A04 - SOW - ATTACHMENT 1.pdf
PDF 1 MB Posted
- Attached to
- RELOCATE MUSEUM COLLECTION Federal contract opportunity
- Solicitation number
- 140P5220Q0069
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11 - Site Visit Docs_0001.pdf | ||
| Sol_140P5220Q0069_Amd_0001.pdf | ||
| CORRECTED - Provisions and Clauses_0001.pdf | ||
| QUESTIONS AND ANSWERS_0001.pdf | ||
| Provisions and Clauses.pdf | ||
| PRICE SCHEDULE.docx | DOCX document | |
| A04 - SOW - ATTACHMENT 2.pdf | ||
| Past Performance Worksheet.doc | DOC document | |
| B03 - DOL Wage Determination.pdf | ||
| A04 - SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
MUSEUM STORAGE DESIGN PLAN AND FACILITY SCHEMATICS
Museum Collections storage space needing storage system installation.
User Polygon
User Callout
+/- 8,675 SF
User Polygon
User Callout
+/- 1,325 SF
Park Approved Museum Storage Design Plan showing loading dock (upper left corner), base bid (red), bid option 1 (yellow), bid option 2 (green), bid option 3 (blue), and bid option 4 (purple). Grayed out shelving is not included in this contract (NIC).
NEW EQUIPMENT TO BE PURCHASED / INSTALLED
1 ' wELL TOOL SHAFT STORAGE RACKS
(NEw EQUIPMENT)
I
I i i i i i
PULL-OUT MODULAR TwO DIMENSIONAL STORAGE
(NEw EQUIPMENT) i-------<10'�-, t-------il0'�-----1
ARCHIVE MOVEABLE SHELVING
(NEw EQUIPMENT)
�I-----+---------tt---------1------IIJ :.a...JI.JI. n n n n n n JL..!I..JI. JL..!I..JI. JL..!I..JI. ..IL.ll..ll
,1/////////, FRONT VIEIJ
IJITHOUT PANEL
I ,3--6·, r32.51 Ml'-3' l.4' 8' l
D D
FRONT
"""'\. PANEL HAND CRANK IJITH� .
J
PARKING BRAKE
TOP OF
RAIL
\ FLOOR
MECHANICAL� \__CARRIAGE
SAFETY BRAKE _,.-.,....l_,,_,.J_,,_,iJ..,._,1:::•!Jl-ej,--�-,-�-e!j
BASE BID
BID OPTION 1BID OPTION 2
ARTIFACT MOVEABLE SHELVING
(FUTURE EXPANSION EQUIPMENT) �II----+---+---t--------t--------r-------.lJ r 32.s1
HAND CRANK 1./ITH-.
i>l
PARKING BRAKE
TOP OF
RAIL
\ FLOOR
FRONT VIEi.i
1./ITHOUT PANEL
I r3
6 '7M l'-3'
FRON�
',, PANEL
21'-8'
Cl'
J
MECHANICAL� \_CARRIAGE
SAFETY BRAKE
�Ill----+--I -+--I --+--1 ------.-1 --------.-1-------.1] FRONT VIEi.i
1./ITHOUT PANEL
I r3'-6 '7
21'-8' r s.s1 1-J 1'-6' n n n_o _o n_o--" n n n
I� �,,,,,,,,�
I� I"\
I�
I� I"\
I�
I� I"\ n n _o n n n n...n_o n_o_o n n n n_o--" n_n_o n n n
I\ ��,,,,,�
I\ I\
I\
I\ I\
I\
I\ I\ □ □
HAND CRANK 1./ITH
PARKING BRAKE --
FRONT
PANEL ',,
Cl'
J ,_3,_1J_3,_2�J_3,_2�J_3,_6��'-e�.L,_a�.L,_a�..L,_1J_3,_2�J_3,_2�J_3,_6��'-e�.L,_a�.L,_a�.L,_a�.L,_e�._
TOP OF < 7'-3'
RAIL
\ FLOOR
MECHANICAL� CARRIAGE
SAFETY BRAKE
BID OPTION 3
| SOW CARI Acquire and Install Museum Storage_final.pdf |
| NPS CARI LEASE_EAGLE BLDG PLAN_w NOTES |
| SOW CARI Acquire and Install Museum Storage_final |
| Eagle A101 - FLOOR PLAN EQUIPMENT LAYOUT FINAL |
| Eagle A101 - FLOOR PLAN EQUIPMENT LAYOUT FINAL FUTURE EXPANSION |
| Eagle A101 - FLOOR PLAN EQUIPMENT LAYOUT FINAL NEW EQUIPMENT |
| SOW CARI Acquire and Install Museum Storage_final |
| CRC NHP Mobile Shelving Specifications1 |
| CRC NHP Modular Storage Screen Specifications1 |
| CRC NHP Cantilever Storage Rack Specifications1 |
| MontelMobilexBrochure |
| ModulArt |
| IMCantilever |
File details come from the government source that posted it. Updated .