This is a Statement of Work (SOW) for the Minnesota Air National Guard Headquarters 133rd Airlift Wing, soliciting a Snap-On Automated Tool Control (ATC) Portal system. The requirement includes one ATC Portal system with RFID technology, a compatible handheld RFID scanner kit, and full turnkey installation services. Specific technical requirements mandate the system must provide 24/7 tool tracking, use 100-240VAC power, have a minimum 48" walkway, include a touch display, and come with at least 500 RFID tags.
The solicitation (W50S7E-25-Q-0007) is 100% set aside for small businesses under NAICS 332216, with a business size standard of 750 employees. The government plans to award a firm-fixed price contract based on best value evaluation criteria including price, technical acceptability, equipment capabilities, delivery time, and past performance. Quotes are valid through September 30, 2025, with contract award contingent on fund availability. Vendors must be registered in SAM.gov and submit quotes via email to the Contracting Officer, with multiple and innovative solutions encouraged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02 Brand Name JA ATC Tool Portal Signed (2)_Redacted.pdf | ||
| B01 W50S7E25Q0007 Solicitation ATC Tool Portal.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINNESOTA AIR NATIONAL GUARD
HEADQUARTERS 133RD AIRLIFT WING (AMC)
SAINT PAUL MINNESOTA
5 May 2025
STATEMENT OF WORK
1. Project Title: ATC Portal
| 2. Project Location: | 133d Airlift Wing |
| Minnesota Air National Guard Base | |
| 682 General Miller Dr, Saint Paul, MN 55111-4112 |
3. General Scope: The Contractor shall provide an automated tool control portal, handheld scanner kit and installation services needed for monitoring tool movement in and out of a controlled area for better asset management.
4. Detailed Requirements:
A. Tool Control System Snap On ATC Portal (brand name specific) 1 EA
· Must be compatible with existing ATC Toolboxes Snap-On L5ARC540BO
· Uses radio frequence identification (RFID) readers to track movement of tools
· Uses L5 CONNECT software
· Must provide for automated asset control for Aircraft Hangar’s equipment room tool crib.
· Provide 24-7 tool tracking and availability
· Must use 100-240VAC 50/60HZ, 5A/2.5A MAX
· Must provide for a walkway space of at least 48"
· Provide a touch display for easy tool issue and receipt
· Must include at minimum 500 RFID tags to allow for the set up and tracking of all items in tool cribs
B. Scanner Kit (brand name specific) 1 EA
· Handheld RFID scanner kit
· Must be compatible with Snap On Level 5 tool control system
C. Installation, 1 EA
· Full Turnkey Tool control system ATC Portal installation per manufacturer instructions
· Must include technical support for initial installation and after
5. Required training for contract employees requiring 133rd base access for installation purposes:
A. Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor or completing JS ‐ US007‐Level I Antiterrorism Awareness Training (2 hrs) on Joint Knowledge Online at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf. Tracking for each contractor or subcontractor employee is the responsibility of the KO or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the KO within 15 calendar days after completion of training by each employee or subcontractor personnel.
6. Warranty: All materials shall be warranted to be in compliance with this statement of work and to the highest standards of the industry. Minimum warranty of 1 year.
Refer technical questions and information to:
MSgt Daniel Byler Contracting Specialist 631 Minuteman Drive St. Paul, MN 55111 612-713-2613 Daniel.byler@us.af.mil image1.png