A003 CDRL_PFD TM_18 June 2019_Signed.pdf
PDF 240 KB Posted
- Attached to
- Parachutist Flotation Device (PFD)
- Solicitation number
- W911QY-20-R-0010_PFD
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _ _ TM _X _ OTHER _ __
D. SYSTEM/ITEM
Parachutist Flotation Device (PFD)
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM Technical Manual Field Maintenance Manual Including RPSTL for Parachutist Flotation Device (PFD) (1st, 2nd, and FRC Submissions)
3. SUBTITLE
TM 10-1670-XXX-23&P
4. AUTHORITY (Data Acquisition Document No.)
MIL-STD 40051-2C/MIL-STD 2361C
5. CONTRACT REFERENCE
Technical Publications (TP) Statement of Work (SOW)
6. REQUIRING OFFICE
AMSTA-LCS-E
7. DD 250 REQ
DD
9. DIST
STATEMENT
A
10. FREQUENCY
3 T
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
18 June 2019
13. DATE OF SUBSEQUENT
SUBMISSION See Block 16 Draft
Final Reg Repro
16. REMARKS
The FIRST SUBMISSION of the technical manual (TM) with Repair Parts and Special Tools List (RPSTL) shall be developed from Government review comments provided at the conclusion of DT/OT if selected. This submission shall be due 30 calendar days after receipt of Government review comments.
The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments concurrent with acceptance. This submission will be used to support the Logistics Demonstration (Log Demo).
The SECOND SUBMISSION of the TM shall be due 30 calendar days after the Log Demo. The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive review comments concurrent with acceptance. This submission will be used to support the Verification Conference.
The Verification Conference shall take place 45 days after Government's acceptance of the second submission.
A FINAL REPRODUCIBLE COPY (FRC) is due 30 days after Contractor's receipt of Government's master mark-up of TM resulting from the Verification Conference. The Government will review and determine acceptance or rejection of the submission within 15 days of receipt. If rejected, Contractor shall have 15 days to correct any errors and resubmit to the Government.
The First, Second, and FRC submissions may be delivered to the Government representative electronically. Each submission shall be sent with a letter of transmittal on Contractor letterhead with appropriate signature blocks completed and will be considered a draft until accepted by the Government.
AMSTA-LCS-E
1st Submission 1 1 2nd Submission 1 1
FRC 1 1
SFAE-SDR-SCIE
1st Submission 1 2nd Submission 1
FRC 1 1
15. TOTAL --------- 4 2 4
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
| 2019-06-18T09:49:24-0400 | |
| LONGLEY.DEBRA.ANNE.1398400026 |
| 2019-06-25T13:32:26-0400 | |
| LEON.DONNA.LEI.1057014586 |
File details come from the government source that posted it. Updated .