STATEMENT OF WORK (SOW) AND

TECHNICAL SPECIFICATIONS

FOR

SOLAR POWER FOR SIGNAL HILL RADIO

RECEIVER

AT

BLACK CANYON OF THE GUNNISON NATIONAL PARK

I. DESCRIPTION OF SERVICES

Work effort consists of furnishing materials, labor, and equipment necessary to install an off-grid ground-mounted photovoltaic system at Black Canyon of the Gunnison National Park, located in Montrose County, Colorado. This contract is for a complete turnkey project, including system design and permitting and all materials, equipment, and labor necessary to install the system. The system must be capable of supplying continuous, uninterrupted power for the PTP 700 wireless broadband microwave system manufactured by Cambium Networks (see Attachment #3). There is currently no utility or power service at this location. The final work product shall be in conformance with all requirements found in this SOW.

A. Place of Performance: Location – The system will be installed at a location known as Signal Hill within Black Canyon of the Gunnison National Park (BLCA), a unit of the National Park Service (NPS) located in Montrose County in west-central Colorado, northeast of U.S. 50 and east of US 347 on NPS Black Canyon Road (15 miles northwest of Montrose, CO; see Attachments #1 and #2 for site location).

B. Bidder Requirements: Bidder must have a registered and active account in the System of Award Management (SAM) and be licensed through NABCEP to perform photovoltaic installation. A pre-bid meeting will be held on-site prior to award. Bidder attendance is highly encouraged. Contractor questions and answers from the meeting will be an amendment to the solicitation.

C. Site Conditions: The work is located in a remote area accessed by maintained roads. No power, water, or restrooms are provided on-site. Contractor personnel may not camp in the vicinity of the project. However, there is an established campground within BLCA and lodging in nearby Montrose. All vehicles and equipment shall be confined to site disturbance limits shown in Attachment #1. The area available for installation at the top of Signal Hill is approximately 100 feet by 100 feet, approximately level, and previously disturbed. No survey data is available for the site. Soil type at the site is generally stable and composed of a mixture of decomposed rock, clay and silt. Though excavation required for install is not extensive, soil is rocky and some rock is expected to be encountered during excavation.

D. Period of Performance: Performance time for this task order is 120 calendar days from the date “Notice to Proceed” is issued. Once the work is started, the Contractor is expected to proceed with the work in a continuous and diligent manner until the work is complete. Days of work are limited to Monday – Friday (Excluding Federal holidays) between the hours of 7:00 AM and 5:30 PM unless otherwise arranged in advance with the Contracting Officer.

• On-Site Investigation / Scoping Meeting (within 10 calendar days of award): Initiate and conduct an on-site investigation and meeting with the Government. The purpose of the meeting is to preview the site, review overall expectations for the site, and generally discuss plans for the design effort.

• Conceptual Site Design and Detailed Design Development of Site Elements (20 calendar days into performance): Provide an electronic copy of Conceptual Design documents for Government review. See Section 6 for requirements.

• Technical Requirements: See section III

II. GENERAL INFORMATION

1. PAYMENT

A. Bid price shall be one (1) lump sum amount that includes the cost of all labor, travel, equipment, and materials required to perform the work plus any and all costs associated with overhead, profit, etc.

2. GENERAL CONDITIONS

A. Scope of Services: The project includes furnishing all supervision, management, labor, travel, materials, and equipment. Construction equipment shall be in good working order and shall be operated safely at all times.

B. Safety and Liability: Government assumes no responsibility for injuries or damages suffered by Contractor, its officers, agents or employees, while engaged in the performance of this Contract. Contractor agrees to take reasonable measures to provide for the safety and security of its own workforce, and for the safety and security of all others present at the work site while engaged in the performance of this Contract. The contractor shall assume any liability for any injury incurred by contractor personnel while working on site.

C. Site Clean-up and Restoration: The contractor shall ensure the work site and areas around the work site are free of any debris and materials upon completion of work each day, as well as at the completion of the job. Contractor shall remove and properly dispose of all materials and equipment at the completion of the job.

D. Warranty: The Contractor warrants that the work performed under this Agreement conforms to the contract requirements and is free from any defect in equipment, material, design, finish, or workmanship performed by or the responsibility of the Contractor.

3. SUBMITTALS WITH BID

A. Bidder shall submit, with bid, information on any certifications pertaining to the work involved.

B. Manufacturer’s Product Data: Submit copies of the manufacturer’s descriptive data for all proposed equipment.

4. INFORMATION FOR BIDDERS

A. Map and site location for reference (Attachment #1) B. Vicinity Map (Attachment #2) C. PTP 700 Specification Sheet (Attachment #3)

III. TECHNICAL REQUIREMENTS

5. PROJECT COMPONENTS

• This is a new stand-alone system, and currently, there are no utility power sources at this location.

• Design and installation of a ground-mounted photovoltaic system (modules, microinverters, wiring, and breakers) able to provide sufficient power to sustain the PTP 700 radio device for 24/7/365, with adequate power contingency in the design to accommodate all solar efficiency variables such as cloudy days, seasonal variations, temporary snow coverage, and other environmental conditions that could potentially affect the solar power system.

• All system components shall comply with the Buy American Act (BAA) and shall be manufactured in the United States. For components not available domestically, exceptions must be approved by the NPS and are not guaranteed.

• System must be installed by a licensed NABCEP photovoltaic installer

• The module support structures shall be designed and constructed to provide a stable support system for the project's life. Module support structures shall meet all applicable codes and standards, including Montrose County requirements for wind and snow loading appropriate to the project's location and elevation.

• Installed grounding, wiring, and overcurrent protection consistent with current National Electric Code (NEC), International Residential Code (IRC), and International Energy Conservation Code (IECC)

• The design shall include a complete set of construction documents, including shop drawings, product data or specifications, cost estimate, commissioning plan, and schedule/performance time.

6. SITE ASSESSMENT AND PLAN PROPOSAL

A. On-Site Investigation / Scoping Meeting: Perform site investigation and gather data required for installation.

B. Submit Conceptual Site Design and Detailed Design Development of Site Elements design of proposed photovoltaic system to NPS.

a. Design components must include the following:

i. Site plan including location of proposed system components and overall dimensions

ii. Calculations demonstrating array and battery design performance characteristics

iii. Detailed product information on the photovoltaic array, inverter type, and mounting system and any other necessary system components, and specifications for equipment not covered by detailed product info.

iv. Shop drawings showing foundations and system wiring diagram

v. Design calculations for foundation, considering all applicable loading

7. SYSTEM COMPONENTS

A. Photovoltaic Array

a. Power generation capacity sufficient to supply the PTP 700 24/7/365.

b. Submit manufacturer’s product data for the system

c. A 15-year minimum warranty on modules

d. Submit calculations indicating the system's energy relative to the total energy demand for the PTP 700 microwave.

B. Mounting System

a. The structures shall be designed to allow easy replacement of any module.

b. The mounting system must be capable of withstanding snow and wind loads as provided in Montrose County building code and at minimum the following loads:

i. Wind speeds up to 100 mph

ii. Snow load of 20 psf

c. The module support structures shall be designed and constructed to provide a stable support system for the project's life. Module support structures shall meet all applicable codes and standards.

d. Foundation shall be appropriate strength concrete (spread or augured) utilizing galvanized or equivalent corrosion-resistant steel members.

e. The maximum support structure deflections shall prevent P.V. module and electrical system damage and shall not exceed allowable limits provided by the manufacturer and the IBC 2009 and ASCE 7-05 codes.

C. Microinverters

a. Inverter type with maximum power point tracking (MPPT) capabilities

b. Complies with limits expressed in IEEE 1547 and UL 1741

c. Built-in ground fault protection device (GFP).

d. Inverter efficiency shall be 97% minimum CEC efficiency.

e. Output current harmonics shall be <3%.

D. Electrical

a. Installed grounding, wiring, and overcurrent protection consistent with current National Electric Code (NEC), International Residential Code (IRC), and International Energy Conservation Code (IECC)

b. All above grade outdoor electrical conduits shall be PVC with NEMA 4 enclosures. All transitions to below grade conduit shall be PVC. Any deviation shall be reviewed and accepted by the Owner before proceeding. All electrical systems must meet applicable codes and standards to ensure proper and safe operation.

c. All A.C. and D.C. wiring shall meet NEC requirements and local codes.

d. Any fuses shall be readily accessible and replaceable.

e. All wires shall have a label affixed to each end stating the origination point for diagnostic and troubleshooting purposes.

f. As part of the Contractor's deliverables before Final Completion, Contractor shall provide the Owner a database including all module serial numbers sorted by array and harness.

g. Electrical Equipment Enclosures- Control cabinets, pull boxes, and junction boxes shall be per NEMA Standards and type number and shall be suitable for the location conditions.

h. The Contractor shall submit cable data sheets and Project cable schedule to the Owner for approval for each application before procuring the cable.

i. The Contractor shall prepare as-built shop drawings as may be necessary to meet the jurisdictional government agencies' standards. At a minimum, Contractor shall prepare as-built shop drawings for Government’s record, which contain as-built site dimensions, etc., and any variation from the design shop drawings.

E. Signage

a. Placards must be per NEC regulations

8. COMMISSIONING AND INSPECTION

A. All commissioning activities shall be executed under a phased approach, as identified below. Each phase's activities shall be documented and submitted to the Government for review, acceptance, and documentation.

1. Acceptance Phase

a. Physical Inspections

b. O&M Manual Review

c. Warranty Review

d. Commissioning Manual

2. Operational Phase

a. Performance Verification

b. Operation

B. System inspection must be completed following the Commissioning Plan, as approved by the Government.

a. Verify proper operation in all modes of system operation by testing. Verify proper operation under a wide range of conditions to verify energy delivery calculated for those conditions.

b. Comply with ASTM E1799- Standard Practice for Visual Inspections of Photovoltaic Modules.

c. The Contractor shall successfully run both Power Capacity Tests (D.C. and A.C.

simultaneously) following the approved Commissioning Test Procedures for such test.

d. The Owner shall approve the Power Capacity Test period and data collection intervals before the testing execution.

e. If the corrected output measured at the sum of measurements at the inverter input is equal to or greater than the corresponding Power Capacity Guarantee and assuming the other requirements established to run the applicable Power Capacity Test successfully have been met, then the Power Capacity Test will be deemed to have been successfully run.

f. At the completion of the project, the Contractor shall turn over to the Owner a full set of As-Built shop drawings that depict the final system as approved and tested.

I. Description of Services
II. General Information
1. Payment
2. General Conditions
3. Submittals with Bid
4. information for bidders
III. Technical Requirements
5. Project Components
6. Site Assessment and Plan Proposal
7. System Components
8. Commissioning and Inspection