A04_Road_Oil_FY_26_SOW.docx
DOCX document 30 KB Posted
- Attached to
- Purchase Road Emulsion Oil for Yellowstone Federal contract opportunity
- Solicitation number
- 140P1426Q0048
About this file
This is a Statement of Work for the supply, transport, and delivery of bulk road emulsion oils to Yellowstone National Park during the period June 1, 2026 through September 30, 2026. The National Park Service requires 194,000 gallons of Polymerized Asphalt Surface Sealer Chip Retention (PASS-CR) or equivalent and 4,800 gallons of Gilsonite-based Asphalt Sealer (GSB-78) or equivalent. Deliveries will occur throughout Yellowstone National Park at five designated locations: Grant Village, Old Faithful, Norris Junction, Canyon Village, and West Gate, with contractor responsibility for freight charges to points within 30 miles of each location. The contractor must be capable of delivering between 12,000 and 24,000 gallons per day and must coordinate all delivery dates and times with the National Park Service at least one week in advance.
Key delivery and performance requirements include maintaining materials at minimum 140 degrees Fahrenheit to prevent application delays, limiting truck loads to 27 tons and total truck length to 75 feet, and providing a Bill of Lading and Certificate of Analysis with each delivery. The PASS-CR material must meet specified viscosity requirements (100-250 Saybolt Furol @ 122°F) and demonstrate a 5-year proven performance record in high-altitude, low-temperature environments. The GSB-78 material must contain at least 40 percent gilsonite and meet specific ASTM standards for kinematic viscosity, penetration, softening point, and solubility. The contractor must provide an on-site Subject Matter Expert with minimum 10 years of documented experience with these products. Additional charges apply for demurrage (capped at 20 hours unless approved), overnight holding (limited to one night unless approved), and return-to-plant delays. Payment is based on actual gallons delivered with temperature correction to cold gallons, supported by trucking manifests with each invoice.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Solicitation_Attachment_3_Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P1426Q0048.pdf | ||
| Attachment_2_Yellowstone_National_Park_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Description / Requirements:
· Yellowstone National Park requires the supply, transport, and delivery of bulk:
· Polymerized Asphalt Surface Sealer Chip Retention (PASS-CR) or equivalent (See specification below). 194,000 Gallons.
· Yellowstone National Park also requires the supply, transport and delivery of Gilsonite-based Asphalt Sealer (GSB-78) or equivalent (See specification below). 4,800 Gallons
Location:
Project locations occur throughout Yellowstone National Park. See the list of designated areas for each product below. Contractor should anticipate delivering to a project site + 0 miles to 30 miles of the specific location.
Period of Performance:
Work will be performed June 1, 2026 – September 30, 2026.
CLINS:
· Polymerized Asphalt Surface Sealer Chip Retention (PASS CR) or equivalent
· Gilsonite-based Rejuvenating Asphalt Sealer, (GSB-78) or equivalent
· Potential Additional Charges
· Demurrage Per Hour
· Overnight Hold Charge Per Night
· Return to Plant Charge Per Tanker Delivery Requirements:
· Deliveries shall not exceed 27-ton loads unless authorized by the COR.
· The total truck length not to exceed 75 feet unless authorized by the COR.
· Compression brakes shall not be used on hauling vehicles within five miles of in-park campgrounds and developed areas.
· With each delivery the contractor shall provide to the COR the BOL (Bill of Lading) and a Certificate of Analysis from the emulsion plant.
· Upon Request from the COR the contractor shall provide driver verified load samples with each load to the COR at the work site.
Requirements Chip Seal Oil:
The contractor shall be capable of delivering the quantity of materials for each issued task order. The contractor shall coordinate the exact dates and times of delivery with the National Park Service at least one week in advance.
The contractor shall be capable of delivering between 12,000 and 24,000 gallons of oil per day. The contractor shall ensure that the total amount of all orders and deliveries does not exceed the amounts authorized in writing by the Contracting Officer. The contractor's schedule shall allow the NPS a 3hour time span from the time the contractor's delivery trucks arrive at the project site to the time the NPS is able to accept delivery and release the trucks before demurrage is charged to the National Park Service.
Chip Seal Oil Specifications: PASS CR (or equivalent):
All chip seal oil shall be delivered to Yellowstone National Park at a temperature of not lower than 140 degrees Fahrenheit as not to delay application of the material.
Salient Characteristics: Shall meet the Characteristics of the attached specification for Polymer Asphalt Surface Sealer except for Viscosity.
Viscosity: Saybolt Furol Viscosity shall be between 100 to 250 @ 122.00 degrees Fahrenheit.
The material shall be compatible with asphalt pavement and have a 5-year minimum proven performance record on roadways and parking areas with climatic conditions similar to the following:
· Altitudes over 6,000 ft
· Low overnight temperatures during summer (sometimes below freezing)
· Heavy tree covered areas of little sunlight
· Early morning wet sweeping operations
Delivery Locations:
Contractor shall include freight charges to each of the following locations in the park to include + or - 30 miles of each location.
· Grant Village
· Old Faithful
· Norris Junction
· Canyon Village
· West Gate
Requirements for Rejuvenating Asphalt Sealer GSB-78 (or equivalent):
The contractor shall be capable of delivering the bulk quantity of materials.
The contractor shall coordinate the exact dates and times of delivery with the National Park Service at least one week in advance. At the time of delivery and with each invoice the contractor shall provide trucking manifests which shall serve as contractor certification as to the number of gallons and/or totes delivered.
The material shall be compatible with asphalt pavement and have a 5-year minimum proven performance record on roadways and parking areas with similar climatic conditions.
Rejuvenating Asphalt Sealer Specifications: GSB-78 (or equivalent) The asphalt material base residue shall contain not less than 40% gilsonite, or uintaite, and shall not contain any tall oil pitch or coal tar material.
Salient Characteristics Properties for Asphalt Sealing Material
Properties Kinematic Viscosity at 140°F (60°C) Percent Residue by Distillation Specification Limits ASTM D4402 10-30 cSt
ASTM D402 30-45%
Tests on Residue from Distillation
Properties
| Specification |
| Limits |
Penetration at 77°F (25°C)
| ASTM D5 |
| 2-12 dmm |
Softening Point
| ASTM D36 |
| 180-200 |
Solubility in 1,1,1 Trichloroethylene
| ASTM D2042 |
| 99% min. |
HCI Precipitation Value
18-25
| ASTM International (ASTM) |
| Description |
| ASTM D4402 |
| Standard Test Method for Viscosity Determination of Asphalt at Elevated Temperatures Using a Rotational Viscometer |
| ASTM D402 |
| Standard Test Method for Distillation of Cutback Asphalt |
| ASTM D5 |
| Standard Test Method for Penetration of Asphalt Materials |
| ASTM D36 |
| Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) |
| ASTM D2042 |
| Standard Test Method for Solubility of Asphalt Materials in Trichloroethylene |
Copies of the "American Society for Testing and Materials" Specifications referred to herein may be obtained for a nominal charge by contacting the Society at: https://www.astm.org/
Contractor Provided Subject Matter Expert (SME):
Contractor shall provide an on-site SME with a minimum of 10 years documented experience with the Polymerized Asphalt Surface Sealer (PASS CR) and Gilsonite-based Asphalt Sealer or equivalent products. If the Contractor SME changes at any time during performance, a new resume that meets or exceeds experience requirements shall be provided for NPS review prior any future order issuance.
SME shall also be responsible for coordinating deliveries of the proper products to the job site on time and in the quantities prescribed by the COR to include proper placement of tankers on the work site.
Demurrage*:
Contractor shall provide the hourly rate of demurrage for extra time the oil transports are held beyond the 3-hour time limit, if necessary. Total demurrage shall not exceed 20 hours unless approved by the Contracting Officer in writing.
Holding a tanker overnight:
Contractor shall provide the cost of holding a tanker overnight due to weather delays or any other delays. Total overnights shall not exceed one night unless approved by the Contracting Officer in writing.
Return to plant charge:
Contractor shall provide the cost of delay in returning a tanker to the plant due to the fault of the Government.
Payment:
At the time of delivery and with each invoice the contractor shall provide trucking manifests which shall serve as contractor certification as to the number of gallons delivered. Payment will be made on actual gallons delivered and based on temperature corrected cold gallons.