A02.12 PWS CMS User Training draft dated 2026.04.20.docx

DOCX document 73 KB Posted

Attached to
USACE Construction Management System User Training Federal contract opportunity
Solicitation number
W912HQ26S0026
Issued by
Department of the Army Corps of Engineers National Capitol Region Humphreys Engineer Center Support Activity

About this file

This is a Performance Work Statement (PWS) for USACE Construction Management System User Training services. The U.S. Army Corps of Engineers (USACE) requires comprehensive training delivery to support the transition from the Resident Management System (RMS) to the new Construction Management Platform (CMP). Training is anticipated to commence in January 2027 and continue through the period of performance ending March 31, 2028, with an estimated target audience of 25,000 personnel including USACE staff, external contractors, and stakeholders.

The primary deliverables include five core tasks: (1) Train-the-Trainer training for up to 70 instructors in Kansas City, Missouri during October/November 2026 with payment based on trainer completion percentage; (2) In-person instructor-led training delivery at various USACE locations with payment based on completed sessions/hours; (3) Virtual instructor-led training delivery compatible with Microsoft Office Suite, meeting Section 508 compliance (WCAG 2.1 AA) standards, with payment based on completed sessions/hours; and (4-5) Optional Tasks 4 and 5 providing additional virtual training capacity and post-deployment sessions with six subtasks each exercisable through 2028. The contractor must maintain trainer-to-learner ratios not exceeding 1:15 for Construction workshops and 1:20 for other virtual workshops, manage a web-based trainee registration system, develop and maintain training materials, achieve a minimum 90% course completion rate and 3.5 out of 5.0 student satisfaction rating, and provide qualified instructors with professional certifications in adult learning and minimum three years of training facilitation experience. The contractor shall furnish instructor computers, Microsoft software licenses, virtual training platforms, secure internet access (minimum 25 Mbps), and audio-visual equipment meeting specified standards, while the Government furnishes training facilities, equipment, instructional materials, and CMP system licenses. Travel for multiple in-person trainers to various USACE locations will be reimbursed at actual cost per Joint Travel Regulation guidelines without contractor profit or fee assessment.

View the file

Other files for this federal contract opportunity

Other files attached to USACE Construction Management System User Training, newest first.
File Type Posted
A02.12 PWS Attachment 2 - Training Session Parameters dated 2026.04.15.pdf PDF
A02.12 PWS Attachment 1 - End User Training Schedule dated 2026.04.15.pdf PDF
A02.10 Questionnaire for CMS User Training.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 APR 26

USACE Construction Management System User Training Performance Work Statement (PWS)

Program support for establishment of U.S. Army Corps of Engineers (USACE) Construction Management System Training.

The Headquarters, USACE (HQUSACE) Engineering and Construction Division is requesting Contractor support services for enterprise Construction Management System User Training. This is managed by the Headquarters USACE Construction Management Innovation Office (CMIO) and the Construction Management Technology Modernization Office (CM TMO).

This Performance Work Statement (PWS) outlines the requirements for comprehensive training services to enhance personnel skills and knowledge, improve performance, ensure compliance with industry standards, and support staff professional development. The Contractor is expected to thoroughly understand and comply with all requirements outlined herein.

Background The Resident Management System (RMS) is a USACE application used to document and manage USACE contracts worldwide. RMS will be replaced by the new Construction Management Platform (CMP) application. The launch of the new CMP requires comprehensive training for engineering, construction, project management, and support personnel, as well as external contractors and stakeholders to ensure a smooth transition and full user adoption.

At the conclusion of the training, participants will be able to:

· Navigate CMP interface with confidence

· Effectively log interactions and track action items

· Utilize applications from the CMP dashboard

Scope The Contractor will provide services to deliver USACE Construction Management System Training through instructor-led workshops, both in-person and virtual. Training delivery is anticipated to commence in January 2027. The Contractor will provide all resources necessary for effective training delivery, including qualified instructors, logistical support, and adherence to established training standards.

1. Program Management: Provide comprehensive program management support, including regular engagement with the USACE CM TMO, Contractor Construction Management System Developers, and Training Content Creators. Specific tasks include maintaining a project schedule, facilitating communication and coordination between stakeholders, managing trainee scheduling and registration, and submitting monthly progress reports.

2. Facilitator Standards Compliance: Adhere to Construction Management System Training facilitator standards, outlining qualifications, training requirements, and align with performance expectations.

3. Train-the-Trainer Participation: Participate in and successfully complete train-the-trainer training for the Construction Management Platform, as provided by the System Developers.

4. Target Audience Training Delivery: Provide training to all members of USACE construction, support teams, and external users. Estimated training population is 25,000 personnel, delivered virtually and in-person at various USACE locations. Trainer-to-learner ratio will not exceed 1:15 for Construction workshops and 1:20 for other virtual workshops unless a different limit is mutually agreed upon for a specific workshop. Training will be delivered in English. Training will cover CMP applications necessary to perform various functions and include system navigation, data entry procedures, reporting functions, and best practices for efficient utilization of each application.

5. Materials: CMP Developers will provide facilitator guides, presentation slides, and reference materials. The Contractor is responsible for adapting these materials to specific audience needs if necessary, ensuring accessibility, and maintaining a repository of updated materials. Provide feedback to the Government regarding training materials that require updates by the CMP Developers due to changes in system configuration or where trainees have trouble understanding and following the training materials.

6. Training Performance Evaluation: Evaluate Training Performance measures and provide recommendations for continuous process improvement.

General Requirements

The Contractor must meet the following performance requirements and standards. The Government will evaluate Contractor performance based on these criteria.

1.1 Non-Personal Services

The contractor shall provide strictly non-personal services and contractor employees are not subject to direct supervision and control by the Government. The contractor shall advise and support the Government but shall not make final decisions or certifications on behalf of the Government nor perform any inherently governmental functions. The contractor and its employees shall not represent the government nor appear to represent the government in performance of these contract services. Contractor personnel shall clearly identify themselves as contractor employees in all interactions during contract performance.

1.2 Place of Performance

In-person training will occur at various training locations across the USACE enterprise. There is no fixed location for performance of virtual training and completion of administrative tasks.

1.3 Period of Performance

The period of performance is from date of Notice to Proceed (NTP) through 31 March 2028. Training Facilitation for USACE Districts will continue over the course of the period of performance as the CMP system is deployed in phases.

1.4 Other Direct Costs (ODCs)

1.4.1 Materials

There is no separate reimbursement for materials purchased under contract. Materials purchased under this contract will remain the property of the Contractor.

1.4.2 Travel

The Contractor shall provide services necessary to plan and schedule travel and travel shall be reimbursed at actual cost in accordance with the Joint Travel Regulation and the limitations set forth in RFO FAR 31.205-46 (Commercial Organizations). The appropriate Government Official, Quality Assurance Personnel or Contracting Officer will approve travel. All invoices for travel shall be accompanied by supporting receipts. The Contractor shall not assess profit or fee against travel.

Performance Requirements and Standards

1.5 Task 1: Train-the-Trainer Training

Scope: Complete in-person Requirement: Undergo Train-the-trainer training facilitated by the software developers.

Standard: Fully equipped to successfully provide training to the USACE enterprise in-person across USACE district locations and in a virtual setting. The train-the-trainer training, for up to 70 trainers, will be provided in-person at the Kansas City, Missouri USACE District location in the October/November 2026 timeframe. Up to 40 hours of instructional time per trainer may be required. Training of any replacement trainers will be the responsibility of the Contractor.

Requirement: Inform engaging and effective curriculum based on train-the-trainer training that aligns with identified training needs and incorporates adult learning principles.

Standard: Curriculum to guide training sessions will be developed by software developers with feedback from contract instructors to include clear learning objectives, interactive exercises, assessments, and relevant case studies.

Payment: Payment will be allowed based on the percentage of trainers that have completed train-the-trainer training when compared to the total number of trainers to be trained.

1.6 Task 2: Training Delivery – In-person

Requirement: Deliver high-quality instructor-led training sessions required in Attachment 1 in a professional and engaging manner. Deliver instruction in USACE designated and coordinated facilities. Instructional methods must be engaging and incorporate a variety of learning styles.

Standard: Instructor-led training sessions must be delivered by qualified and experienced instructors with expertise in the subject matter.

Requirement: Deploy interactive and accessible learning modules that are compatible with USACE's in-person capabilities. Facilitate practical exercises, simulations, and case studies to reinforce learning and develop practical skills.

Standard: Learning modules must be delivered with provided curriculum and must meet Section 508 compliance (WCAG 2.1 AA) standards, verified through automated accessibility testing tools and manual review.

Requirement: Provide all necessary training materials, including participant guides, handouts, and online resources to target audience prior to training or following up from training course as appropriate.

Standard: Training materials must be accurate, up-to-date, with the proper materials provided to the proper group at the appropriate time.

Payment: Payment will be allowed based on the percentage of completed training sessions/hours when compared to the total training sessions/hours required for completion of the task.

1.7 Task 3: Training Delivery – Virtual

Requirement: Deliver high-quality instructor-led training sessions required in Attachment 1 in a professional and engaging manner. Deliver instruction in a virtual environment. Instructional methods must be engaging and incorporate a variety of learning styles.

Standard: Instructor-led training sessions must be delivered by qualified and experienced instructors with expertise in the subject matter. Instructor network connection must be of sufficient bandwidth and latency to effectively facilitate course instruction.

Requirement: Deploy interactive and accessible learning modules that are compatible with USACE's virtual delivery capabilities (Microsoft Office Suite). Facilitate practical exercises, simulations, and case studies to reinforce learning and develop practical skills.

Standard: Learning modules must be delivered with provided curriculum and must meet Section 508 compliance (WCAG 2.1 AA) standards, verified through automated accessibility testing tools and manual review.

Requirement: Provide all necessary training materials, including participant guides, handouts, and online resources to target audience prior to training or following up from training course as appropriate.

Standard: Training materials must be accurate, up-to-date, with the proper materials provided to the proper group at the appropriate time.

Payment: Payment will be allowed based on the percentage of completed training sessions/hours when compared to the total training sessions/hours required for completion of the task.

1.8 Task 4: Training Delivery – Additional Virtual Sessions and Reserve Instructors During Deployment (Optional) Note: This task includes six (6) optional subtasks. Each option applies to the date ranges specified. Options may be unilaterally awarded individually no later than the timeframes outlined below unless mutually agreed. Options may or may not be exercised sequentially:

Subtask 4.1, January 3-February 27, 2027, award by December 1, 2026
Subtask 4.2, February 28-May 1, 2027, award by February 1, 2027
Subtask 4.3, May 2-July 3, 2027, award by April 1, 2027
Subtask 4.4, July 4-September 4, 2027, award by June 3, 2027
Subtask 4.5, September 5-October 30, 2027, award by August 3, 2027
Subtask 4.6, October 31-December 18, 2027, award by September 30, 2027

Scope: For each option, the Contractor shall provide weekly instructor capacity to deliver up to an additional 70 hours of training sessions. This additional instructor capacity must be in excess of the capacity required to provide baseline training sessions outlined in Attachment 1 and may not be utilized to cover instructor absences. The Government will direct the training sessions that the additional training capacity will support a minimum of 30 calendar days before the training sessions are scheduled to begin.

Requirement: Deliver high-quality instructor-led training sessions in a professional and engaging manner. Deliver instruction in a virtual environment. Instructional methods must be engaging and incorporate a variety of learning styles.

Standard: Instructor-led training sessions must be delivered by qualified and experienced instructors with expertise in the subject matter. Instructor network connection must be of sufficient bandwidth and latency to effectively facilitate course instruction.

Requirement: Deploy interactive and accessible learning modules that are compatible with USACE's virtual delivery capabilities (Microsoft Office Suite). Facilitate practical exercises, simulations, and case studies to reinforce learning and develop practical skills.

Standard: Learning modules must be delivered with approved curriculum and must meet Section 508 compliance (WCAG 2.1 AA) standards, verified through automated accessibility testing tools and manual review.

Requirement: Provide all necessary training materials, including participant guides, handouts, and online resources to target audience prior to training or following up from training course as appropriate.

Standard: Training materials must be accurate, up-to-date, with the proper materials provided to the proper group at the appropriate time.

Payment: Payment will be allowed based on the percentage of completed training sessions/hours when compared to the total training sessions/hours required for completion of the task.

1.9 Task 5: Training Delivery – Post Deployment Training Sessions (Optional) Scope: This task includes six (6) optional subtasks. Each subtask applies to the date ranges specified. The subtasks may be unilaterally awarded individually no later than the timeframes outlined below unless mutually agreed. Subtasks are not required to be awarded sequentially and following subtasks may be awarded without a preceding subtask awarded:

Subtask 4.1, January 2-15, 2028, award by December 1, 2027
Subtask 4.2, January 16-29, 2028, award by December 15, 2027
Subtask 4.3, January 30-February 12, 2028, award by December 31, 2027
Subtask 4.4, February 13-26, 2028, award by January 13, 2028
Subtask 4.5, February 27-March 11, 2028, award by January 27, 2028
Subtask 4.6, March 12-March 25, 2028, award by February 11, 2028

Scope: For each subtask, provide weekly instructor capacity to deliver up to 140 hours of virtual training sessions. The Government will direct the training sessions that the additional training capacity will support a minimum of 30 calendar days before the training sessions are scheduled to begin.

Requirement: Deliver high-quality instructor-led training sessions in a professional and engaging manner. Deliver instruction in a virtual environment. Instructional methods must be engaging and incorporate a variety of learning styles.

Standard: Instructor-led training sessions must be delivered by qualified and experienced instructors with expertise in the subject matter.

Requirement: Deploy interactive and accessible learning modules that are compatible with USACE's virtual delivery capabilities (Microsoft Office Suite). Facilitate practical exercises, simulations, and case studies to reinforce learning and develop practical skills.

Standard: Learning modules must be delivered with approved curriculum and must meet Section 508 compliance (WCAG 2.1 AA) standards, verified through automated accessibility testing tools and manual review.

Requirement: Provide all necessary training materials, including participant guides, handouts, and online resources to target audience prior to training or following up from training course as appropriate.

Standard: Training materials must be accurate, up-to-date, with the proper materials provided to the proper group at the appropriate time.

Payment: Payment will be allowed based on the percentage of completed training sessions/hours when compared to the total training sessions/hours required.

1.10 Training Session Parameters

Trainings for different user groups have unique curriculum, delivery methods, and durations. Reference Attachment 1 for required training sessions by week. Reference Attachment 2 for training session parameters for each user group or session type. The weekly quantity of each session type and parameters may be varied upon mutual agreement between the Government and Contractor, provided the overall number of trainer hours required to deliver trainings on the weekly basis remain similar. Draft virtual training session dates and times for each week must be established by the Contractor and communicated to the Government Point(s) of Contact (GPOC) a minimum of 60 calendar days prior to the start of each session (except for sessions required by contract options that are exercised fewer than 60 calendar days before performance start). Sessions must consider the time zones of users to be trained. The Government will review and collaboratively work with the Contractor to resolve scheduling issues with draft sessions, if any. The final session schedule must be provided to the Government for approval a minimum of 45 calendar days prior to the start of sessions covered in the session schedule. The Government will provide the dates, times, locations, and trainee rosters for in-person sessions.

1.11 Trainee Registration and Session Coordination

For Tasks 2-5, the Contractor is responsible to manage trainee enrollment for training sessions and otherwise coordinate and manage the trainee roster for each training session. The Government will provide the initial trainee rosters for in-person sessions.

1.11.1 Trainee Registration

1.11.1.1 Registration Mechanism and Process

Provide a web-based interface, accessible to Department of War and contractor personnel, to allow for trainee registration for each virtual training session. Session registration must open a minimum of 30 days before the start of each session. The interface must be user-friendly and include a list of upcoming sessions available to each trainee. The upcoming session list must provide the capability to be sorted by session type/user group, start date, start time, and time zone. Remaining seats available must also be shown. Registration for a session should close when the maximum number of trainees in the session has been reached and an additional ten trainees waitlisted, or the business day prior to the start date of the session. Provide an email to registered trainees after they have successfully submitted the registration request for the session. Provide an Outlook invitation to trainees with confirmed seats within two business days after confirming their registration. Provide step-by-step registration instructions to the GPOC for distribution to trainees. Provide the ability for a user to cancel their session registration.

1.11.1.2 Information Collected During Registration

In addition to any Contractor required fields, the registration must capture the following information for each trainee. Data fields must be dropdown/selectable to the maximum extent possible, and content for selectable data fields will be provided post-award:

1. Name (First/Last)

2. Email address (if email address contains “@USACE” then automatically populate “Organization” as “USACE”)

3. Organization

4. USACE District, or district primarily supported

5. Position/role (list of selectable positions/roles to be provided post-award)

6. Accessibility needs, if any

1.11.1.3 Session Registration Restrictions

Only trainees with a USACE email address may be allowed to register for an internal USACE training session. Registration for virtual internal USACE training sessions must prioritize trainees from the districts where CMP deployment just occurred or will be occurring in the next deployment phase, and trainees from other districts should be waitlisted until one week before course start when they may be moved into any open seats. Virtual sessions for the “Construction” user group must only allow trainee registration after inputting a Contractor-provided code or password unique to each session, in coordination with the GPOC, to ensure registration priority. The GPOC will control distribution of the code or password to potential trainees.

1.11.2 Session Roster Development

Utilize trainee registration information to develop the roster for each session. Provide a mechanism for trainees to cancel their registration and for waitlisted trainees to be moved into a session when a seat is available. Communicate session details and logistics to trainees a minimum of five business days before each session and again one business day before the session start, after registration for the session has closed.

1.11.3 Session Roster Coordination

Maintain current session rosters in a live database or similar tool easily accessible and viewable by the GPOC and up to 200 other Government personnel with need-to-know. The database or similar tool must also have the capability to populate a primary and alternate CMP administrator for each trainee based on the district the user identified during registration. A list of CMP administrators for each district will be provided post-award.

1.11.4 Session Completion Notification

Provide an email notification to each trainee, with a copy to the primary and alternate CMP administrators associated with the trainee, after they have successfully completed a training session. The email must state the trainee’s name, session type and number, training dates, and duration of the session (hours). Update the trainee’s status in the Government-accessible database or similar tool reflecting session completion for each trainee within two business days of session completion.

Note: Some session types will allow a subset of trainees to be considered complete with training after completing a specific portion of the session. The session completion notification and database or similar tool must reflect the parameters of the portion attended if the trainee did not attend the full session.

1.11.5 Session Timing

Sessions will typically be scheduled from 0800-1700 local time for in-person trainings but may vary slightly depending on location needs. Virtual sessions are anticipated to be scheduled over a wide range of times to provide flexibility for trainees located in various time zones. Anticipate approximately 20% of sessions will be scheduled in time zones outside the Continental United States (CONUS).

1.12 Travel

This contract requires multiple in-person trainers to travel to various USACE locations, both CONUS and outside CONUS, to facilitate training with the target audience. Training locations will be determined and communicated to the Contractor a minimum of eight weeks in advance of the training session. For sequential trainings, scheduled to be held in the same location or part of the world, the expectation is the same trainer(s) will facilitate the sequential trainings. Virtual trainers will not require travel to facilitate user training but must attend the initial train-the-trainer training in-person.

1.13 Instructor Qualifications

Instructors must possess professional certifications to facilitate adult learning (e.g., Certified Professional in Training Management (CPTM), Certified Professional in Training Development (CPTD), or equivalent) and demonstrated experience in delivering effective training. Instructors must possess a minimum of 3 years of experience in training facilitation and a proven track record of delivering effective training, demonstrable through documented training evaluations. Resumes of proposed instructors must be submitted for Government approval at least 45 calendar days prior to train-the-trainer training commencement. Government approval will be based on qualifications and experience.

1.14 Instructor CMP Access

The Government will provide CMP licenses for instructor login to CMP for training facilitation purposes. Instructors must register through the Army’s Identity, Credential, and Access Management (ICAM) platform to access CMP. Instructors must provide their name, physical address, email address, and phone number to obtain access. Step-by-step registration instructions will be provided after award, with registration steps initiated by a Government sponsor.

1.15 Key Performance Indicators

1.15.1 Course Completion Rate

A minimum course completion rate of 90% is required. Acceptance will be determined by a review of training attendance records.

1.15.2 Student Satisfaction

A minimum average student satisfaction rating of 3.5 out of 5.0, based on post-training surveys, is required. Surveys must include both quantitative (rating scale) and qualitative (open-ended feedback) questions. Contractor analysis of qualitative feedback must be conducted to identify areas for improvement. Provide a proposed survey template to the GPOC for review and approval prior to use.

1.15.3 Instructor Performance

Participant evaluations must consistently rate instructor performance at or above 3.5 out of 5.0. Evaluations must be collected after each training session and reviewed by the GPOC.

Deliverables and Delivery Schedule All electronic files, documents, photographs, graphics, computer files developed by the Contractor (and any subcontractors) in completing the requirements of the PWS are government property and may be used in any appropriate action. At the conclusion of this task order Contractor must provide all electronic files via DoD Safe (a Government Representative will provide a link and instructions on using this service) and they will become government property. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

Provide one electronic/digital copy of all documents in each submittal and final deliverable organized clearly or other reasonable format as specified by the GPOC. To the maximum extent possible, the Contractor must use standard digital file formats that can be imported and read in Microsoft Word (text and processing files) or Microsoft Excel (spreadsheets and graphics), or Adobe PDF (narrative reports). The Contractor must work with the government to resolve any file compatibility problems.

Acceptance of deliverables must be based on the following criteria:

· Compliance with the performance requirements and standards outlined in this PWS

· Accuracy and completeness of deliverables

· Timeliness of delivery

· Satisfaction of the GPOC and Government Representatives

· Effectiveness of training delivery

· Participant satisfaction and feedback

· Achievement of training objectives

Deliverables that are unorganized, mislabeled, or not in compliance with specified format will be returned to the Contractor for immediate correction and re-submission. Submit deliverables using an expeditious through electronic methods as coordinated with the GPOC.

Deliverable
Description
Frequency
Submission Method
Acceptance Criteria
Timing
QUALITY CONTROL PLAN
Quality control plan
Initial submission with updates as necessary
Email to Government Representative
Plan includes sufficient information to manage quality of training and other deliverables
Within 30 days of NTP
Work Plan
Plan, including schedule, describing Contractor’s approach to meeting requirements and ensuring sufficient training staff will be available to meet requirements
Initial submission with updates as necessary
Email to Government Representative
Plan includes sufficient information to ensure contract requirements are met with minimal risk to successful performance
Within 30 days of NTP
Instructor Resumes
Current resumes of all instructors to deliver training.
Once, prior to Train-the-Trainer training
Email to Government Representative
Resumes demonstrate qualifications and experience relevant to the course content.
45 days prior to Train-the-Trainer training start
Weekly Progress Reports
Summary of training progress, student attendance, challenges encountered, and planned activities for the next four weeks.
Weekly, throughout course delivery schedule
Email to Government Representative
Report is complete, accurate, and submitted on time. Includes key metrics (e.g., student attendance, module completion rates).
Every Monday following the reporting period
TRAINING EVALUATION REPORTS
Summary of trainee feedback and recommendations for improvement, by user group
Monthly
Email to Government Representative
Report is complete, accurate, and submitted on time. Includes key information.
Before the 15th of the month following the reporting period
TRAINING COMPLETION REPORTS
Complete list of trainees engaged, by user group, during the reporting period including completion record
Monthly
Email to Government Representative
Report is complete, accurate, and submitted on time. Includes key information.
Before the 15th of the month following the reporting period
training delivery
Deliver training to USACE audience in in-person and virtual settings
Training classes vary from hours to days-long
In-person and virtual training facilitation
Training is complete. Participants meet 90% completion criteria. Participants can effectively utilize the new CMP interface.
Ongoing throughout contract period of performance
Final Report
Comprehensive report summarizing overall contract performance, lessons learned, and recommendations for improvement.
Upon Contract Completion
Email to Government Representative
Report is comprehensive, well-written, and includes all required information. Demonstrates achievement of contract objectives.
Within 30 days of contract completion

Performance Requirements Summary

Standard
Acceptable Quality Level
Incentive or Remedy
Complete/Relevant (All statements)
100% of the time
Re-perform/correct at no cost to the Government.
Compliant with applicable standards
100% of the time
Re-perform/correct at no cost to the Government.
Credible and/or repeatable
100% of the time
Re-perform/correct at no cost to the Government.
Comprehensive
100% of the time
Re-perform/correct at no cost to the Government.
Deliverables completed in accordance with schedule
95% of the time
Early identification of problems and/or corrective actions. Report to gov’t within 2 days of discovery.
90% of the time
Re-perform/correct at no cost to the Government.
Identify trends and areas of improvement
90% of the time
As described in task order PWS
Mitigates risk
100% of the time
As described in task order PWS
Identifies Corrective Actions
100% of the time
As described in task order PWS
Operational/Effective
100% of the time
Re-perform/correct at no cost to the Government.
Operationally relevant
100% of the time
As described in task order PWS

Recommendations are Implementable

95% of the time
Correct or revise at no cost to the Government.

Materials This section defines the responsibilities regarding materials, equipment, and information required for contract performance.

1.16 Government Furnished Equipment (GFE)/Government Furnished Information (GFI):

The Government will furnish the following to the Contractor:

· Instructors, materials, and facilities for Train-the-Trainer Training

· Access to the learning modules, course outlines, and training material

· Access to relevant documents and publications

· Training materials (electronically: participant guides, handouts, etc.)

· Audio-visual equipment for in-person instructor-led training sessions*

· Training facilities for in-person instructor-led training sessions

· Government Representatives to serve as the primary points of contact for the contractor

· CMP system user licenses for trainers to facilitate student training

*The Government will provide GFE in good working order. The Government retains responsibility for maintenance and repair of GFE. The Contractor must promptly report any malfunctions.

Access to GFI will be granted on a need-to-know basis and must be governed by applicable security regulations. The Contractor must be responsible for loss or damage to GFE/GFI while in its possession, except for reasonable wear and tear.

1.17 Contractor Furnished Property (CFP):

The Contractor must furnish all necessary equipment, software, and materials to perform the work under this contract. This includes but is not limited to:

· Instructor Computers

· Microsoft software licenses (specifically Microsoft Office Professional Plus and Microsoft Teams). The Contractor must ensure all software licenses are commercially valid and compliant with all applicable terms and conditions.

· Virtual training platform accessible to all trainees and from the Government network.

· Secure internet access with a minimum bandwidth of 25 Mbps compliant with DoD 8500.01, Cybersecurity.

· Project management tools and software, subject to Government approval to ensure compatibility with USACE systems.

· Audio-visual equipment for virtual instructor-led training sessions meeting the following minimum standards: 1080p webcam resolution, noise-canceling microphone, and reliable screen-sharing capabilities.

Other Requirements

1.18 Identification of Contractor Employees

All Contractor personnel attending meetings and working in other situations where their Contractor status is not obvious to third parties must identify themselves by name and company affiliation when presenting briefings, conducting or attending meetings, and trainings, to include proper marking of signature blocks in correspondence, to avoid creating that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.19 Security and Safety

1.19.1 General security requirements and guidance

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.19.2 Antiterrorism (AT) Level I Training

All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

1.19.3 Physical Security and Access Control Requirements

All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed.

1.19.4 Security Requirements for Contract Performance Outside the US For contract performance requirements that involve services or delivery in a foreign country, the Contractor shall comply with the requirements of DFARS clause 252.225-7043. For performance requirements that involve contract personnel accompanying or supporting US Armed Forces deployed outside the US, the Contractor shall comply with the requirements of DFARS clause 252.225-7040. Contract personnel accessing DoD or other federal facilities outside the US shall comply with applicable Status of Forces Agreements and Geographic Combatant Command requirements. Prior to contract personnel traveling outside the US, the Contractor shall provide documentation of AT, OPSEC, and other required training to the Government representative. Additionally, contract personnel shall comply with requirements specified in the DoD Foreign Clearance Guide, including country and theater clearance processes.

1.19.5 Pre-screen Candidates Using E-Verify Program

Contractors shall comply with the requirements set forth in RFO FAR clause 52.222-54 Employment Eligibility Verification and RFO FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with RFO FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

1.19.6 Safety

Contractor Compliance: The contractor and its subcontractors must comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements must be incorporated into the contractors’ safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation must participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.

Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving government property damage or injury to government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant KO, COR, and/or other applicable members within four (4) hours of all mishaps or incidents. The government person notified by the contractor will in-turn notify the Safety office.

Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant KO, the COR, and/or the cognizant program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is completed.

1.20 Quality Control/Quality Assurance

1.20.1 Quality Control (QC)

The Contractor shall develop a quality control plan (QCP) and implement a quality control program to satisfy the specific requirements of this contract. An optimal QCP shall identify potential problem areas and evolve over the life of the contract. The Contractor shall provide the QCP to the KO and COR for approval no later than 30 calendar days after contract Notice to Proceed. The Contractor shall update the QCP as required and provide copies to the KO and COR for approval.

1.20.2 Quality Assurance (QA)

The Government will monitor the Contractor's performance under this contract in accordance with the Government’s quality assurance surveillance plan (QASP). The QASP defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds). The Government has the right to conduct inspections and performance evaluation at any time and at any place where contract performance occurs. If any aspect of the performance is not in conformance with the requirements of this contract, the Government has the right to issue to the Contractor a Contract Discrepancy Report (CDR). The Contractor shall explain in writing why performance was not in conformance with the requirements of the contract, how performance will be returned to conformance, and how recurrence of the problem will be prevented in the future. The Contractor shall complete and return the CDR to the Contracting Officer and COR within five workdays after receipt of the CDR. The Contractor shall maintain copies of all inspection and evaluation reports. Government review of contractor deliverables will be guided by the QASP. The QASP will be based on the requirements and acceptance criteria in the PWS and aligned with the design, implementation and testing plans in coordination with the contractor.

Contracting Officer Representative and/or Technical Point of Contact A Contracting Officer’s Representative (COR) and/or Technical Point of Contact (TPOC) will be appointed on each task order. The COR and TPOC have no authority to direct the contractor in any way to alter the contractual obligation. The Contracting Officer is the only individual authorized to make changes to the contract.

File details come from the government source that posted it. Updated .