A01_MCLB Barstow Wash Rack Maintenance for Marine _PWS 7.22.25.docx

DOCX document 42 KB Posted

Attached to
Marine Corps Logistics Base (MCLB) Barstow Wash Rack Preventive Maintenance
Solicitation number
M67004-25-Q-0089
Issued by

About this file

This Performance Work Statement (PWS) details bi-monthly preventive maintenance requirements for two Hydro Engineering Wash Rack systems located at Marine Corps Logistics Base (MCLB) Barstow, California. The contract covers a base year from 16 September 2025 to 15 September 2026, with two additional one-year option periods through 15 September 2028, requiring six maintenance visits annually.

The maintenance scope includes comprehensive inspections and servicing of multiple system components, including the Treatment Unit, Pressure Washer, Indexing Filter, and Generator. Key requirements mandate that the contractor provide written reports after each visit, use authorized technicians, obtain approval before executing repairs, and supply all necessary consumable supplies. Contractor personnel must meet specific qualifications, including English proficiency, professional certifications, and compliance with base security protocols. The maintenance will be performed entirely on-site at MCLB Barstow, with potential equipment removal allowed under strict authorization and vendor liability conditions.

View the file

Other files

File Type Posted
SOURCES SOUGHT NOTICE - MCLB Barstow Wash Rack Maintenance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) For MCLB Barstow Wash Rack Maintenance for Marine Corps Logistics Command (MARCORLOGCOM)

1.0 Introduction. Marine Corps Logistics Command (MARCORLOGCOM), Marine Force Storage Command (MFSC) has a requirement for bi-monthly Preventive Maintenance to be conducted on-site in Marine Corps Logistics Base (MCLB) Barstow, CA in support of two Hydro Site Wash racks.

2.0 Objectives. The contractor shall provide bi-monthly Preventive Maintenance (6 visits a year) on two Hydro sites for a Base plus two Option Years. The objective is to have contractor personnel to come on-site and give a written report on all findings. Contractor shall not execute any repairs necessary without the approval from the Contracting Officer. Requirements are stated below:

(2) Hydro Sites:

-Hydro Engineering model 1ZD293, Hydro Site S/N: 10100023 -Hydro Engineering model 1ZD293, Hydro Site S/N: 10100034 -Contractor must be authorized to work on Hydro Engineering wash rack equipment

Treatment Unit:

· Inspect system for any visible leaks

· Clean and test all float switches

· Clean pump strainer

· Record media pressure before backwash

· Perform manual backwash, record media pressure

· Check amperage draws on pump motor

· Clean oil skimmer (if installed)

· Inspect sump pump, clean float switches

· Clean discharge strainer

Pressure Washer:

· Inspect unit for any visible leaks

· Inspect belts, gun and hoses

· Inspect pump and check oil, change when due

· Perform motor amperage check

· Perform back pressure test

· Test and record pressure

Indexing Filter:

· Inspect unit for any visible leaks

· Clean float switches

· Test sump pump

· Clean spray bar

· Grease paper advance drive motor

· Trim spent filter paper

Generator:

· Inspect unit check all fluids

· Test, ensure unit is operating correctly

· Change oils when due

*Contractor shall provide all consumable supplies needed for the Preventive Maintenance of the was racks.

3.0 Period of Performance:

Base Year: 16 September 2025 - 15 September 2026 (6 Visits - Bi-monthly) Option Period One: 16 September 2026 – 15 September 2027 (6 Visits - Bi-monthly) Option Period Two: 16 September 2027 - 15 September 2028 (6 Visits - Bi-monthly)

4.0 Place of Performance. All service/maintenance/inspections will be conducted aboard Marine Corps Logistics Base Barstow, CA. Equipment may be removed from the installation, under written authorization, and at the cost of the vendor to complete necessary work. Vendor assumes all liability and responsibility for damage caused to and as a result of transport of equipment.

5.0 Government Furnished Property. None will be provided.

6.0 Government Furnished Information (GFI). The Government shall furnish such GFI, and system access as is necessary for the contractor to fulfill the requirements of this PWS. The contractor shall collect and/or develop and provide all documentation requested to support unique and recurring requirements during the period of performance. All information, reports, data, etc., produced by the contractor in support of this PWS shall be the property of the Government.

7.0 Key Control. Keys will not be issued to the contractor.

8.0 Training. The contractor shall be fully trained to provide the support required by this PWS.

9.0 Contractor Employees.

9.1 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the contracting officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

9.2 Contractor personnel shall present a neat appearance and be easily recognized as contract employees. All employees shall wear contractor provided nametags, which include the contractor's name, employee's full name and duty title.

9.3 Contractor employees shall be able to read, write, speak, and understand English.

9.4 The contractor shall make sure employees have current and valid professional qualifications before starting work under this contract.

9.5 The contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of the Navy, either military or civilian, unless such person seeks and receives approval.

10.0 Security Requirements. Vendor will notify equipment responsible officer for base sponsorship. Vendor is responsible for complying with all base access rules, laws, and regulations. Vendor is responsible for ensuring all technicians are vetted properly at least one week prior to service call.

11.0 Contractor Responsibility. Contractors operating on base will be responsible for briefing and ensuring the employees adhere to the traffic rules and regulations. The foreman, job supervisor and other personnel providing workman leadership will, when possible, ensure the workers comply with these rules and regulations. Speed limit on base is posted. Individuals are to obey all entry procedures. If instructions are given by the Security Forces personnel on the entry points (gates), they will be complied with immediately.

12.0 Travel. Vendor is responsible for the transport, travel, movement costs of required equipment and personnel to complete service/maintenance/inspections of equipment on site. Removal of equipment will be at no additional cost to the government in accordance with service/maintenance/inspection requirements.

(END Performance Work Statement)