This is a project description and scope of work document for the Maintenance and Preservation of Municipal Bridges project involving the municipalities of Ashfield, Charlemont, Conway, and Hawley in Massachusetts. The project encompasses bridge maintenance and preservation work across multiple municipal locations. The document outlines the technical requirements and specifications for bridge maintenance activities, including structural inspection, repair, and preservation measures necessary to maintain the integrity and safety of the municipal bridge infrastructure. The scope of work details the specific maintenance tasks, materials, and methodologies required for each bridge location. Bidders are instructed not to use the COMMBUYS system to submit proposals for this project, indicating an alternative procurement process.
The project requires qualified contractors with demonstrated experience in municipal bridge maintenance and preservation work. The document specifies technical standards and compliance requirements that contractors must meet throughout the contract term. Funding for this project is provided through the participating municipalities of Ashfield, Charlemont, Conway, and Hawley. The procurement process requires careful attention to the submission instructions and specifications outlined in the bid documents, with emphasis on adherence to the stated requirements and timelines for project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 616282 Bid Items List.txt | TXT text file | |
| A00851-616282.pdf | ||
| 616282 - Plan Holders List 8-11-2026.pdf | ||
| 616282 - Notice to Contractors.pdf | ||
| A00875-616282.pdf | ||
| A00801-616282.pdf | ||
| ASHFIELD-CHARLEMONT-CONWAY-HAWLEY-616282-135581-A-1.pdf | ||
| A00803-616282.pdf | ||
| A00820-616282.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 616282-135581
A00850 - 1
DOCUMENT A00850
MASSACHUSETTS WETLANDS
PROTECTION ACT
Request for Determination of Applicability
Ashfield - Request for Determination of Applicability (Bridge A-13-014)................. A00850-3 through 10
Ashfield - Request for Determination of Applicability (Bridge A-13-020)............... A00850-11 through 18
Ashfield - Request for Determination of Applicability (Bridge A-13-026)............... A00850-19 through 26
Massachusetts Department Of Transportation Highway Division
A00850 - 2
THIS PAGE IS INTENTIONALLY LEFT BLANK
Massachusetts Department of Environmental Protection Bureau of Water Resources - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
A. General Information Important:
When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.
1. Applicant:
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address
2. Property Owner (if different from Applicant):
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
3. Representative (if any)
First Name Last Name
Company Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
B. Project Description
1. a. Project Location (use maps and plans to identify the location of the area subject to this request):
Street Address City/Town How to find Latitude and Longitude Latitude (Decimal Degrees Format with 5 digits after decimal e.g. XX.XXXXX) Longitude (Decimal Degrees Format with 5 digits after decimal e.g. -XX.XXXXX) and how to convert to decimal degrees Assessors’ Map Number Assessors’ Lot/Parcel Number
b. Area Description (use additional paper, if necessary):
c. Plan and/or Map Reference(s): (use additional paper if necessary)
Title Date
Title Date
Proposal No. 616282-135581
A00850 - 3 https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/ https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/ https://www.fcc.gov/media/radio/dms-decimal
WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
B. Project Description (cont.)
2. a. Activity/Work Description (use additional paper and/or provide plan(s) of Activity, if necessary):
b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary).
3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project.
Single family house on a lot recorded on or before 8/1/96
Single family house on a lot recorded after 8/1/96
Expansion of an existing structure on a lot recorded after 8/1/96
Project, other than a single-family house or public project, where the applicant owned the lot before 8/7/96
New agriculture or aquaculture project
Public project where funds were appropriated prior to 8/7/96
Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision
Residential subdivision; institutional, industrial, or commercial project
Municipal project
District, county, state, or federal government project
Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection.
b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.)
A00850 - 4
A00850 - 5
A-13-014 Ashfield (12/17/2025) -3
GENERAL REQUIREMENTS FOR DEMOLITION AND WORK INVOLVING
PAINTED STEEL
Demolition and work involving painted steel shall conform to the requirements of Section 961 of the 2025 Standard Specifications.
Work Involving Painted Steel
Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.
The Contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The Contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.
Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.
This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.
Environmental
All applicable portions of Sections 961.65 “Worker Protection” and 961.66 “Environmental Protection and Monitoring” shall be followed when performing this work.
During chemical stripping a hand washing facility may be used in lieu of a decontamination/changing facility.
Hazardous material shall be collected during the disassembly and disposed of as outlined in Section 961.68 “Handling of Hazardous Waste and Reporting Release Programs”.
The applicable submittals shall be according to Section 961.69 “Submittals”.
Cleaning/Removal
Cutting Or Burning Of Steel
All surfaces to be welded, heated, saw cut or burned shall be cleaned so as to remove all contaminants and/or hazardous materials, which could be discharged to the environment as a function of the subsequent operations.
EXCERPT FROM CONTRACT SPECIFICATIONS FOR SHIELDING UNDER BRIDGE
A00850 - 6
A-13-014 Ashfield (12/17/2025) -4
Lead paint shall be removed in its entirety in an area prescribed by a 6 inch (15 cm) minimum offset from the required work. The paint removal operation may be dry abrasive blasting, wet abrasive blasting or chemical stripping.
Proper level of containment shall be used when performing this work in accordance with Section
961.67 “Containment”. Full containment is not required during chemical stripping operation however; the Contractor shall install proper shielding and/or tarpaulins under the chemical stripping operations in order to catch all debris generated during this procedure. A cleaned area must be inspected and approved before the demolition operations are started.
During cleaning operations the Contractor shall be required to furnish and erect temporary floodlights illuminating the steel surface at a minimum of 30-foot candles. This lighting shall be used in areas where there is insufficient lighting for proper cleaning operations and inspection.
The Contractor shall supply electrical power.
The Contractor shall provide support for interim and final inspection of the bridge during cleaning operations. This support shall include the necessary traffic controls and safe access to the work.
Mechanical Disassembly Of Steel
All surfaces to be mechanically disassembled by shear cutting or removing bolts or rivets shall not require deleading. When shear cutting or removing bolts or rivets, the Contractor shall not use any method that will cause dust and/or particles to be emitted and/or dispersed into the environment to an extent that would expose the workers above the Action Levels of 30µg/m3.
For purposes of limiting the lead (Pb) dust, the Contractor will be required to dampen the lead paint work areas.
The Contractor shall install a proper shielding and/or tarpaulins under all lead-paint-coated surfaces to be shear cut or bolts or rivets ordered removed in order to catch any loose lead paint chips, dust or particles.
PLANS AND DETAIL DRAWINGS
(Supplementing Subsection 5.02)
Plans for the existing bridge dated December 1938 are available upon request from Gill Engineering Associates. Existing conditions shown on the plans were depicted from the existing plans, and visual observations. The latest MassDOT inspection report is also available upon request. The Contractor shall perform his/her own investigation of the existing bridge to determine its condition and details necessary for construction and base his/her bid thereon.
PROTECTION OF UTILITIES AND PROPERTY
(Supplementing Subsection 7.13)
A00850 - 7
A pp le V al le y R d ov er U pp er
B ra nc h
C le ss on
B ro ok
P rin te d
D ec
0, D E
P W et la nd s
D et ai le d W ith O ut lin es
D E
P W et la nd s
Li ne ar F ea tu re s
N H
E S
P E st im at ed
H ab ita ts o f R ar e
W ild lif e
D F
W C ol dw at er
F is he rie s R es ou rc es
N H
E S
P P rio rit y H ab ita ts o f R ar e S pe ci es
M as sG
IS
-M as sD O
T R oa ds
S tr ee t N am es
P ro pe rt y T ax P ar ce ls
P ro je ct
L oc us
D E
P W
E T
LA
N
D S
N
H E
S P
P R
IO
R
IT
Y
H A
B
IT
A T
S O
F R
A R
E S
P E
C
IE
S D
E T
A
IL
E D
W
IT
H O
U T
LI
N
E S
A00850 - 8
1234 CHESTNUT STREET
SUITE 207
NEWTON, MA 02464
781-355-7100
781-355-7101 (FAX)
REGISTERED PROFESSIONAL ENGINEERDATE
DATEDRW. BYCALC. BYAPPRV. BYDESCRIPTION
A13014 Encasement (Pumped Concrete).dwg17-Dec-2025 10:18 AM Plotted on Proposal No. 616282-135581
A00850 - 9
NEWTON, MA 02464
781-355-7100
781-355-7101 (FAX)
REGISTERED PROFESSIONAL ENGINEERDATE
DATEDRW. BYCALC. BYAPPRV. BYDESCRIPTION
A13014 Encasement (Pumped Concrete).dwg17-Dec-2025 10:23 AM Plotted on Proposal No. 616282-135581
A00850 - 10
WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
A. General Information Important:
When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.
1. Applicant:
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address
2. Property Owner (if different from Applicant):
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
3. Representative (if any)
First Name Last Name
Company Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
B. Project Description
1. a. Project Location (use maps and plans to identify the location of the area subject to this request):
Street Address City/Town How to find Latitude and Longitude Latitude (Decimal Degrees Format with 5 digits after decimal e.g. XX.XXXXX) Longitude (Decimal Degrees Format with 5 digits after decimal e.g. -XX.XXXXX) and how to convert to decimal degrees Assessors’ Map Number Assessors’ Lot/Parcel Number
b. Area Description (use additional paper, if necessary):
c. Plan and/or Map Reference(s): (use additional paper if necessary)
Title Date
Title Date
Proposal No. 616282-135581
A00850 - 11 https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/ https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/
WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
B. Project Description (cont.)
2. a. Activity/Work Description (use additional paper and/or provide plan(s) of Activity, if necessary):
b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary).
3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project.
Single family house on a lot recorded on or before 8/1/96
Single family house on a lot recorded after 8/1/96
Expansion of an existing structure on a lot recorded after 8/1/96
Project, other than a single-family house or public project, where the applicant owned the lot before 8/7/96
New agriculture or aquaculture project
Public project where funds were appropriated prior to 8/7/96
Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision
Residential subdivision; institutional, industrial, or commercial project
Municipal project
District, county, state, or federal government project
Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection.
b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.)
A00850 - 12
A00850 - 13
A-13-020 Ashfield (01/05/2026) -3
PAINTED STEEL
Demolition and work involving painted steel shall conform to the requirements of Section 961 of the 2025 Standard Specifications.
Work Involving Painted Steel
Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.
The Contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The Contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.
Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.
This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.
Environmental
All applicable portions of Sections 961.65 “Worker Protection” and 961.66 “Environmental Protection and Monitoring” shall be followed when performing this work.
During chemical stripping a hand washing facility may be used in lieu of a decontamination/changing facility.
Hazardous material shall be collected during the disassembly and disposed of as outlined in Section 961.68 “Handling of Hazardous Waste and Reporting Release Programs”.
The applicable submittals shall be according to Section 961.69 “Submittals”.
Cleaning/Removal
Cutting Or Burning Of Steel
All surfaces to be welded, heated, saw cut or burned shall be cleaned so as to remove all contaminants and/or hazardous materials, which could be discharged to the environment as a function of the subsequent operations.
A00850 - 14
A-13-020 Ashfield (01/05/2026) -4 offset from the required work. The paint removal operation may be dry abrasive blasting, wet abrasive blasting or chemical stripping.
Proper level of containment shall be used when performing this work in accordance with Section
961.67 “Containment”. Full containment is not required during chemical stripping operation however; the Contractor shall install proper shielding and/or tarpaulins under the chemical stripping operations in order to catch all debris generated during this procedure. A cleaned area must be inspected and approved before the demolition operations are started.
During cleaning operations the Contractor shall be required to furnish and erect temporary floodlights illuminating the steel surface at a minimum of 30-foot candles. This lighting shall be used in areas where there is insufficient lighting for proper cleaning operations and inspection.
The Contractor shall supply electrical power.
The Contractor shall provide support for interim and final inspection of the bridge during cleaning operations. This support shall include the necessary traffic controls and safe access to the work.
Mechanical Disassembly Of Steel
All surfaces to be mechanically disassembled by shear cutting or removing bolts or rivets shall not require deleading. When shear cutting or removing bolts or rivets, the Contractor shall not use any method that will cause dust and/or particles to be emitted and/or dispersed into the environment to an extent that would expose the workers above the Action Levels of 30µg/m3.
For purposes of limiting the lead (Pb) dust, the Contractor will be required to dampen the lead paint work areas.
The Contractor shall install a proper shielding and/or tarpaulins under all lead-paint-coated surfaces to be shear cut or bolts or rivets ordered removed in order to catch any loose lead paint chips, dust or particles.
PLANS AND DETAIL DRAWINGS
(Supplementing Subsection 5.02)
Plans for the existing bridge dated October 1939 are available upon request from Gill Engineering Associates. Existing conditions shown on the plans were depicted from the existing plans, and visual observations. The latest MassDOT inspection report is also available upon request. The Contractor shall perform his/her own investigation of the existing bridge to determine its condition and details necessary for construction and base his/her bid thereon.
PROTECTION OF UTILITIES AND PROPERTY
(Supplementing Subsection 7.13)
A00850 - 15
A pp le V al le y R d ov er U pp er
B ra nc h
C le ss on
B ro ok
P rin te d
D ec
0, M as sG
IS
-M as sD O
T R oa ds
S tr ee t N am es
N H
E S
P P rio rit y H ab ita ts o f R ar e S pe ci es
D F
W C ol dw at er
F is he rie s R es ou rc es
N H
E S
P E st im at ed
H ab ita ts o f R ar e
W ild lif e
D E
P W et la nd s
Li ne ar F ea tu re s
D E
P W et la nd s
D et ai le d W ith O ut lin es
P ro pe rt y T ax P ar ce ls
P ro je ct
L oc us
D E
P W
E T
LA
N
D S
N
H E
S P
P R
IO
R
IT
Y
H A
B
IT
A T
S O
F R
A R
E S
P E
C
IE
S D
E T
A
IL
E D
W
IT
H O
U T
LI
N
E S
A00850 - 16
NEWTON, MA 02464
781-355-7100
781-355-7101 (FAX)
REGISTERED PROFESSIONAL ENGINEERDATE
DATEDRW. BYCALC. BYAPPRV. BYDESCRIPTION
A13020 Encasement (Pumped Concrete).dwg15-Dec-2025 2:57 PM Plotted on Proposal No. 616282-135581
A00850 - 17
A00850 - 18
WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
A. General Information Important:
When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.
1. Applicant:
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address
2. Property Owner (if different from Applicant):
First Name Last Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
3. Representative (if any)
First Name Last Name
Company Name
Address
City/Town State Zip Code
Phone Number Email Address (if known)
B. Project Description
1. a. Project Location (use maps and plans to identify the location of the area subject to this request):
Street Address City/Town How to find Latitude and Longitude Latitude (Decimal Degrees Format with 5 digits after decimal e.g. XX.XXXXX) Longitude (Decimal Degrees Format with 5 digits after decimal e.g. -XX.XXXXX) and how to convert to decimal degrees Assessors’ Map Number Assessors’ Lot/Parcel Number
b. Area Description (use additional paper, if necessary):
c. Plan and/or Map Reference(s): (use additional paper if necessary)
Title Date
Title Date
Proposal No. 616282-135581
A00850 - 19 https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/ https://www.howtogeek.com/689097/how-to-get-latitude-and-longitude-coordinates-from-google-maps/
WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Municipality
B. Project Description (cont.)
2. a. Activity/Work Description (use additional paper and/or provide plan(s) of Activity, if necessary):
b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary).
3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project.
Single family house on a lot recorded on or before 8/1/96
Single family house on a lot recorded after 8/1/96
Expansion of an existing structure on a lot recorded after 8/1/96
Project, other than a single-family house or public project, where the applicant owned the lot before 8/7/96
New agriculture or aquaculture project
Public project where funds were appropriated prior to 8/7/96
Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision
Residential subdivision; institutional, industrial, or commercial project
Municipal project
District, county, state, or federal government project
Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection.
b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.)
A00850 - 20
A00850 - 21
A-13-026 Ashfield (01/05/2026) -3
PAINTED STEEL
Demolition and work involving painted steel shall conform to the requirements of Section 961 of the 2025 Standard Specifications.
Work Involving Painted Steel
Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.
The Contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The Contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.
Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.
This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.
Environmental
All applicable portions of Sections 961.65 “Worker Protection” and 961.66 “Environmental Protection and Monitoring” shall be followed when performing this work.
During chemical stripping a hand washing facility may be used in lieu of a decontamination/changing facility.
Hazardous material shall be collected during the disassembly and disposed of as outlined in Section 961.68 “Handling of Hazardous Waste and Reporting Release Programs”.
The applicable submittals shall be according to Section 961.69 “Submittals”.
Cleaning/Removal
Cutting Or Burning Of Steel
All surfaces to be welded, heated, saw cut or burned shall be cleaned so as to remove all contaminants and/or hazardous materials, which could be discharged to the environment as a function of the subsequent operations.
A00850 - 22
ElisiaMcLean Text Box
EXCERPT FROM CONTRACT SPECIFICATIONS FOR SHIELDING UNDER BRIDGE
A-13-026 Ashfield (01/05/2026) -4 offset from the required work. The paint removal operation may be dry abrasive blasting, wet abrasive blasting or chemical stripping.
Proper level of containment shall be used when performing this work in accordance with Section
961.67 “Containment”. Full containment is not required during chemical stripping operation however; the Contractor shall install proper shielding and/or tarpaulins under the chemical stripping operations in order to catch all debris generated during this procedure. A cleaned area must be inspected and approved before the demolition operations are started.
During cleaning operations the Contractor shall be required to furnish and erect temporary floodlights illuminating the steel surface at a minimum of 30-foot candles. This lighting shall be used in areas where there is insufficient lighting for proper cleaning operations and inspection.
The Contractor shall supply electrical power.
The Contractor shall provide support for interim and final inspection of the bridge during cleaning operations. This support shall include the necessary traffic controls and safe access to the work.
Mechanical Disassembly Of Steel
All surfaces to be mechanically disassembled by shear cutting or removing bolts or rivets shall not require deleading. When shear cutting or removing bolts or rivets, the Contractor shall not use any method that will cause dust and/or particles to be emitted and/or dispersed into the environment to an extent that would expose the workers above the Action Levels of 30µg/m3.
For purposes of limiting the lead (Pb) dust, the Contractor will be required to dampen the lead paint work areas.
The Contractor shall install a proper shielding and/or tarpaulins under all lead-paint-coated surfaces to be shear cut or bolts or rivets ordered removed in order to catch any loose lead paint chips, dust or particles.
PLANS AND DETAIL DRAWINGS
(Supplementing Subsection 5.02)
Plans for the existing bridge dated November 1938 are available upon request from Gill Engineering Associates. Existing conditions shown on the plans were depicted from the existing plans, and visual observations. The latest MassDOT inspection report is also available upon request. The Contractor shall perform his/her own investigation of the existing bridge to determine its condition and details necessary for construction and base his/her bid thereon.
PROTECTION OF UTILITIES AND PROPERTY
(Supplementing Subsection 7.13)
A00850 - 23
C re am er y R d ov er C re am er y
B ro ok
P rin te d
D ec
1, D E
P W et la nd s
D et ai le d W ith O ut lin es
D E
P W et la nd s
Li ne ar F ea tu re s
N H
E S
P E st im at ed
H ab ita ts o f R ar e
W ild lif e
D F
W C ol dw at er
F is he rie s R es ou rc es
N H
E S
P P rio rit y H ab ita ts o f R ar e S pe ci es
M as sG
IS
-M as sD O
T R oa ds
S tr ee t N am es
P ro pe rt y T ax P ar ce ls
Proposal No. 616282-135581
A00850 - 24
ElisiaMcLean Ellipse
ElisiaMcLean Text Box Project Locus
ElisiaMcLean Line
ElisiaMcLean Text Box Project Locus
NEWTON, MA 02464
781-355-7100
781-355-7101 (FAX)
REGISTERED PROFESSIONAL ENGINEERDATE
DATEDRW. BYCALC. BYAPPRV. BYDESCRIPTION
A13026 Encasement (Pumped Concrete).dwg18-Dec-2025 10:36 AM Plotted on Proposal No. 616282-135581
A00850 - 25
A00850 - 26
| Municipality: ASHFIELD |
| First Name: TOWN OF ASHFIELD |
| Last Name: |
| Address: TOWN HALL, 412 MAIN STREET |
| CityTown: ASHFIELD |
| State: MA |
| Zip Code: 01330 |
| Phone Number: 413-628-4441 EXT. 7 |
| Email Address: TownAdmin@ashfield.org |
| First Name_2: TOWN OF ASHFIELD |
| Last Name_2: |
| Address_2: |
| CityTown_2: |
| State_2: |
| Zip Code_2: |
| Phone Number_2: |
| Email Address if known: |
| First Name_3: DANIEL |
| Last Name_3: CROVO |
| Company Name: GILL ENGINEERING ASSOCIATES, INC. |
| Address_3: 1234 CHESTNUT STREET, SUITE 207 |
| CityTown_3: NEWTON |
| State_3: MA |
| Zip Code_3: 02464 |
| Phone Number_3: 781-355-7100 |
| Email Address if known_2: dcrovo@gill-eng.com |
| Street Address: NEAR 206 APPLE VALLEY ROAD |
| CityTown_4: ASHFIELD |
| Latitude Decimal Degree Format with 5 digits after decimal eg: 42.55475 |
| Longitude Decimal Degree Format with 5 digits after: -72.80761 |
| Assessors Map Number: None |
| Assessors LotParcel Number: Town Right of Way |
| b: Town Right of Way with town owned bridge that carries Apple Valley Road over Upper Branch Clesson Brook |
| Title: SEE ATTACHMENT - BRIDGE BEAM END REPAIR PLANS PREPARED BY GEA |
| Date: 12/17/2025 |
| Title_2: SEE ATTACHMENT FROM PROJECT SHIELDING SPECIFICATIONS PREPARED BY GEA |
| Date_2: 12/17/2025 |
| 1: The Town of Ashfield proposes to perform preservation work to the bridge carrying Apple Valley Road over Upper Branch Clesson Brook in Ashfield, MA. The proposed work includes repairs to the existing severely deteriorated steel beam ends. The work is intended to improve the current level of safety and extend the service life of the existing bridge structure. |
| necessary: Upper Clesson Brook is a cold water fishery. All proposed work will take place on the bridge structure and not within the waterway. Site not located within an ACEC or ORW. |
| Single family house on a lot recorded on or before 8196: Off |
| Single family house on a lot recorded after 8196: Off |
| Expansion of an existing structure on a lot recorded after 8196: Off |
| Project other than a singlefamily house or public project where the applicant owned the lot: Off |
| New agriculture or aquaculture project: Off |
| Public project where funds were appropriated prior to 8796: Off |
| Project on a lot shown on an approved definitive subdivision plan where there is a recorded deed: Off |
| Residential subdivision institutional industrial or commercial project: Off |
| Municipal project: On |
| District county state or federal government project: Off |
| Project required to evaluate offsite alternatives in more than one municipality in an: Off |
| undefined: N/A |
File details come from the government source that posted it. Updated .