This statement of work outlines requirements for a water system improvement project at the Cosby Campground and Maintenance/Residence Area within the Great Smoky Mountains National Park. The project involves replacing approximately 3,850 linear feet of aging waterlines with new 4-inch ductile iron and 2-inch high density polyethylene pipes to service the campground, comfort stations, and maintenance buildings. The contractor will be responsible for furnishing all materials and labor to install the new waterlines and appurtenances according to state standards, conduct pressure testing and disinfection, and ensure maintenance of water service during construction. Work must be completed between November 1, 2021 and March 31, 2022 to coincide with the campground's off-season closure period. The solicitation number for this project is 140P5321R0015 and was issued by the National Park Service Southeast Region within the Department of the Interior. Liquidated damages may be assessed if all work is not finished by the specified completion date.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Water System Improvement Project
Cosby, TN Great Smoky Mountains National Park
Cosby Campground, Maintenance, and Residence Area
1. General Information
The Great Smoky Mountains National Park (GRSM) is located in Tennessee and North Carolina and consists of nearly 521,000 acres. The park was established by Congress on June 15, 1934.
The Park's mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 9 million visitors annually.
2. Facility Background
The Cosby Campground and the Maintenance/Residence area are located on the Park access road off of Hwy 32,just east of the intersection with Hwy 321. The Maintenance/Residence Area is located on the left side of the access road approximately one mile from the intersection with Hwy
32. The Campground is located at the end of the Park access road. The Maintenance Area consists of one structure with both office and storage space. The Residential Area includes the Ranger Station, two (2) duplex residential structures, and an apartment building. The Campground includes eight (8) Comfort Stations, an entrance kiosk, and a residential house, which is used for maintenance purposes.
It is proposed to install a new potable water distribution system to both areas. Improvements for each area are described in the following section.
WATER SYSTEM
The Maintenance/Residence Area water system consists of approximately 2,430 linear feet of 6-inch waterline. The original waterline was 6-inch cast iron; and was installed in 1958. The cast iron line was replaced with 6-inch PVC in 1988. That line has reached the end of its service life and needs to be replaced. The waterline for the Campground Area consists of approximately 1,180 linear feet of 4-inch waterline, and 1,320 linear feet of 2-inch waterline. These lines were also installed originally in 1958; and replaced in 1988 with PVC. This line has also reached the end of its service life.
3. Scope of Work
The scope of work for each system is as follows:
WATER SYSTEM
The scope of work includes replacing the existing 4-inch and 6-inch PVC waterlines with 4-inch Ductile Iron waterlines. The 2-inch water services to the existing Comfort Stations will also be replaced with 2-inch High Density Polyethylene waterline. The service lines will be installed up to the existing valve boxes outside of the Comfort Stations. The valve and box for some Comfort Stations (whose valves have not yet been changed) will also be replaced as part of this work. The 3/4-inch service lines from the main to the original drinking fountains are also included in the scope of work. The service lines to the residential units and to the Maintenance Building will be completely replaced all the way to the buildings, including all pipe, valves and valve boxes/
4. Contractor Responsibilities
Contractor Shall Provide the Following Materials and Services:
(All materials and installations shall be in accordance with the Tennessee Department of Environment and Conservation standards and specifications)
The Campground will be closed during the proposed work, and the existing waterline will be taken out of service; therefore, maintenance of water service will not be required during the course of the work.
The Maintenance/Residential Area will be in use; therefore, water disruptions will need to be coordinated in advance.
WATER SYSTEM
• 4-INCH DUCTILE IRON WATERLINE:
The proposed 2-inch and 4-inch waterlines are to be installed in the same trench or in the same general area as the existing lines wherever possible. The existing 2-inch and 4-inch waterlines are to be removed and disposed of off-site at the contractor's expense ( only as necessary when it is in the way of the new line).
• 2-INCH HIGH DENSITY POLYETHYLENE WATERLINE:
The proposed 2-inch waterline is to be installed to service the existing Comfort Stations and Maintenance Facility Building in the Campground Area.
• 1-INCH HIGH DENSITY POLYETHYLENE WATERLINE:
The existing service lines in the Maintenance/Residential Area are to be completely replaced with 1-inch HDPE waterlines and 1-inch ball valves.
• 3/4-INCH HIGH DENSITY POLYETHYLENE WATER SERVICE:
The water service lines to the existing drinking fountains are to be replaced as part of the work.
• VALVES, AND FITTINGS:
All valves, fire hydrants, and fittings shall be provided and installed as noted on the plans and specifications.
• PRESSURE TEST AND DISINFECTION:
All installed pipes, valves and fittings shall be pressure tested and disinfected in accordance with the plans and specifications.
17. Non-Payment for Additional Work Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor.
Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
18. Conflict of Interest The contractor shall not employ off-duty CO R's or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.
19. Quality Control The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Statement of Work - Requirements
Summary (Section 12) provides requirements for the installation of waterlines and appurtenances that are the minimum requirements for the installation of the new water system. The contractor's QCP shall address methods for remedying any non-compliant work. The Contractor shall develop QCP and submit with proposal package. The Contractor's QCP includes:
• Required services identified in the "Statement of Work - Requirements Summary"
• Contractor's surveillance methodology
• Method and timeframe for responding to COR or customer complaints
• Progress meetings with Government stakeholders
20. Contractor's Proposal Package The following deliverables are to be submitted with offer in response to RFP.
• Technical Approach to perform required construction services.
• Identification of key personnel to be responsible for the on-site work and their qualifications related to specific requirement.
• Contractor safety plan specific to Site.
• Contractor's QCP specific to Site.
• Proof oflnsurance-Business Liability & Workers Compensation.
21. Inspection.
The Government will conduct inspections during and upon completion of required services. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.
22. Schedule The Cosby Campground is closed from November 1, 2021 to April 1, 2022. Proposed work shall commence on November 1, 2021, and all proposed work in the Campground shall be complete by March 31, 2022. Proposed work in the Maintenance/Residential Area shall be started and completed within the same time period. The contractor shall provide a realistic schedule for the completion of the proposed work; and notify the Park if there is not sufficient time in the schedule prior to accepting the contract.
23. Liquidated Damages
The scheduled opening date for the Cosby Campground is a critical date, and all proposed work must be completed by the scheduled completion date. Should additional days be required to complete the utility work beyond the scheduled completion date for the work, there will be assessed liquidated damages.
24. Referenced Documents
The Design Plans and Specifications for the "Cosby Water System Improvement Project".
25. Price Schedule
See attachment.
26. Location Map
See attachment