B09-Amd2-RFI_3-11_0002.docx

DOCX document 24 KB Posted

Attached to
CACO MAINTAIN WATER STORAGE TANKS Federal contract opportunity
Solicitation number
140P4325Q0068
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is a Request for Information (RFI) Amendment 0002 for a National Park Service water storage tank maintenance project in Barnstable County, Massachusetts. The solicitation (140P4325Q0068) involves maintaining two 25,000-gallon underground water storage tanks, with project completion required before January 2026. Key details from the Q&A include confirmation that no bid bond is required, work potentially can be performed seven days a week, and both tanks can be worked on simultaneously. The project does not provide on-site water access for contractors, and Davis-Bacon wage rates for Barnstable County will apply. Inspection reports and water tank details are referenced as being available in attached documents, with specific tank characteristics noted to be contained within those reports.

View the file

Other files for this federal contract opportunity

Other files attached to CACO MAINTAIN WATER STORAGE TANKS, newest first.
File Type Posted
Sol_140P4325Q0068_Amd_0002.pdf PDF
B09-Amd2-MA-Truro_CCNS_25KG_Inground_05_10_16_Report_(1)_0002.pdf PDF
B09-Amd2-ma1_r0_0002.txt TXT text file
B09-Amd2-MA-Eastham_CCNS_Coast_Guard_25KG_Inground_06_20_16_Report_0002.pdf PDF
Sol_140P4325Q0068_Amd_0001.pdf PDF
B09-Amd1-RFI1-2_0001.docx DOCX document
B03-WD-MA20250001-Mod10-8_1_25_0001.pdf PDF
B08-Attachment_3_-Construction_Contract_Administration.pdf PDF
B03-WD-MA20250001-Mod10-8_1_25.pdf PDF
Sol_140P4325Q0068.pdf PDF
A04-SOW_CACO_H2O_Tanks.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4325Q0068 Amendment 0002

RFI 3-11

3. I went on the website to download the bid documents for the above-named project and one of the attachments will not open. It is the attachment titled B03-WD-MA20250001-Mo d10-8_1_25.pdf. Can you provide a copy of this document.

Response: WD was re-uploaded with amendment 0002

4. Please confirm a bid bond is not required for this project.

Response: bid bond not required.

5. Can you provide information on the two water tanks, such as:

· how many gallons are the tanks Response: 25,000 each

· are the tanks elevated tanks or ground storage tanks Response: underground storage tanks

· what year were the tanks built – are the tanks known to contain lead Response: in report

· what are the dimensions of the tanks – height, diameter, etc.

Response: in report

· can you provide an address or coordinates for each tank Response: in report

6. Will there be access to water at each of the tank sites for use while performing the project?

Response: No, water will not be available.

7. Can we work 7 days a week?

Response: Potentially, depends on the time of year

8. Do you have a copy of the last inspection report for each tank that you can provide?

Response: yes, attached

9. Can you provide a copy of the wage rates for this project?

Response: Davis Bacon Rates for Barnstable County Massachusetts Attached with amendment 0001 again as well as in the original RFQ posting in SAM.gov

10. Can both tanks be worked on at the same time?

Response: yes

11. Can the project be done in the Spring of 2026 or must it be completed before January 2026?

Response: Before January of 2026

File details come from the government source that posted it. Updated .