A006 PBC PQT Report.pdf
PDF 55 KB Posted
- Attached to
- Platoon Bulk Charger
- Solicitation number
- W91CRB-25-R-0022
About this file
The attached file appears to be a generic Adobe Reader loading page and does not contain any substantive contract information related to the Platoon Bulk Charger (PBC) solicitation. The page simply provides instructions for upgrading Adobe Reader and lists trademark information for Windows, Mac, and Linux operating systems. No contract-specific details can be extracted from this document.
To fully analyze the solicitation details, additional documentation for W91CRB-25-R-0022 would need to be reviewed. The high-level opportunity information indicates this is a Request for Prototype Proposal (RPP) from the Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground, seeking innovative solutions for a Platoon Battery Charger with a response deadline of 12:00 PM Eastern Time on 17 July 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6 Question and Answers_Consolidated v5.xlsx | XLSX spreadsheet | |
| PBC SOW (27Jun25).docx | DOCX document | |
| PBC RPP (2July25).docx | DOCX document | |
| Attachment 6 Question and Answers_Consolidated v4 2July25.xlsx | XLSX spreadsheet | |
| Attachment 5 Price Template_CLIN_Structure2July25.xlsx | XLSX spreadsheet | |
| A007 - PBC SAR (27Jun25).pdf | ||
| PBC RPP (29May25).docx | DOCX document | |
| Attachment 2 PBC SOW (29May25).docx | DOCX document | |
| Attachment 1 OTA Terms and Conditions.docx | DOCX document | |
| A009 PBC QMS PP.pdf | ||
| A008 PBC Charger Logging Application.pdf | ||
| A007 PBC SAR.pdf | ||
| Attachment 4 Assertions and Other Applicable Clauses.docx | DOCX document | |
| A003 PBC TDP.pdf | ||
| A002 IMS.pdf | ||
| Attachment 6 Question and Answer Template.xlsx | XLSX spreadsheet | |
| Attachment 5 Price Template_CLIN_Structure.xlsx | XLSX spreadsheet | |
| Attachment 3 Perf Spec Rev 1 2025-04-02 for (PBC).pdf | ||
| A004 PBC FRACAS Reports.pdf | ||
| A001 PBC AgendasBriefs Meeting Minutes Reports.pdf | ||
| A005 PBC PQT Plan.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: |
| exhibit: |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: Platoon Battery Charger |
| ContractNum: |
| Contractor: |
| 1. DATA ITEM NUMBER: A006 |
| titleDataItem: Prototype Qualification Test (PQT) Report |
| subtitle: |
| 4. AUTHORITY (Data Acquisition Document Number): DI-NDTI-82326 |
| contractRef: SOW 1.0, 6.2, 6.22, 6.3, 6.4, 7.0 |
| reqOffice: PdM Soldier Maneuver Sensors |
| 7. DD 250 REQUIREMENT: DD |
| 8. APPROVAL CODE : N/A |
| 9. DISTRIBUTION STATEMENT REQUIRED: B |
| freq: Once/See Blk 16 |
| asOfDate: See Blk 16 |
| dateFirstSub: See Blk 16 |
| dateSubseqSub: See Blk 16 |
| 16. REMARKS: Block 4: The contractor shall prepare and submit a Prototype Qualification Test (PQT) Report in accordance with DI-NDTI-82326 as it relates to form, fit, and function and Operation Maintenance, Installation and Training. |
The following exceptions are taken to the referenced Data Item 2.a - Delete and replace with "Contractor format allowed."
3.1.d - Replace with "The item name is the Platoon Battery Charger."
3.1.f.5 - Delete.
3.3a. - Replace with "Contractor format allowed."
Block 12 & 13: The Contractor shall submit the PQT Report no more than 14 calendar days after the completion of PQT. The Government requires 14 calendar days to review, contractor has 7 calendar days to update the document and resubmit for approval based on Government comments.
Block 14: ADRL shall be electronically submitted. Contractors shall submit their data deliverables in accordance with the DD1423 to the Contracting Officer Representative (COR), via the DoD SAFE site https://safe.apps.mil
Microsoft Office 365 software or higher shall be used to create the required .xls, .ppt and .doc files. Adobe Acrobat Version 7.0 or higher shall be used to create .pdf files.
| Click to add continuation field for Remarks: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: |
| 15.TOTAL - Total draft copies is automatically calculated.: |
| 15.TOTAL - Total final regular copies is automatically calculated.: |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: |
| priceGrp: |
| estTotalPrice: |
| remarks: |
| preparedBy: |
| J. SIGNATURE: H. SIGNATURE |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| approvedBy: |
| Click to add additional data items.: |
| Click to delete additional data items.: |
File details come from the government source that posted it. Updated .