A00814-616507.pdf

PDF 885 KB Posted

Attached to
616507 DISTRICT 6 Generator Maintenance and Testing at Various Locations (3 Yrs)
Solicitation number
BD-27-1030-0H100-0H002-134134
Issued by
Massachusetts

About this file

This is a Daily Force Account Report Form (CSD-123) issued by the Massachusetts Department of Transportation Highway Division for Proposal No. 616507-136968. The form serves as a standardized daily reporting document used to track labor, equipment, materials, and salvage associated with force account work performed on transportation projects in Massachusetts. The document is designed to record detailed information about work performed on specific contract dates, including classifications of labor with hours worked, equipment operations with hours of operation, materials used with quantities and units, and salvage items recovered from the project.

The form requires comprehensive documentation of all resources deployed on a given work day, with specific instructions for designating whether materials are used temporarily or remain permanently in the work, indicating the condition of items as new, fit, or scrap, and noting the disposition of previously installed items that required removal. An authorized employee in charge of force account operations must certify the accuracy of the reported labor, equipment, and materials data. The form includes designated spaces for contractor or utility identification, project location details, contract and agreement numbers, and signature blocks for both the employee submitting the report and receiving supervisory personnel, with corresponding date fields for accountability and record-keeping purposes.

View the file

Other files

File Type Posted
A00820-616507.pdf PDF
616507 - Notice to Contractors.pdf PDF
616507 Bid Items.txt TXT text file
A00810-616507.pdf PDF
A00801-616507.pdf PDF
A00875-616507.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 616507-136968

A00814 - 1

DOCUMENT A00814

DAILY REPORT FORM

FORM CSD-123

Massachusetts Department Of Transportation Highway Division

A00814 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

COMMONWEALTH OF MASSACHUSETTS

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION

DAILY FORCE ACCOUNT REPORT

Contractor/Utility: Project:

Contract No: Agreement No: FAP No:

Contract Date: Agreement Date: Prime: Sub:

Date of Work: Work Item and Description:

LABOR

Classification No. Time Worked No. Hours Line Total to to to to to to to to

EQUIPMENT

Description No. Hours of Op. No. Hours Line Total to to to to to to to to

MATERIALS

Description Quantity Unit

SALVAGE

Description Quantity Unit

Location and Description of Work:

Received: Signed:

(Title) (Title) Massachusetts Department of Transportation

Date:

A00814 - 3

M A

T E

R

IA

L U

SE

D

, SA

L

V E

D , E

T C

C harged In C harged O ut

Permanent Work

Temporary Work

Old Items Removed

Q uantity

D ate

Q uan

R ate

A m nt Q uantity D ate Q uan R ate A m nt

N ew

Fit

Fit Scrap

IN

ST

R U

C T

IO

N

S 1.

N ote w hether all m aterial chargeable to the project it is used tem porarily or rem ains perm anently in the w ork

2.

U se the three colum ns on the right to indicate the disposition of the item

, using a check m ark (

) in the proper colum n opposite the referenced item

3.

U se the last colum n to designate those item s w hich are already in use and w ere installed prior to any elim ination w ork but w hich m ust be rem oved due to this w ork. D o not refer to such item s under the colum n “C harged In” but do show a salvage allow ance.

4.

Indicate the quality of the item w ith a check m ark ( ) as “N ew ”, “Fit” or “Scrap, in the appropriate colum n.

I, do hereby certify that I am the em ployee of in charge of force account operations in connection w ith the construction of Project/A greem ent N o: located at and that I am in a position to have full know ledge that the accounts herein show n are a substantially accurate statem ent of labor em ployed, equipm ent operated, and m aterial used and/or salvaged on the project on the D ay of , , R eceived:

Signed:

(Title)

(Title) M assachusetts D epartm ent of Transportation D ate:

D ate:

A00814 - 4

A00814-1 Daily Report Form CSD-123
A00814-2 Daily Report Form CSD-123
DAILY FORCE ACCOUNT REPORT
LABOR
EQUIPMENT
MATERIALS
SALVAGE

File details come from the government source that posted it. Updated .