Installation of new pressure vent assembly:

1. SP2/3 surface preparation of exterior steel.

2. Application of two coat epoxy/urethane system to exterior steel.

3. Sp10 surface preparation of interior steel

4. Application of 100% solids epoxy to interior steel

5. Patching of small void near the top of the shell wall immediately adjacent to the support beam A site visit to the two sites is highly recommended

1. Compliance with Health and Safety Standards Regulatory Compliance: The maintenance and repairs will ensure that the storage tanks meet the requirements set forth by the EPA Safe Drinking Water Act, the Massachusetts DEP Safe Drinking Water Regulations (310 CMR 21.00), and NPS Public Health Policy RM 83. Adhering to these regulations is crucial for safeguarding public health and maintaining the integrity of the drinking water system.

Inspection Findings: Previous inspections by WASO Public Health have highlighted deficiencies, including the need for interior cleaning, priming, and epoxying of tank interiors, which are essential for ensuring the tanks comply with safety standards.

2. Extending Operational Lifespan Prolonging Lifespan: Performing the identified maintenance and repairs is expected to extend the life cycle of the tanks by 5-10 years. This proactive approach will maximize the utilities of existing infrastructure while park management plans for the eventual replacement of the tanks, which typically have a 30-year life cycle.

Cost-Effectiveness: Investing in maintenance and repairs now can prevent more costly emergency repairs or replacements in the near future, ultimately leading to significant savings for the park.

3. Maintenance of Public Health Infrastructure Access to Safe Drinking Water: The storage tanks are critical to ensuring that park visitors and staff have access to safe drinking water, particularly during peak visitation periods. Maintenance is essential to uphold the quality of this vital resource.

Risk Mitigation: Addressing the deficiencies regarding the interior ladders, overflow pipe assembly, and main shut-off valve will reduce the risk of water contamination and enhance the functionality and safety of the system.

4. Support for Park Operations and Visitor Experience Ensuring Reliability: Reliable drinking water infrastructure enhances the overall visitor experience, as access to water is a fundamental need, especially in a popular recreational area like Coast Guard Beach and Head of the Meadow Beach.

Operational Efficiency: Regular maintenance allows park staff to operate efficiently without the disruptions that can arise from unexpected failures of critical infrastructure.

5. Environmental Considerations Safeguarding Natural Resources: Proper maintenance and operation of drinking water storage tanks are essential for protecting water supplies and natural resources. Ensuring tanks are in good condition reduces the risk of leaks or failures that could have an adverse impact on the surrounding environment.

Conclusion The proposed maintenance and repairs to the public drinking water storage tanks at Coast Guard Beach and Head of the Meadow Beach are both necessary and justified. By ensuring compliance with federal and state regulations, extending the infrastructure’s operational lifespan, maintaining public health infrastructure, and enhancing visitor experiences, this project will have a lasting positive impact on the park and its visitors. Taking these essential steps now will safeguard public health, protect environmental resources, and prepare for future infrastructure planning.