A001 CDRL CoC-MQ-4C-TSAS ANR-GNR_Troubleshoot Cable Set - PN 4106AS0481_0485.doc
DOC document 66 KB Posted
- Solicitation number
- N6833523R0082
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6833523R00820004 Amendment 0004 - Cancellation.pdf | ||
| SOW-MQ-4C-TSAS ANR-GNR_Troubleshoot Cable Set - PN 4106AS0481_0485-09Feb2023.docx | DOCX document | |
| N6833523R0082 TSAS Cable Sets Solicitation Conformed Copy.docx | DOCX document | |
| N6833523R00820003 Amendment 0003.pdf | ||
| N6833523R00820002 Amendment 0002.pdf | ||
| N6833523R00820001 Amendment 0001.pdf | ||
| N6833523R0082 TSAS Cable Sets Solicitation.docx | DOCX document | |
| Drawing Package 4106AS0481.docx | DOCX document | |
| Drawing Package 4106AS0485.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, JUN 09 PREVIOUS EDITIONS ARE OBSOLETE PAGE (1) OF (1) 10 June 2009
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPRVD OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category: TDP ( ) TM( ) Other ( XX )
D. System/Item
MQ-4C-TSAS, ANR-GNR & Troubleshoot Cable Set, PN 4106AS0481-1 & 4106AS0485-1 E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
A001
2. Title of Data Item
Test/Inspection Report
3. Subtitle
Certificate of Conformance (CoC)
4. Authority (Data ID No.)
DI-NDTI-80809B See Block 16
5. Contract Reference
SOW Para. 2.4
6. Requiring Office
NAVAIR LKE, UAS SE BR, BL24100
7. DD 250 REQ
LT
9. Dist. Statement Req.
N/A
10. Frequency
AS REQ
See Block 16
12. Date of first submission
As Req
14. Distribution
See Block 16
8. APPCODE
N/A See Block 16
11. As of Date
N/A
13. Date of Subsequent Submission
As Req
| Address |
| Draft |
| Reg |
| Repr |
| 16. Remarks |
| roger.ding.civ@us.navy.mil |
| Block 4: Contractor Format is acceptable. Use DI-NDTI-80809B for guidance. |
| Jeffery.a.glines.civ@us.navy.mil |
michael.a.moncayo.civ@us.navy.mil
Block 10: The Contractor shall provide a Certificate of Conformance (COC) with each shipment certifying that each item within the lot conforms to the government drawing package, this SOW, and the requirements of the contract. The COC shall be on company letterhead and signed by management. Each COC shall identify the part numbers and quantities delivered with each shipment.
Block 14: Delivery Media: Distribution of data shall conform to Electronic Media
Compatible with MS Word or MS-Excel or PDF. Certificate of Conformance (COC)
Certificates shall also be delivered to:
Roger Ding at roger.ding.civ@us.navy.mil
Jeffery Glines at Jeffery.a.glines.civ@us.navy.mil
Mike Moncayo at michael.a.moncayo.civ@us.navy.mil
TOTAL
G. Prepared By
Jennifer M. Etri H. Date
I. Approved By
Adam M. Smiga J. Date
| 17. Price Group |
| 18. Estimated Total Price: |
File details come from the government source that posted it. Updated .