605323 OXFORD FAP No. HIP(NGB)-004S(015)X Bridge Replacement, O-06-030, (ST 56) Leicester Road ov
Solicitation number
BD-27-1030-0H100-0H002-133656
Issued by
Worcester County, Massachusetts

About this file

This is a Special Provisions document issued by the Massachusetts Department of Transportation Highway Division for a federal aid bridge replacement project in Oxford, Massachusetts. The project involves replacing the existing bridge superstructure O-06-030 carrying Route 56 (Leicester Street) over the French River with a new single-span bridge superstructure consisting of Prefabricated Bridge Units (PBUs) and modifications to abutments and wingwalls. The scope of work includes removing the bridge superstructure, excavating and modifying reinforced concrete elements, reconstructing approximately 505 feet of Leicester Street with full depth roadway construction and hot mix asphalt paving, and installing guardrails, pavement markings, and temporary utility support. The project is constrained by a 14-day maximum road closure period that must occur between the last day of school and the first day of school, with a penalty of $11,500 per day for any closure exceeding 14 consecutive days. Key milestones include Contractor Field Completion within 706 calendar days from Notice to Proceed, Substantial Completion within 651 calendar days, and Full Beneficial Use within 620 calendar days. Prospective bidders must submit all questions to the Construction Contracts Engineer by 3:00 P.M. on the Tuesday of the previous week before the scheduled bid opening date.

Labor participation goals are established at 15.3% for minorities and 6.9% for women for each job category, applicable to both contractors and subcontractors on-site. Work is restricted to normal 8-hour days, Monday through Friday, during daytime hours, except during the designated 14-day road closure period when multiple work shifts seven days per week are required and anticipated. Holiday work restrictions apply to various federal and state holidays with specific limitations on major arterial roadways and local roads. The project is federally funded and subject to Buy America and Build America Act requirements, mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. The Contractor must comply with National Defense Authorization Act telecommunications equipment restrictions, provide evidence of truck safety device compliance including lateral protective devices and backup cameras, implement an Environmental Health and Safety Program approved by a Certified Industrial Hygienist, and obtain a Licensed Site Professional for contamination assessment and MCP compliance. Additional requirements include utility coordination with specific notice and documentation procedures, compliance with Endangered Species Act protections for northern long-eared bats and tricolored bats with activity restrictions, invasive plant management strategies, tree and plant protection measures, and Arborist services for tree evaluation and protection oversight.

View the file

Other files

File Type Posted
A00811-605323.pdf PDF
OXFORD-605323-136790-A-1.pdf PDF
A00871-605323.pdf PDF
A00875-605323.pdf PDF
605323 Bid Items List.txt TXT text file
605323 - Notice to Contractors.pdf PDF
A00802-605323.pdf PDF
A00872-605323.pdf PDF
A00808-605323.pdf PDF
A00820-605323.pdf PDF
605323 - Plan Holders List 10-6-2026.pdf PDF
A00810-605323.pdf PDF
A00870-605323.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 605323-136790

A00801 - 1

DOCUMENT A00801

SPECIAL PROVISIONS

OXFORD

Federal Aid Project No. HIP(NGB)-004S(015)X

Bridge Replacement, O-06-030, (ST 56) Leicester Road over the French River

Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category. The goals are applicable to both Contractor’s and Subcontractor’s on-site construction workforce. Refer to Document 00820 for details.

SCOPE OF WORK

All work under this Contract shall be done in conformance with the 2026 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the Construction Standard Details in effect as of July 2026, the 1990 Standard Drawings for Signs and Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 11th Edition of the Manual on Uniform Traffic Control Devices (MUTCD) and the January 2026 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions.

The work under this Contract consists of replacing the existing bridge superstructure O-06-030 (1D5) carrying Route 56 (Leicester Street) over the French River in Oxford, MA with a new single-span bridge superstructure consisting of Prefabricated Bridge Units (PBUs) and modifications of the abutments and wingwalls to accommodate the new superstructure. Abutment and wingwall modifications include removal of the bridge seats, backwalls, approach slabs, and upper portions of the wingwalls and parapets and installation of new precast concrete abutment bridge seats, backwalls, moment slabs, and approach slabs.

Also included is the reconstruction of approximately 505 feet of Leicester Street including full depth roadway construction, pavement fine milling, hot mix asphalt paving, guardrail, pavement markings, the installation of temporary utility bridge support, relocation of overhead wires, traffic signal timing, and other incidental items required to complete the work shown on the drawings, as listed in the proposal, and as required by the Engineer.

It is anticipated that all work will be done from above or behind the existing abutments and wingwalls. No work is to be done in the French River. Any impacts to the French River will not be permitted.

In order to minimize the impact to road users, the duration of the road closure for superstructure replacement is limited to 14 days.

A00801 - 2

CONTRACTOR QUESTIONS AND ADDENDUM ACKNOWLEDGEMENTS

Prospective bidders are required to submit all questions to the Construction Contracts Engineer by 3:00 P.M. on the Tuesday of the previous week before the scheduled bid opening date. Any questions received after this time will not be considered for review by the Department.

Contractors should email questions and addendum acknowledgements to the following email address massdotspecifications@dot.state.ma.us The MassDOT proposal number and municipality is to be placed in the subject line.

NONCONFORMING COMPRESSIVE STRENGTH OF CEMENT CONCRETE

Concrete with compressive strength test results failing to attain the limits specified in Table 901.64-3 of 901.64.B: Acceptance Testing shall be evaluated for structural adequacy and serviceability at the Contractors’ expense. The Department will review all production records, the concrete test records, petrographic analysis report, field notes, and the placement records for the concrete in question. If the Engineer determines the material is found to be adequate to remain in place, payment shall be adjusted in accordance with the following formula:

𝑃𝑃 =

2(𝑓𝑓𝑓𝑓 − 𝑓𝑓′𝑐𝑐)(𝑈𝑈𝑈𝑈)(𝑄𝑄)

𝑓𝑓′𝑐𝑐

Where:

𝑃𝑃 = 𝑝𝑝𝑝𝑝𝑝𝑝 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 𝑓𝑓𝑓𝑓𝑓𝑓 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐

𝑓𝑓′𝑐𝑐 = 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠ℎ 𝑎𝑎𝑎𝑎 28 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 𝑓𝑓𝑓𝑓 = 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠ℎ 𝑎𝑎𝑎𝑎 56 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 𝑄𝑄 = 𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞 𝑜𝑜𝑜𝑜 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟 𝑏𝑏𝑏𝑏 𝑡𝑡ℎ𝑒𝑒 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡 𝑈𝑈𝑈𝑈 = 𝑢𝑢𝑢𝑢𝑢𝑢𝑢𝑢 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑜𝑜𝑜𝑜 𝑡𝑡ℎ𝑒𝑒 𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙 𝑠𝑠𝑠𝑠𝑠𝑠 𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑝𝑝𝑝𝑝𝑝𝑝 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑦𝑦𝑦𝑦𝑦𝑦𝑦𝑦 𝑓𝑓𝑓𝑓𝑓𝑓 𝑡𝑡ℎ𝑒𝑒 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑜𝑜𝑜𝑜 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑖𝑖𝑖𝑖 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝

PROVISIONS FOR TRAVEL AND PROSECUTION OF THE WORK

(Supplementing Subsection 7.09, 7.10, and 8.03)

The Contractor shall submit the proposed work hours to the Engineer for approval prior to commencement of construction activities.

With the exception of the 14-day period of road closure, work on this project is resticted to a normal 8-hour day, 5-day week (Monday through Friday), during daytime hours for the duration of project. Saturdays and Sundays are not included. During the 14-day period of the road closure, the Contractor is advised that multiple work shifts 7 days/nights per week, including Saturdays and Sundays will be required. If the contractor chooses to perform night work, Temporary Illumination for Work Zone will be considered incidental to the project. The Contractor’s work schedule and bid price shall be prepared to include these provisions. The roadway closure is limited 14 consecutive days to start after the last day of school and must be reopened prior to the first day of school. In the event that the roadway closure exceeds 14 days, the Contractor shall pay to MassDOT a designated amount based on a daily rate of discincentive cost equal to $11,500 per day.

mailto:MassDOTSpecifications@dot.state.ma.us

A00801 - 3

HOLIDAY WORK RESTRICTIONS

(Supplementing Subsection 7.09)

The District Highway Director (DHD) may authorize work to continue during these specified time periods if it is determined by the District that the work will not negatively impact the traveling public. DHD may allow work in those areas on a case by case basis and where work is behind barrier and will not impact traffic

Below are the holiday work restrictions:

New Years Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Martin Luther King's Birthday (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

President's Day (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Evacuation Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

Patriot's Day (State Holiday) Work restrictions will be in place for Districts 3 and 6 along the entire Boston Marathon route and any other locations that the DHD in those districts determine are warranted so as not to impact the marathon. All other districts work restrictions will be as per DHD.

Mother’s Day No work on Western Turnpike and Metropolitan Highway System from 5:00 AM on the Friday before, until the normal start of business on the following day.

Memorial Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Bunker Hill Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

A00801 - 4

HOLIDAY WORK RESTRICTIONS (Continued)

Juneteenth No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Independence Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Labor Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Columbus Day (Federal Holiday) No work on major arterials from 5:00 AM on the Friday before, until the normal start of business on the following day

Veterans' Day (Federal Holiday) No work restrictions due to traffic concerns.

Thanksgiving Day (Federal Holiday) No work on major arterials from 5:00 AM two days before until the normal start of business on the following Monday.

Christmas Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day.

SUBSECTION 8.02 SCHEDULE OF OPERATIONS

Replace this subsection with the following:

An integrated cost and schedule controls program shall be implemented by the Contractor to track and document the progress of the Work from Notice to Proceed (NTP) through the Contractor Field Completion (CFC) Milestone. The Contractor’s schedules will be used by the Engineer to monitor project progress, plan the level-of-effort required by the Department’s work force and consultants and as a critical decision-making tool. Accordingly, the Contractor shall ensure that it complies fully with the requirements specified herein and that its schedules are both accurate and updated as required by the specification throughout the life of the project. Detailed requirements are provided in Division II, Section 722 Construction Scheduling.

A00801 - 5

ENVIRONMENTAL PERMITTING

The proposed work does not occur in jurisdictional wetland resources subject to section 401 or section 404 of the Clean Water Act; therefore, the project does not require a Water Quality Certification from the Massachusetts Department of Environmental Protection or authorization from the US Army Corps of Engineers. The proposed work qualifies for the bridge exemption authorized in the Transportation Bond Bill and is therefore not subject to the Massachusetts Wetlands Protection Act, the Massachusetts Public Waterfront Act (Chapter 91), or the Massachusetts Environmental Policy Act.

If field conditions and/or Contractor-proposed erection, demolition, staging, or other procedures require work to occur in or otherwise impact water or wetland resource areas, the Contractor is advised that no associated work can occur until all required environmental permits have been obtained allowing such work. The Contractor must notify the District Highway Director and Resident Engineer in writing at least 60 days prior to desire commencement of the proposed activity. All environmental submittals, including any Contract with Local, State, or Federal environmental agencies, must be coordinated with the District Environmental Engineer. The Contractor is expected to fully cooperate with requests for information and provide same in a timely manner. The Contractor is further advised that the Department will not entertain a delay claim due to the time required to obtain the environmental permits.

TRUCK SAFETY DEVICES

(Supplementing Subsection 7.04: Motor Vehicles)

All motor vehicles subject to Section 7 of Chapter 90 to be operated under this Contract shall be equipped with safety devices as provided therein and in 540 CMR 4.00.

The Contractor shall certify to the Registry of Motor Vehicles, in a manner prescribed by the Registrar, that all applicable vehicles are equipped with Lateral Protective Devices, Convex Mirrors, Cross Over Mirror(s) and Back Up Cameras in accordance with the requirements of 540

CMR 4.00.

The Contractor shall provide evidence satisfactory to the Department to demonstrate compliance with the above certification requirement for all applicable vehicles operated under this Contract by the Contractor and its subcontractors and vendors in a manner set forth by the Department.

Thereafter, the Contractor shall have an affirmative obligation to continue to provide such evidence of compliance on an ongoing basis and no later than 7 days after certification with the Registry of Motor Vehicles of any additional vehicles operated under this Contract by the Contractor and its subcontractors and vendors.

Non-compliance with respect to a vehicle that is subject to 540 CMR 4.00 may subject the Contractor to statutory fines as established in M.G.L. c. 90, § 7 and/or contractual remedies up to and including termination of the Contract.

A00801 - 6

SOIL STOCKPILING DIRECTIVE P-22-001

Any stockpiling of soil must be performed in compliance with Policy Directive P-22-001, Off- Site Stockpiling of Soil from MassDOT Construction Projects. This directive limits the allowable locations for off-site stockpiling of soil generated during MassDOT projects and includes various requirements that must be satisfied by the contractor prior to off-site stockpiling. The Contractor is responsible for identifying a suitable stockpile location.

PROJECT MILESTONES:

MS#01 – Contractor Field Completion: The Contractor shall achieve Contractor Field Completion within 706 calendar days from Notice to Proceed as determined by the Engineer.

Contractor Field Completion is defined as: All physical Contract Work is complete including punch list. The Contractor has fully de-mobilized from field operations.

MS#02 – Substantial Completion: The Contractor shall achieve Substantial Completion within 651 calendar days from Notice to Proceed as determined by the Engineer.

Substantial Completion is defined as: A walkthrough of the entire Contract Work has been performed by the Resident Engineer, a Punch List has been generated and the Work required by the Contract, including paperwork, has been completed, except for work having a Contract price of less than one percent of the adjusted total Contract price, including overruns, underruns, and all Contract amendments. All material submittals have been received by the District Materials Lab.

MS#03 –Full Beneficial Use: The Contractor shall achieve Full Beneficial Use within 6 2 0 calendar days from Notice to Proceed as determined by the Engineer.

Full Beneficial Use is defined as: The majority of Contract Work has been completed and the asset(s) has been opened for full multi-modal transportation use, except for limited contract work items that do not materially impair or hinder the intended public use of the transportation facility.

All anticipated lane takings have been completed, except for minor, short term work items.

The Contractor must clearly identify all aspects of this work in the preparation of the Construction Schedule and throughout the Contract duration.

A00801 - 7

SITE ACCESS RESTRAINTS:

Access Restraints and Interim Milestones The Contract Limitations of Operation include Access Restraint(s) to provide an anticipated start date of certain portions of the Work that are restrained by a Utility Party, local municipality, or for purposes Traffic Management. An Access Restraint is a restriction of physical work, of a specific area or operation in the Contract. The Contract Time (duration) has considered these portions of the utility work has been developed with the initial information that has been provided by the Utility Party, and accepted by MassDOT. The Contractor shall be required to communicate and coordinate with all affected Utilities, and may be required to perform support aspects of the applicable utility relocation. The Contractor must clearly identify all aspects of this work in the preparation of the Construction Schedule and throughout the Contract duration.

This Contract contains the following Access Restraints and related Milestones that are to be included in the Contractor’s Baseline Schedule submission:

Access Restraint #A1 – Route 56 Detour Route 56 will remain open to traffic until the last day of school, when the Contractor may implement the detour and close the bridge for a maximum of 14 consecutive days. The new bridge and roadway must be completed to 2-way through traffic by the first day of school.

Access Restraint #A2 – Temporary Utility Relocations Route 56 will remain open to traffic until the temporary utility support is installed and the AT&T fiberoptic lines are removed from the existing bridge and supported on the temporary utility support.

A00801 - 8

SUBSECTION 8.14 UTILITY COORDINATION, DOCUMENTATION, AND

MONITORING RESPONSIBILITIES

A. GENERAL

In accordance with the provisions of Section 8.00 Prosecution and Progress, utility coordination is a critical aspect to this Contract. This section defines the responsibility of the Contractor and MassDOT, with regard to the initial utility relocation plan and changes that occur as the prosecution of the Work progresses. The Engineer, with assistance from the Contractor shall coordinate with Utility companies that are impacted by the Contractor’s operations. To support this effort, the Contractor shall provide routine and accurate schedule updates, provide notification of delays, and provide documentation of the steps taken to resolve any conflicts for the temporary and/or permanent relocations of the impacted utilities. The Contractor shall provide copies to the Engineer of the Contractor communication with the Utility companies, including but not limited to:

• Providing advanced notice, for all utility-related meetings initiated by the Contractor.

• Providing meeting minutes for all utility-related meetings that the Contractor attends.

• Providing all test pit records.

• Request for Early Utility work requirements of this section (see below).

• Notification letters for any proposed changes to Utility start dates and/or sequencing.

• Written notification to the Engineer of all apparent utility delays within seven (7) Calendar

Days after a recognized delay to actual work in the field – either caused by a Utility or the Contractor.

• Any communication, initiated by the Contractor, associated with additional Right-of-Way needs in support of utility work.

• Submission of completed Utility Completion Forms.

B. PROJECT UTILITY COORDINATION (PUC) FORM

The utility schedule and sequence information provided in the Project Utility Coordination Form (if applicable) is the best available information at the time of the bid and has been considered in setting the contract duration. The Contractor shall use all of this information in developing the bid price and the Baseline Schedule Submission, inclusive of the individual utility durations sequencing requirements, and any work that has been noted as potentially concurrent utility installations.

C. INITIATION OF UTILITY WORK

The Engineer will issue all initial notice-to-proceed dates to each Utility company based on either the:

1) Contractor’s accepted Baseline Schedule

2) An approved Early Utility Request in the form of an Early Utility sub-net schedule (in accordance with the requirements of this Subsection)

3) An approved Proposal Schedule

C.1 - BASELINE SCHEDULE – UTILITY BASIS

The Contractor shall provide a Baseline Schedule submission in accordance with the requirements of Subsection 8.02 and inclusive of all of the information provided in the PUC Form that has been issued in the Contract documents. This is to include the utility durations, sequencing of work, allowable concurrent work, and all applicable considerations that have been depicted on the PUC Form.

A00801 - 9

SUBSECTION 8.14 (Continued)

C.2 – EARLY UTILITY REQUEST – (aka SUBNET SCHEDULE) PRIOR TO THE BASELINE All early utility work is defined as any anticipated/required utility relocations that need to occur prior to the Baseline Schedule acceptance. In all cases of proposed early utility relocation, the Contractor shall present all known information at the pre-construction conference in the form of a ‘sub-net’ schedule showing when each early utility activity needs to be issued a notice-to-proceed. The Contractor shall provide advance notification of this intent to request early utility work in writing at or prior to the Pre-Construction meeting. Prior to officially requesting approval for early utility work, the Contractor shall also coordinate with MassDOT and all utility companies (private, state or municipal) which may be impacted by the Contract. If this request is acceptable to the Utilities and to MassDOT, the Engineer will issue a notice-to-proceed to the affected Utilities, based on these accepted dates.

C.3 – PROPOSAL SCHEDULE - CHANGES TO THE PUC FORM

If the Contractor intends to submit a schedule (in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02) that contains durations or sequencing that vary from those provided in the Project Utility Coordination (PUC) Form, the Contactor must submit this as an intended change, in the form of a Proposal Schedule and in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02. These proposed changes are subject to the approval of the Engineer and the impacted utilities, in the form of this Proposal Schedule and a proposed revision to the PUC form. The Contractor shall not proceed with any changes of this type without written authorization from the Engineer, that references the approved Proposal Schedule and PUC form changes. The submission of the Baseline Schedule should not include any of these types of proposed utility changes and should not delay the submission of the Baseline Schedule. As a prerequisite to the Proposal Schedule submission, and in advance of the utility notification(s) period, the Contractor shall coordinate the proposed utility changes with the Engineer and the utility companies, to develop a mutually agreed upon schedule, prior to the start of construction.

D. UTILITY DELAYS

The Contractor shall notify the Engineer upon becoming aware that a Utility owner is not advancing the work in accordance with the approved utility schedule. Such notice shall be provided to the Engineer no later than seven (7) calendar days after the occurrence of the event that the Contractor believes to be a utility delay. After such notice, the Engineer and the Contractor shall continue to diligently seek the Utility Owner’s cooperation in performing their scope of Work.

In order to demonstrate that a critical path delay has been caused by a third-party Utility, the Contractor must demonstrate, through the requirements of the monthly Progress Schedule submissions and the supporting contract records associated with Subsection 8.02, 8.10 and 8.14, that the delays were beyond the control of the Contractor.

A00801 - 10

SUBSECTION 8.14 (Continued)

All documentation provided in this section is subject to the review and verification of the Engineer and, if required, the Utility Owner. In accordance with MassDOT Specifications, Division I, Subsection 8.10, a Time Extension will be granted for a delay caused by a Utility, only if the actual duration of the utility work is in excess of that shown on the Project Utility Coordination Form, and only if;

1) proper Notification of Delay was provided to MassDOT in accordance with the time requirements that are specified in this Section

2) the utility delay is a critical path impact to the Baseline Schedule (or most recently approved Progress Schedule)

E. LOCATION OF UTILITIES

The locations of existing utilities are shown on the Contract drawings as an approximation only.

The Contractor shall perform a pre-construction utility survey, including any required test pits, to determine the location of all known utilities no later than thirty (30) calendar days before commencing physical site work in the affected area.

F. POST UTILITY SURVEY – NOTIFICATION

Following completion of a utility survey of existing locations, the Contractor will be responsible to notify the Engineer of any known conflicts associated with the actual location of utilities prior to the start of the work. The Engineer and the Contractor will coordinate with any utility whose assets are to be affected by the Work of this Contract. A partial list of utility contact information is provided in the Project Utility Coordination Form.

G. MEETINGS AND COOPERATION WITH UTILITY OWNERS

The Contractor shall notify the Engineer in advance of any meeting they initiate with a Utility Owner’s representative to allow MassDOT to participate in the meeting if needed.

Prior to the Pre-Construction Meeting, the Contractor should meet with all Utility Owners who will be required to perform utility relocations within the first 6 months of the project, to update the affected utilities of the Project Utility Coordination Form and all other applicable Contract requirements that impact the Utilities. The Contractor shall copy the Engineer on any correspondence between the Utility Owner and the Contractor.

H. FORCE ACCOUNT / UTILITY MONITORING REQUIREMENTS

The Engineer will be responsible for recording daily Utility work force reports. The start, suspension, re-start, and completion dates of each of the Utilities, within each phase of the utility relocation work, will be monitored and agreed to by the Engineer and the Contractor as the work progresses.

I. ACCESS AND INSPECTION

The Contractor shall be responsible for allowing Utility owners access to their own utilities to perform the relocations and/or inspections. The Contractor shall schedule their work accordingly so as not to delay or prevent each utility from maintaining their relocation schedule.

A00801 - 11

COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT

(Supplementing Subsection 7.01)

On all projects, the “Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment” Regulation (2 CFR 200.216) prohibits the Contractor from using or furnishing the following telecommunications equipment or services:

• Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).

• For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

• Telecommunications or video surveillance services provided by such entities or using such equipment.

• Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

This prohibition applies to all products manufactured by the aforementioned companies, including any individual components or parts.

By submitting a bid on a project, the Contractor certifies that all work will be in compliance with the terms of 2 CFR 200.216. The Contractor shall submit a COC indicating compliance with the above provisions for all telecommunications equipment or services included in the Contract.

Payment for the item in which the materials are incorporated may be withheld until these COCs are received. Any cost involved in furnishing the certificate(s) shall be borne by the Contractor.

BIDDERS LIST

Pursuant to the provisions of 49 CFR Part 26.11 all official bidders will be required to report the names, addresses and telephone numbers of all firms that submitted bids or quotes in connection with this project. Failure to comply with a written request for this information within 15 business days may result in a recommendation to the Prequalification Committee that prequalification status be suspended until the information is received.

The Department will survey all firms that have submitted bids or quotes during the previous year prior to setting the annual goal and shall request that each firm report its age and gross receipts for the year.

A00801 - 12

BUILD AMERICA BUY AMERICA PREFERENCE

On Federally-aid projects the Buy America (23.CFR § 635.410) and Build America, Buy America Act. requires the following,

(1) all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, must occur in the United States. Foreign steel and iron can be used if the cost of the materials does not exceed 0.1% of the total Contract cost or $2,500, whichever is greater.

The action of applying a coating to a covered material (i.e., steel and iron) is deemed a manufacturing process subject to Buy America. Coating includes epoxy coating, galvanizing, painting and any other coating that protects or enhances the value of a material subject to requirements of Build America, Buy America. Steel used for temporary support of excavation, including H piles, soldier piles, and sheeting when the steel is required to be left in place is subject to requirements of Build America, Buy America. Temporary steel, shall remain in place when it falls within the influence zone of the soil supporting any structure or railroad tracks.

(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States and

(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.

“Construction materials” includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials;

aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is or consists primarily of:

• non-ferrous metals,

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables),

• glass (including optic glass),

• lumber; or

• drywall.

A00801 - 13

BUILD AMERICA BUY AMERICA PREFERENCE (Continued)

The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

All articles, materials, and supplies should be classified as an iron or steel product, a manufactured product, or another product as specified by law or in 2 CFR part 184 (such other products specified by law or in 2 CFR part 184 include “excluded materials” and “construction materials”); an article, material, or supply must not be considered to fall into multiple categories.

NATIONAL GRID EMERGENCY TELEPHONE NUMBERS

GAS:

Emergency: 1-800-233-5325 New Service: 1- 877-696-4743 Customer Support: 1-800-732-3400

ELECTRIC:

Outage/ Emergency: 1-800-465-1212 New Service: 1-800-375-7405 Customer Support: 1-800-322-3223

A00801 - 14

GENERAL REQUIREMENTS FOR DEMOLITION AND

WORK INVOLVING PAINTED STEEL

(02/06/2020)

Demolition and work involving painted steel shall conform to the requirements of Subsection 961 of the Standard Specifications.

Work Involving Painted Steel

Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.

The contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.

Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.

This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.

Environmental

All applicable portions of Subsections 961.65 “Worker Protection” and 961.66 “Environmental Protection and Monitoring” shall be followed when performing this work.

During chemical stripping a hand washing facility may be used in lieu of a decontamination/changing facility.

Hazardous material shall be collected during the disassembly and disposed of as outlined in Subsection 961.68 “Handling of Hazardous Waste and Reporting Release Programs”.

The applicable submittals shall be according to Subsection 961.69 “Submittals”.

A00801 - 15

GENERAL REQUIREMENTS FOR DEMOLITION AND

WORK INVOLVING PAINTED STEEL (Continued)

Cleaning/Removal

Cutting Or Burning Of Steel

All surfaces to be welded, heated, saw cut or burned shall be cleaned so as to remove all contaminants and/or hazardous materials, which could be discharged to the environment as a function of the subsequent operations.

Lead paint shall be removed in its entirety in an area prescribed by a 6 inch (15 cm) minimum offset from the required work. The paint removal operation may be dry abrasive blasting, wet abrasive blasting or chemical stripping.

Proper level of containment shall be used when performing this work in accordance with Subsection 961.67 “Containment”. Full containment is not required during chemical stripping operation however; the Contractor shall install proper shielding and/or tarpaulins under the chemical stripping operations in order to catch all debris generated during this procedure. A cleaned area must be inspected and approved before the demolition operations are started.

During cleaning operations the Contractor shall be required to furnish and erect temporary floodlights illuminating the steel surface at a minimum of 30-foot candles. This lighting shall be used in areas where there is insufficient lighting for proper cleaning operations and inspection.

The Contractor shall supply electrical power.

The Contractor shall provide support for interim and final inspection of the bridge during cleaning operations. This support shall include the necessary traffic controls and safe access to the work.

Mechanical Disassembly Of Steel

All surfaces to be mechanically disassembled by shear cutting or removing bolts or rivets shall not require deleading. When shear cutting or removing bolts or rivets, the Contractor shall not use any method that will cause dust and/or particles to be emitted and/or dispersed into the environment to an extent that would expose the workers above the Action Levels of 30µg/m3.

For purposes of limiting the lead (Pb) dust, the Contractor will be required to dampen the lead paint work areas.

The contractor shall install a proper shielding and/or tarpaulins under all lead-paint-coated surfaces to be shear cut or bolts or rivets ordered removed in order to catch any loose lead paint chips, dust or particles.

A00801 - 16

PIGEON WASTE

The Contractor shall remove and dispose of the pigeon waste and any other debris accumulated on the steel members and bridge seats in areas where work is being performed. Pigeon waste and debris material contaminants will require special handling and disposal in accordance with all Federal, state, and local requirements. No separate payment will be made for removal and disposal of pigeon waste. Cost shall be incidental to the contract pay items.

EMERALD ASH BORER ADVISORY

To the extent possible, all trees and brush shall be disposed on site, typically chipped and spread in place. When trees or brush must be removed, such as in urban, or otherwise populated areas, Contractor shall identify proposed location for disposal, and provide written notification to the Engineer for approval. Disposal shall be in city or town of project, or at minimum, within county, of construction operations.

EQUIVALENT SINGLE AXLE LOADS (ESALS)

The estimated traffic level to be used for SUPERPAVE HMA mixture designs for this contract, expressed in Equivalent Single Axle Loads (ESALs) for the design travel lane over a 20-year period, is 2.2 Million 18-kip (80-kn) ESALs.

CONTAMINATED SOIL

Soil to be removed from the project area shall not be assumed to be uncontaminated and must be evaluated prior to off-site management for potential contamination with hazardous materials. No soil may be disposed of off-site without proper assessment by the contractor and approval from the Resident Engineer (RE), District Environmental Engineer (DEE), or the project designee.

A00801 - 17

NORTHERN LONG-EARED BAT AND TRICOLORED BAT PROTECTION

The U.S. Fish and Wildlife Service (USFWS) has listed the northern long-eared bat (Myotis septentrionalis; NLEB) and tricolored bat (Perimyotis subflavus; TCB) as federally endangered or proposed endangered, respectfully, under the Endangered Species Act (ESA). USFWS has developed this guidance to address ESA compliance and promote conservation of NLEB and TCB.

This project has been consulted with the USFWS through the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA), and Federal Transit Administration (FTA) Programmatic Biological Opinion for Transportation Projects in the Range of the Indiana Bat and Northern Long-Eared Bat revised February 5, 2018 and amended March 31, 2023.

On behalf of FHWA, the lead federal agency for Section 7 consultation, MassDOT has completed the consultation for the Endangered Species Act, (see Document A00870 MESA No take off Letter), whereby it was determined that this Project will have “No Effect” to the NLEB.

However, in advance of the uplisting of the TCB to endangered under the ESA, the following Avoidance and Minimization Measures (AMMs) must be strictly adhered to in order to protect TCB and to be in compliance with the ESA. Contact MassDOT Environmental Services - Wildlife Unit Supervisor (David Paulson, david.j.paulson@dot.state.ma.us, 857-262-3378) for questions about project limits, restrictions, or conservation measures.

General AMM

• The Contractor shall ensure all personnel working in on the project site are aware of all environmental commitments related to NLEB and TCB, including all applicable AMMs. NLEB and TCB information (https://www.fws.gov/midwest/endangered/mammals/nleb/ and https://www.fws.gov/species/tricolored-bat-perimyotis-subflavus) shall be made available to all personnel.

Lighting AMMs

• Direct temporary lighting away from suitable habitat during the active season: April 15 to

October 31.

• When installing new or replacing existing permanent lights, use downward-facing, full cut-off lens lights (with same intensity or less for replacement lighting); or for those transportation agencies using the BUG system developed by the Illuminating Engineering Society, be as close to 0 for all three ratings with a priority of "uplight" of 0 and "backlight" as low as practicable.

Tree Removal AMMs

• If additional cutting is proposed by the Contractor that is outside the scope of this contract, additional review is required by the MassDOT Highway Division’s Environmental Services Section, and additional review and restrictions may be required by the USFWS.

mailto:david.j.paulson@dot.state.ma.us https://www.fws.gov/midwest/endangered/mammals/nleb/

A00801 - 18

NORTHERN LONG-EARED BAT AND TRICOLORED BAT PROTECTION (Continued)

• Ensure tree removal is limited to that specified in project plans and ensure that contractors understand clearing limits and how they are marked in the field (e.g., install bright colored flagging/fencing prior to any tree clearing to ensure contractors stay within clearing limits).

• No tree cutting shall be conducted during the active season: April 15 to October 31.

• The Contractor shall ensure all personnel working in on the project site are aware of all environmental commitments related to NLEB and/or TCB, including the TOY restriction. If this restriction needs to be waived at any location(s) the Resident Engineer shall send a locus map of the proposed work to MassDOT Highway Division’s Environmental Services Section for review and a determination if the restriction can be waived.

A00801 - 19

ITEM 102.3 HERBICIDE TREATMENT OF INVASIVE PLANTS HOUR

This work must be performed by persons who meet the qualifications below and are approved by the Landscape Design Section.

Work under this item consists of herbicide treatment of invasive plants currently existing within the project limits and as directed. An Invasive Plant Management Strategy (IPMS) shall be submitted to the Engineer for review and approval and the IPMS shall be implemented on-site.

The IPMS shall be written and submitted per Item 102.33 Invasive Plant Management Strategy and shall be measured and paid for under that Item.

Work under this item shall be coordinated with work and schedule for Selective Clearing, Clearing and Grubbing, Mowing, Tree Removal, Planting, and Wetland Mitigation items.

Payment is per hour on-site and shall be compensation for a minimum crew of 2 licensed applicators, 2 back-pack sprayers and mist-blowers, a properly equipped spray truck with spray hoses, and a tank with sufficient capacity for a full day of work. If there is only one applicator, hourly payment shall be adjusted to 50 percent of the unit price.

Date and time stamped photos indicating start and stop time of work must be submitted if requested.

This item is not intended for manual removal of plants.

Management of plants determined to have been introduced to the site via imported loam, compost, mulch, plants, equipment, or other construction activities will be the Contractor’s responsibility and at the Contractor’s expense.

Herbicide shall be applied during daytime hours only.

Measures to prevent the introduction of invasive plant species to the site and to address introduction due to construction-related activities shall be covered under the Standard Specifications, Division I - Subsections 7.01(D) Plant Pest Control and 7.13 Protection and Restoration of Property as amended in these Special Provisions.

Plant species targeted for management under this item shall be as determined in the field per the site walk and as specified in the IPMS.

A00801 - 20

ITEM 102.3 (Continued)

The definition of invasive plant species shall be as described by Massachusetts Invasive Plant Advisory Group (MIPAG): “non-native species that have spread into native or minimally managed plant systems in Massachusetts, causing economic or environmental harm by developing self-sustaining populations and becoming dominant and/or disruptive to those systems.”

Control of invasive plants shall begin immediately with the initiation of construction activities and prior to any clearing or site disturbance. Treatment areas shall include stockpile locations and may, upon approval of the Engineer, extend outside the project limit. Treatment shall be done each consecutive year for the duration of the contract unless specified otherwise in the IMPS or unless directed otherwise by the MassDOT invasive species contact. Work shall be done during the growing season from May – October unless otherwise specified in the IPMS.

Areas identified for vegetation control measures shall be as shown on the plans and as determined in the field by the Engineer and a MassDOT Landscape Architect. Contact at MassDOT Landscape Design Section may be contacted at:Stephanie.Smoot@dot.state.ma.us.

QUALIFICATIONS

The applicators shall submit and meet the qualifications outlined below. A list of contractors specializing in invasive management and approved by MassDOT Landscape Design Section is available on the following website: https://www.mass.gov/lists/landscape-design-and-roadside-maintenance under Invasive Plant Management.

Requirements

1. Company must provide proof of qualifications by providing the following:

a. Narrative describing company, its expertise and experience with invasive plant control.

b. Demonstrate experience with herbicide treatment as part of restorations and in sensitive areas.

c. Describe company’s technical qualifications and past performance.

2. Company must meet licensing requirements:

a. All crew applicators must have a Massachusetts Commercial Applicator License (CORE).

b. At least one or more applicator must have a ROW certification, if required for work.

c. Company must provide name(s) of applicator(s) and Applicator License/Certification number for all contractor crew leaders working on the project.

d. Company must provide documentation of any warnings, penalties or fines received in the last three (3) years.

3. Company must provide proof of experience with invasive plant control and include following:

a. At least five (5) references from prior invasive plant control work completed in last five (5) years. Provide contact information including address, phone number and email.

b. Provide a summary of each of these projects including nature of the problem, specific invasive vegetation treated, dates and period of treatment, methodologies used, and summary of success or not in terms of meeting performance objectives. Include summary of equipment used.

https://www.mass.gov/lists/landscape-design-and-roadside-maintenance

A00801 - 21

c. Photo documentation of these projects.

d. GPS coordinates of project locations, if available.

4. Crew leader must have expertise with invasive plant control and provide the following:

a. Have held Core license for at least five (5) years.

b. Resume listing five (5) or more years of experience applying pesticides with the company or with another company specializing in vegetation management.

SUBMITTALS

No work shall begin without approval of the submittals.

Submittals include the following items:

Invasive Plant Management Strategy (IPMS)

At least thirty (30) days prior to proposed treatment the IPMS shall be submitted for approval by the Engineer and MassDOT Landscape Architect. All chemicals, methods and work done under this item shall be consistent with the IPMS. The IPMS shall be as described under Item 102.33.

Herbicide Use Report

Within two (2) weeks after each application, the Contractor shall provide to the Engineer and the MassDOT Landscape Architect a completed and signed MassDOT Herbicide Use Report.

Photo Documentation

Digital photos with date and time of herbicide application work, showing start time and completion time, are required and must be submitted for measurement of payment upon request.

MATERIALS

All proposed herbicides shall be as approved in the IPMS. Herbicides shall be labeled for the method of treatment and shall meet all federal, state and local regulation requirements. Application rates will depend on herbicide proposed and shall be per the manufacturer’s label for specific application.

METHODS

All methods used shall be as approved in the IPMS which shall be determined during the Initial Site Walk as described under Item 102.33 Invasive Plant Management Strategy.

The Contractor shall be responsible for marking delineated areas and plants to be preserved, removed, or otherwise treated. Fencing or other materials needed for marking and delineating protected areas shall be incidental to this item.

A00801 - 22

The Contractor shall notify the Engineer a minimum of 3 days prior to date of expected herbicide application. Applicators shall notify the Engineer upon arriving on-site and upon leaving the site.

Herbicide Applications

All herbicide application shall conform to Massachusetts Pesticide Laws and Regulations per the Massachusetts Department of Agricultural Resources (MDAR) Pesticide Bureau.

Mixing, applying and/or disposing of herbicides shall always be in accordance with instructions on their labels and all applicable federal, state, and local regulations. Mixing shall not occur within sensitive areas, wetlands, or buffer zones.

Contractor shall not spray 2 hours prior to precipitation, during rain, or during windy conditions.

The Contractor shall be responsible for monitoring weather conditions and adjusting the work schedule as appropriate for the herbicide and application method to be used.

Targeted vegetation shall be identified and marked prior to treatment. Plants treated by foliar spray, injection or glove application or other methods that leave standing vegetation, as opposed to cut-stump application, shall remain clearly marked for identification through the contract period.

Desirable vegetation shall be protected from both spray and other physical damage.

Contractor is responsible for any damage to vegetation not designated for removal or treatment.

Vegetation damaged shall be restored. Cost of replacement plants and/or restoration shall be borne by the Contractor.

Contractor shall ensure that the public does not enter a work area while herbicide application or spraying is underway.

Disposal Of Invasive Plant Material

All material to be cleared shall become the property of the Contractor. The satisfactory disposal of all cleared plant material (seeds, roots, woody vegetation, associated soils, etc.) shall be the Contractor’s responsibility.

The Contractor shall take measures to prevent viable plant material from leading to further infestations (seeds, roots, woody material, etc.) while stockpiled, in transit, or at final disposal locations. All precautions shall be taken to avoid contamination of natural landscapes with invasive plants or invasive plant material.

Chipping, shredding, or on-site burning of plant material must be approved by the Engineer and included in the IMPS.

A00801 - 23

For plant material taken to an incinerating facility per the IPMS, a receipt from that facility…