A00811-609277.pdf

PDF 773 KB Posted

Attached to
609277 NORTH ADAMS FAP No. CRP/STP-0031(023)X Reconstruction of Ashland Street
Solicitation number
BD-27-1030-0H100-0H002-131773
Issued by
Berkshire County, New Bedford City, Massachusetts

About this file

This is a Watering Log form issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for tracking plant maintenance activities associated with Proposal No. 609277-135788 for landscaping work related to the Ashland Street reconstruction project in North Adams. The form is designed to document watering schedules for trees and shrubs installed as part of MassDOT plantings, with separate logs required for areas or plants with different watering schedules. Trees must receive a minimum of 10 gallons per watering event, while shrubs must receive a minimum of 5 gallons. The form includes provisions to record rainfall dates and amounts when watering is not performed as scheduled due to precipitation. Completed logs must be submitted weekly to the MassDOT Engineer following each watering event, with sign-off required from both the Landscape Contractor and Prime Contractor on each entry.

The log accommodates up to 26 separate watering events and requires documentation of the date watered along with initials from both the Landscape Contractor and Prime Contractor for verification purposes. The form includes designated fields for project description, contract number, project number, and plant locations, with attachment space for planting plans as necessary. Additional notes can be recorded to document any relevant observations or circumstances affecting the watering schedule. This tracking mechanism serves as a compliance and accountability tool ensuring proper establishment and maintenance of plantings during the critical establishment period following installation.

View the file

Other files

File Type Posted
609277 - Plan Holders List 8-11-2026.pdf PDF
A00802-609277.pdf PDF
A00869-609277.pdf PDF
Link to Bid Opening 8-25-2026~3.pdf PDF
609277 - Notice to Contractors.pdf PDF
NORTH ADAMS-609277-135788-A-1.pdf PDF
609277 - Bid Tabulations.pdf PDF
A00820-609277.pdf PDF
A00875-609277.pdf PDF
609277 Bid Items List.txt TXT text file
609277 - Plan Holders List 8-24-2026.pdf PDF
BIDS OPENED - Tuesday - August 25-2026~5.pdf PDF
A00801-609277.pdf PDF
A00808-609277.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division

A00811 - 1

DOCUMENT A00811

WATERING LOG

for

MassDOT Plantings

Proposal No. 609277-135788

W at er in g L og fo r M as sD

O T

P la nt in gs

Se pa ra te lo gs sh al l b e ke pt to tr ac k ar ea s o r pl an ts w ith d iff er en t w at er in g sc he du le s.

T re es sh al l r ec ei ve a m in im um o f 1 ga llo ns w ith e ac h w at er in g an d sh ru bs a m in im um o f 5 g al lo ns

Pr ov id e no te th at if w at er in g is n ot p er fo rm ed a s s ch ed ul ed d ue to r ai n.

R ec or d da te o f r ai nf al l a nd a m ou nt

D at e W at er ed

La nd sc ap e C on tra ct or

In iti al

Pr im e C on tra

D at e W at er ed

La nd sc ap e C on tra im e C on tra

Ea ch w ee k, fo llo w in g w at er in g, L og sh al l b e su bm itt ed to th e

M as sD O

T En gi ne er

6/ /2

Pr oj ec t D es cr ip tio n:

Co nt ra ct

N o:

oj ec t N o:

Pl an t L oc at io ns /s

(A tt ac h pl an tin g pl an /s a s ne ce ss ar y)

N ot es

Massachusetts Department Of Transportation Highway Division

A00811 - 2

Proposal No. 609277-135788

Project Description:
ContractNo:
ProjectNo:
Plant Locationss Attach planting plans as necessary:
Notes:
date watered1:
LandscapeContractorInitial1:
PrimeContractorInitial1:
date watered2:
LandscapeContractorInitial2:
PrimeContractorInitial2:
date watered3:
LandscapeContractorInitial3:
PrimeContractorInitial3:
date watered4:
LandscapeContractorInitial4:
PrimeContractorInitial4:
date watered5:
LandscapeContractorInitial5:
PrimeContractorInitial5:
date watered6:
LandscapeContractorInitial6:
PrimeContractorInitial6:
date watered7:
LandscapeContractorInitial7:
PrimeContractorInitial7:
date watered8:
LandscapeContractorInitial8:
PrimeContractorInitial8:
date watered9:
LandscapeContractorInitial9:
PrimeContractorInitial9:
date watered10:
LandscapeContractorInitial10:
PrimeContractorInitial10:
date watered11:
LandscapeContractorInitial11:
PrimeContractorInitial11:
date watered12:
LandscapeContractorInitial12:
PrimeContractorInitial12:
date watered13:
LandscapeContractorInitial13:
PrimeContractorInitial13:
date watered14:
LandscapeContractorInitial14:
PrimeContractorInitial14:
date watered15:
LandscapeContractorInitial15:
PrimeContractorInitial15:
date watered16:
LandscapeContractorInitial16:
PrimeContractorInitial16:
date watered17:
LandscapeContractorInitial17:
PrimeContractorInitial17:
date watered18:
LandscapeContractorInitial18:
PrimeContractorInitial18:
date watered19:
LandscapeContractorInitial19:
PrimeContractorInitial19:
date watered20:
LandscapeContractorInitial20:
PrimeContractorInitial20:
date watered21:
LandscapeContractorInitial21:
PrimeContractorInitial21:
date watered22:
LandscapeContractorInitial22:
PrimeContractorInitial22:
date watered23:
LandscapeContractorInitial23:
PrimeContractorInitial23:
date watered24:
LandscapeContractorInitial24:
PrimeContractorInitial24:
date watered25:
LandscapeContractorInitial25:
PrimeContractorInitial25:
date watered26:
LandscapeContractorInitial26:

File details come from the government source that posted it. Updated .