Attach 1_ Questions_Answers_20240510.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- A036666
About this file
This document contains questions and answers related to a federal contract opportunity for architect-engineering (A-E) services to design a shower/toilet facility for Joint Base Elmendorf-Richardson (JBER) in Alaska. The contract will be awarded on a firm-fixed-price basis, with the design to be completed by April 2025. The selection criteria include professional qualifications, specialized experience, capacity to perform, past performance on DoD and other contracts, and knowledge of the local area. Firms must submit SF 330 Part I and II by May 20, 2024. The contract is open to small businesses under NAICS code 541330, with a size standard of $25.5M. The document provides clarification on where to include past performance narratives within the SF 330 form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 1-Questions_Answers_20240515.xlsx | XLSX spreadsheet | |
| AE Synopsis Toilet_Shower Facility_Version 3.pdf | ||
| Questions_Answers_20240513.xlsx | XLSX spreadsheet | |
| Attach 2 -AE Synopsis Toilet_Shower Facility_Version 2.pdf | ||
| Attach b-JBER CAD GIS Record Drawing As Built Standard.pdf | ||
| Statement of Work.pdf | ||
| AE Synopsis Toilet_Shower Facility.pdf | ||
| Attachment a_Form 66.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Notice ID A036666 Questions and Answers dated 10 May 2024 | |||||
| Item #1 | Attachment | Attachment Section | Discussion/Information | Question | Response |
| 1 | Synopsis/RFQ | Para 3(a)(iv)(2)(a) Past perfomance on DoD and other contracts | Document Submission within SF330 | Within the AE Synopsis Toilet_Shower Facility document, section iv) Past performance on DoD and other contracts, under (2)(a) states that sample projects need to be in narrative form not to exceed two pages, with no more than three additional pages of supporting illustrations or photographs. Please clarify where within the SF330 document the project narratives are to be included for firms electing not to use the provided five-page Past Performance Questionnaire Template. | Each of he project narratives included for firms electing not to use the provided five-page Past Performance Questionnaire Template will be submitted to Section H in the SF330. |
| 2 | Synopsis/RFQ | Para 3(a)(iv)(2)(a) Past perfomance on DoD and other contracts | Section H page limits | Since Section H has been limited to 5 pages, do you expect the narrative project descriptions to be included in Section H? If so, will they be counted against the 5-page limit? | |
| Submit example design projects in narrative format in Section H. Each design project example narrative shall not exceed two pages, with no more than three additional pages of supporting illustrations or photographs. These page limits apply to firms electing not to use the provided five-page Past Performance Questionnaire Template. Each design project example narrative submitted will not be counted against the five (5) – page limit in Section H. |
File details come from the government source that posted it. Updated .