A_-_Special_Provisions.pdf

PDF 165 KB Posted

Attached to
The Barn Exterior Deck and Ramp Installation
Solicitation number
2023-RFQ-095
Issued by
Cook County, Illinois

About this file

The document is a set of Special Provisions for the Barn Exterior Deck and Ramp Construction project for the Village of Schaumburg, Illinois. The project involves removing an existing deteriorated emergency access and replacing it with a new deck and ramp. The work includes selective demolition, excavation, concrete foundation installation, wood structural framing, composite decking, baluster and handrail installation, roofing, downspouts and gutters, painting, and landscape installation. The substantial completion date is set for June 15, 2024, with liquidated damages of $550 per day for each calendar day the project remains incomplete after the deadline.

The project is primarily funded through a Community Development Block Grant (CDBG) from the U.S. Department of Housing and Urban Development (HUD). The Village encourages Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) contractors to apply, with contractors required to provide HUD Form 2516 to document Minority Business Activity. The contract includes numerous federal requirements such as equal employment opportunity, Davis-Bacon wage standards, traffic control, accessibility standards, and compliance with various federal regulations. Contractors must demonstrate municipal construction experience, provide references, and be prepared to meet strict documentation and reporting requirements associated with the federal funding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS

INVITATION FOR BID

THE BARN EXTERIOR DECK AND RAMP CONSTRUCTION

Standards:

The following specifications and manuals supplement the contract documents:

• Village of Schaumburg Village Code, Chapter 151: Subdivision and Land Development, and addenda thereto.

• Village Ordinance No. 23-029: An Ordinance Granting Approval For Local Landmark Exterior Modification – Deck And Ramp Addition For The Barn (231 Civic Drive)

• “Manual on Uniform Traffic Control Devices for Streets and Highways” latest edition (hereinafter referred to as the Traffic Control Standard Specification).

• “Manual of Test Procedures of Material” latest edition.

• Where a contradiction occurs with any part or parts of the specifications, the most stringent requirement shall take precedence, as determined by the Village.

Project Funding:

A substantial source of funding for this project is Community Development Block Grant (CDBG) funds, which are federal funds awarded to the Village from the U.S. Department of Housing and Urban Development (HUD). The contractor shall comply with CDBG requirements and may be asked to provide additional information to the Village for compliance with HUD.

Project Description:

The following is a description of the improvements:

This project involves the removal of the existing deteriorated emergency access to be replaced with a new deck and ramp access. Work will include selective demolition and disposal;

excavation and, concrete foundation installation; wood structural framing; composite decking, baluster and handrail installation; roofing; downspouts and gutters, painting; and landscape installation as illustrated within the Barn Exterior Deck plans.

MBE/WBE:

MBE/WBE Contractors are encouraged to apply. Contractor should provide proof of MBE/WBE status. Regardless of MBE or WBE status, the Contractor shall provide HUD Form 2516 to denote Minority Business Activity for the Contractor and any Subcontractors. Form 2516 must be submitted prior to issuance of payment, Disadvantaged business enterprise (DBE) means an entity owned or controlled by a socially and economically disadvantaged individual as described by Public Law 102-389 (42 U.S.C.

4370d) or an entity owned and controlled by a socially and economically disadvantaged individual as described by Title X of the Clean Air Act Amendments of 1990 (42 U.S.C. 7601 note); a Small Business Enterprise (SBE); a Small Business in a Rural Area (SBRA); or a Labor Surplus Area Firm (LSAF), a Historically Underutilized Business (HUB) Zone Small Business Concern, or a concern under a successor program.

Labor surplus area firm (LSAF) means a concern that together with its first-tier subcontractors will perform substantially in labor surplus areas (as identified by the Department of Labor in accordance with 20 CFR part 654). Performance is substantially in labor surplus areas if the costs incurred under the contract on account of manufacturing, production or performance of appropriate services in labor surplus areas exceed 50 percent of the contract price.

Minority business enterprise (MBE) mean a business enterprise that is at least 51 percent owned by a minority group or groups including: a Disadvantaged Business Enterprise (DBE) other than a Small Business Enterprise (SBE), a Labor Surplus Area Firm (LSAF), a Small Business in Rural Areas (SBRA), or a Women's Business Enterprise (WBE).

Small business, small business concern or small business enterprise (SBE) means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding, and qualified as a small business under the criteria and size standards in 13 CFR part 121.

Women's business enterprise (WBE) means a business concern which is at least 51% owned or controlled by women. Determination of ownership by a married woman in a community property jurisdiction will not be affected by her husband's 50 percent interest in her share.

Similarly, a business concern which is more than 50 percent owned by a married man will not become a qualified WBE by virtue of his wife's 50 percent interest in his share.

False Information:

The Contractor is advised that providing false, fictitious, or misleading information with respect to CDBG funds may result in criminal, civil or administrative prosecution under 18 U.S.C. § 1001, 18 U.S.C. § 1343, 31 U.S.C. § 3729, 31 U.S.C. § 3801 or another applicable statute. The Contractor shall promptly refer to City and HUD’s Office of the Inspector General any credible evidence that a principal, employee, agent, subcontractor, or other person has submitted a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving CDBG funds. The Contractor shall ensure that contractual language in third party contracts enforces these provisions.

Access to Project Site and Records:

The Contractor will provide access to the City, HUD, the Comptroller General of the United States, or any of their duly authorized representatives to any books, documents, papers, and records of the contractor which are directly pertinent to that specific contract for the purpose of making audit, examination, excerpts, and transcriptions. Contractor will retain all required records for three years after final payments are made and all other pending matters are closed.

The Contractor will provide suitable access to the project site at all reasonable times during construction to the City, HUD, the Comptroller General of the United States, or any of their duly authorized representatives. Contractor shall also meet all reporting requirements to allow City to comply with the Federal Funding Accountability and Transparency Act of 2006 (Public Law 109–282).

Equal Employment Opportunity:

As this is a federal contract the contractor is required to abide by both the State and Federal Equal Employment Opportunity requirements. The Contractor shall abide by all Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor. All contracts and subcontracts entered into will contain the following equal opportunity clause:

During the performance of this contract, the contractor agrees as follows:

(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:

Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.

(3) The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor's legal duty to furnish information.

(4) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

(5) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

(6) The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

(7) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

(8) The contractor will include the portion of the sentence immediately preceding paragraph

(1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance.

Suspension and Debarment:

The Contractor certifies that neither it nor any person or firm who has an interest in the Contractor’s firm is a person or firm ineligible to be awarded Government contracts, contracts or participate in programs pursuant to 2 CFR Part 180.

The Contractor agrees that no part of this work shall be subcontracted to any person or parties listed on the government-wide Excluded Parties List System in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR Part 1986 Comp., p. 189) and 12689 (3 CFR Part 1989 Comp., p.

235). In addition, CONTRACTORs shall ensure that contractual language in third party contracts enforce this provision.

Subcontracting:

The Contractor shall take the following steps to ensure that, whenever possible, subcontracts are awarded to small business firms, minority firms, women's business enterprises, and labor surplus area firms described in Executive Orders 11625, 12432 and 12138, and 2 CFR part 200:

1. Placing qualified small and minority businesses and women's business enterprises on solicitation lists;

2. Assuring that small and minority businesses, and women's business enterprises are solicited whenever they are potential sources;

3. Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority business, and women's business enterprises;

4. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority business, and women's business enterprises; and

5. Using the services and assistance of the U.S. Small Business Administration, the Minority Business Development Agency of the U.S. Department of Commerce, and State and local governmental small business agencies.

Federal Funding Accountability and Transparency Act (FFATA):

Upon award and prior to construction, the contractor shall provide all information required for compliance with the Federal Funding Accountability and Transparency Act Subaward Reporting System. Information may include but is not limited to Federal Entity Identifier, amount of or revenue from U.S. federal contracts, subcontracts, loans, grants, subgrants, and or cooperative agreements, and compensation of executives.

Procurement of Recovered Materials:

The Contractor must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

Energy Efficiency:

The Contractor will comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation (42 U.S.C. 6201).

Anti-Lobbying:

For contracts in excess of $100,000, the Contractor certifies that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Further, the contractor agrees to disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award.

Clean Air Act:

For contracts in excess of $150,000, the Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).

Accessibility Requirements:

All buildings and residential structures designed, constructed, or altered is subject to the requirements of the Architectural Barriers Act of 1968 (42 U.S.C. 4151-4157) and shall comply with the Uniform Federal Accessibility Standards (appendix A to 24 CFR part 40 for residential structures, and appendix A to 41 CFR part 101-19, subpart 101-19.6, for general type buildings).

All facilities designed and constructed shall be readily accessible to and usable by individuals with disabilities. Further, the ADA requires the removal of architectural barriers and communication barriers that are structural in nature in existing facilities, where such removal is readily achievable—that is, easily accomplishable and able to be carried out without much difficulty or expense. (42 U.S.C. 12131; 47 U.S.C. 155, 201, 218 and 225)

Davis Bacon:

The Contractor will comply with all applicable standards, orders, or requirements of the Davis Bacon Act, as amended (40 U.S.C. 3141-3148) as supplemented by Department of Labor regulations (29 CFR part 5). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. (State prevailing wage rates required in these Specifications may be higher. Contractor and subcontractors shall pay whichever rate is higher.)

Upon award and prior to construction, the Contractor shall provide HUD Form 4720 to denote compliance with the wage decision. Any Subcontractors used shall also be required to submit HUD Form 4720.

Copeland Anti-Kickback:

The Contractor will comply with the Copeland "Anti-Kickback" Act (40 U.S.C. 3145) as supplemented in Department of Labor regulations (29 CFR part 3). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which it is otherwise entitled. The Contractor and each Subcontractor must submit a weekly statement on the wages paid to each employee performing on covered work during the prior week.

Contract Work Hours and Safety Standards:

Bidder will comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327A 330) as supplemented by Department of Labor regulations (29 CFR part 5). The contractor must compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

Section 3:

For contracts in excess of $200,000, the Contractor agrees to comply with HUD’s regulations in 24 CFR part 75, which implement Section 3. As evidenced by the submission of their bid, the

Contractor certifies that they are under no contractual or other impediment that would prevent them from complying with the regulations. Noncompliance with HUD's regulations in 24 CFR part 75 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.

The Contractor agrees to include contract provisions requiring compliance with Section 3 in any subcontracts issued in association with this project and agrees to take appropriate action upon a finding that the subcontractor is in violation of the regulations in 24 CFR part 75. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR part 75.

Project Timing:

Construction is scheduled to begin upon the proper execution of the contract documents, which includes the submission of insurance and bonds and approval from HUD. The substantial completion date, including all work, is June 15, 2024.

The final completion for all other ancillary work, including landscaping restoration or plantings, not including any additional work, shall be completed and ready for final acceptance and payment on or before June 15, 2024. Failure to comply with the deadlines for the substantial completion and final completion shall result in the enforcement of liquidated damages in the amount of $550.00 per day for each and every calendar day that these improvements remain incomplete, in accordance with the Special Provision, "Liquidated Damages", and Sections 108.05 and 108.09 of the Standard Specifications.

Construction Schedule:

At the project pre-construction meeting, the Contractor shall submit for review and approval by the Village, a detailed construction schedule that shall clearly indicate the sequential procedure of work proposed to be followed to complete the work as required by the contract documents.

In preparing the construction schedule, the Contractor shall follow the required completion date, calendar days, and any additional Special Provisions as specified relating to the construction schedule.

The construction schedule shall depict all work components and essential activities, the time required for the completion of each of the activities and the sequence and interdependence of each of the activities in a project timetable which will translate each project day into an ordinary calendar day. The Contractor shall maintain the construction schedule, and shall submit an updated schedule to the Village on a weekly, biweekly, or monthly basis as determined by the Village. No separate payment will be made to the Contractor for the creation and maintenance of the construction schedule.

Due to Special Events throughout the Village of Schaumburg, holidays and the schedule of local school districts, the Contractor will be restricted from working at or near specified locations as instructed by the Village or a representative of the Village. No separate payment or compensation will be made due to these restrictions.

The Village provides the public with construction schedules and project status through the Village’s web page. The Contractor shall provide construction related information in a format consisting of an E-mail, letter, or fax acceptable to the Village. The Contractor shall assume that this information shall be provided on a weekly basis during construction and may change to a shorter time frame based on construction activity changes or a longer time frame based on construction inactivity. The Village shall determine the time frame and format to be provided by the Contractor.

Liquidated Damages:

Should the Contractor fail to complete the work, including cleaning up, to the point of final acceptance of the work by the Village within the time specified in the Contract Documents for the Date of Completion and/or Date(s) of Substantial Completion, and agreed upon by the Contractor by accepting the Contract, or within such extra time as may be allowed in accordance with the Contract Documents, there shall be deducted from any monies due the Contractor, or that may become due the Contractor, the sum(s) of $550.00 per day for each and every calendar day, including Sundays and holidays, that the work remains uncompleted.

This sum shall be considered and treated not as a penalty but as fixed, agreed, and liquidated damages due the Village from the Contractor by reason of inconvenience to the public, added cost of supervision, and other items which may have caused an expenditure of funds resulting from his failure to complete the work within the time specified.

The Village shall charge the Contractor, and may deduct from partial and final payments for the project, for all Engineering and Inspection expenses incurred by the Village in connection with any work accomplished after the Date of Completion as specified in the Contract Documents.

Permitting the Contractor to continue and finish the work, or any part of it after the time fixed for its completion, or after the date to which the time of completion may have been extended, shall in no way operate as a waiver on the part of the Village of any of its rights under the Contract.

Utility Location:

The Contractor must exercise extreme caution while working around existing utilities. The Contractor shall notify JULIE (1-800-892-0123), a minimum of 48 hours before commencing construction for utility locations within the scope of the project. It is recommended that the Contractor conduct a joint utility meeting. It is the responsibility of the Contractor to contact all agencies who may or may not be part of the JULIE system to verify the location of their facilities.

The Village does not guarantee the accuracy or completeness of this information. The Contractor shall make his own investigation to determine the existence, nature, and location of all utility lines and appurtenances within the limits of the improvement. The Contractor shall locate all utilities far enough in advance to avoid all conflicts in grade separation between existing utilities and the proposed improvements. If the Contractor encounters a conflict between the proposed improvements and existing utility that was not located in advance by the Contractor, then the Contractor shall, at no cost to the Village, relocate the proposed improvements and/or the utility to avoid the conflict.

The Contractor will be required to cooperate with all utility companies involved in connection with the removal, temporary relocation, reconstruction, or abandonment by these companies of any and all services or facilities owned or operated by them within the limits of this improvement.

Before doing any work which will damage, disturb, or leave unsupported or unprotected any utility lines, or appurtenances encountered, the Contractor shall notify the respective Owner thereof, who will make all arrangements for relocating, adjusting, or otherwise maintaining or abandoning service on lines that fall within the limits of the proposed construction without cost to the Contractor. After such arrangements have been made, the Contractor will proceed with the work as directed by the Village. All utility lines and appurtenances which are abandoned by the Owner shall be removed and disposed of by the Contractor.

No extra compensation will be allowed to the Contractor for any expense incurred by complying with these requirements or because of delays, inconvenience, or interruptions in his work resulting from the failure of any utility company to adjust, remove, relocate, reconstruct, or abandon their services. The Contractor shall be responsible for prompt and timely adjustment, removal, relocation, reconstruction, or abandonment of their facilities by all utility companies involved, and the coordination of his own work with that of these companies to the end that work on this improvement is not delayed because of necessary changes in the existing utilities, public or private.

Construction Operations:

In order to minimize the effect of construction noise on the area surrounding the improvement, the Contractor and his subcontractors shall comply with the following requirements. Any changes to this schedule will not be accepted unless approved by the Village.

• All engines and engine-driven equipment used for hauling or construction shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive or unusual noises. Any machine or device or part thereof which is regulated by or becomes regulated by Federal or State of Illinois noise standards shall conform to those standards.

• Construction operations shall be confined to the daylight hours between 7:00 AM and 5:00 PM Monday through Saturday. No work of any kind shall be done on Sundays in residential areas unless previously approved by the Village. These time restrictions shall not apply to maintenance or operation of safety and traffic control devices such as barricades, signs, and lighting, or to construction of an emergency nature. If the Contractor requires additional time to complete a portion of the work on any given day or if he foresees the need to work extended hours for a number of days to comply with the construction schedule, he must receive the approval of the Village.

• The Contractor shall take all precautions necessary to protect the general public and his employees from hazardous locations that might occur within the limits of the improvement. The Village is not responsible for site safety. The Bidder is solely and exclusively responsible for construction means, methods, technologies, and site safety.

• It shall be the Contractor’s responsibility to protect open excavations as may be required by OSHA, Illinois Department of Labor, State, or Federal Law. Trenches in pavements or in close proximity to the improved streets or roadways shall be sheeted or braced in a substantial and effective manner. Sheeting may be removed after backfilling has been completed to such an elevation as to permit its safe removal. Sheeting and bracing left in place must be removed for a distance of 3 feet below the established street grade. The cost of furnishing, placing, and removing sheeting and/or bracing shall be incidental to construction and included in the contract unit price for the work being done.

• The Contractor shall schedule and conduct his operations so that the closure time of existing driveways in the area of work is kept to a minimum. The Contractor shall make every effort to keep driveways open.

• Beginning on the date that the Contractor begins work on this project, he shall assume responsibility for normal traffic control and protection for this work as required for standard project work. The work involved for traffic control will not be paid for in unit pricing or any other means outside of the lump sum price, unless otherwise specified elsewhere in these Special Provisions.

• The Village reserves the right to add or delete quantities from any of the items within these contract documents.

Removal of Miscellaneous Items:

Regarding the removal and disposal of any existing structures, foundations, footings, or other miscellaneous items which may interfere with the construction operations, the Contractor shall, with the approval of the Village, remove and dispose of these items outside the limits of the right-of-way at locations provided by him, the work shall be considered as incidental to the Contract.

Root Pruning, Shrub and Tree Trimming:

This item of work shall be in accordance with Section 201 of the Standard Specifications, except as herein modified, and shall be considered incidental to the contract. Roots of existing trees and bushes in areas affected by construction activity shall be pruned. To prevent the tearing of roots during removal and excavation operations, roots shall be pruned around all trees and bushes prior to commencement of these operations, as directed by the Village, which shall be pruned along the work area as a minimum. Pruning shall be accomplished at 6 to 12 inches behind the proposed work, to allow roots to grow back into undisturbed soils and prevent direct exposure to air and subsequent dieback. Actual locations of any equipment to be used for root pruning shall be as agreed upon by the Village’s Forestry Representative and the Village.

Root pruning, shrub and tree trimming shall be coordinated with the Village’s Forestry Representative and the Village prior to completing such work. This work shall be performed by a qualified Contractor and shall be considered incidental to the contract.

Construction Layout:

The Contractor shall provide and set all necessary horizontal control, vertical control, alignments, and line and grade stakes for the project. Improvements shall be constructed as specified or otherwise directed by the Village.

The Contractor shall be responsible for any mistakes or errors arising from the tampering with or removal of any stakes and shall take proper care in the preservation of such stakes and marks.

The Contractor is required to come out to the site as many times as necessary to set and/or re-set all necessary line and grade stakes to complete these improvements.

This work shall be considered incidental to the removal and installation contract items of work.

Inspection:

All phases of the improvements will be subject to inspection by representatives of the Village’s Engineering and Public Works Department, Community Development Department, or Village authorized Consulting Company. Projects will not be accepted by the Village without the final approval of the Village’s Community Development Department.

The Contractor shall be bound by these specifications and by all Village ordinances and codes.

Dust Control:

The Contractor shall at all times maintain proper dust control at the site. The Contractor shall water the entire site whenever the site conditions become unsafe due to blowing soil or dust.

The site shall be watered as many times per day as necessary to maintain a safe work site, as determined by the Village. This work shall be considered as incidental to the costs of these improvements.

Housekeeping:

These improvements are located in fully developed residential areas. It is imperative that the Contractor minimize the disturbance to these residents during construction.

The jobsite shall always be maintained with a neat and orderly appearance. Materials, equipment, and tools no longer needed shall be removed or relocated in a timely manner. The Contractor shall complete removal or cleanup of items requested by the Village within 24 hours unless otherwise specified.

Work shall progress in a timely fashion, and streets shall not remain in a blocked state for long periods of time. Required timelines for access restoration, progress of work, backfilling, and restoration are detailed throughout these specifications.

A housekeeping deduction in the amount of $750 per day may be assessed at the discretion of the Village, if at any time the Village deems the Contractor is not meeting the required timelines for housekeeping requests, access restoration, progress of work, backfilling, restoration, and other items as detailed in these specifications. This deduction will be applied to the next pay estimate due the Contractor.

Protection of Existing Drainage Facilities during Construction:

The existing drainage facilities shall remain in use during the period of construction. All drainage structures are to be kept free of any debris resulting from the construction operations.

Any accumulation of debris in the drainage structures resulting from construction operations shall be removed at the Contractor's own expense, and no extra compensation will be allowed.

The Contractor shall take the necessary precautions when working near or above existing sewers in order to protect these pipes during construction from any damage resulting from his operations. All work and material necessary to replace existing sewers damaged because of noncompliance with this provision shall be as directed by the Village, in accordance with the Standard Specifications, at the Contractor's own expense. No extra compensation will be allowed.

Sawing Pavement:

This work shall be performed at locations shown on the plans or as directed by the Village. The Contractor shall cut the joint between the portion to be removed and that to be left in place with a sawing machine to prevent spalling when the item is broken out. This work shall be done in a manner that a straight and perpendicular joint will be secured. All saw cutting shall be to the full depth of the pavement to be removed.

After saw cutting, the Contractor shall immediately remove all concrete or asphalt slurry from the work area, specifically from the pavement which is to remain in place. When the concrete or asphalt slurry is wet, it creates a slippery and hazardous condition. In addition, if the concrete or asphalt slurry is allowed to dry, it creates an unsightly aesthetic appearance. In the event the concrete or asphalt slurry is not removed immediately and the concrete or asphalt slurry cures and adheres to the adjacent surface, the Contractor shall remove and replace the portion with concrete or asphalt slurry to the satisfaction of the Village. No additional compensation will be allowed for removal of the slurry or removal and replacement of the adjacent area due to slurry which was not immediately removed from the adjacent area.

It is the Contractor’s responsibility to determine the thickness of the existing item to be removed and whether or not it contains reinforcement.

This work shall be considered incidental to the contract and the items to be removed. No additional compensation will be allowed for sawing reinforcement.

Material Inspection:

The local agency shall be responsible for the quality assurance field inspection. The Village shall be notified at least 24-hours in advance of the placement of any Portland cement concrete for foundations or footings. The Contractor shall allow the inspector access to his plant area to observe the operations and take material samples as required.

The Contractor shall be responsible for quality control inspection. For Portland cement concrete mixtures, attention is directed to Recurring Special Provision 25, “Quality Control/Quality Assurance of Concrete Mixtures”.

This work shall be considered incidental to the contract and to the Portland cement concrete items to be placed.

Earthwork:

This work consists of the grading, cutting and filling of earth material at various locations within the project limits for the installation of the foundations and landscape as indicated on the approved plans and cross sections. Surplus, unstable, unsuitable, and organic material shall be disposed of in accordance with applicable portions of Section 202 of the Standard Specifications.

Traffic Control and Protection, Special:

Traffic control shall be in accordance with the applicable portions of Section 701 and 703 of the Standard Specifications, the Supplemental Specifications, the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, any special details and Highway Standards contained in the plans, and the Special Provisions contained herein.

No adjustment in the bid unit price will be allowed due to an increase/decrease of furnishing traffic control devices and labor to install them.

The Contractor shall maintain traffic in accordance with the applicable portions of Articles

107.09 and 107.14 of the Standard Specifications.

The Contractor shall contact the Village at least 72 hours in advance of beginning work.

This work shall be paid for at the contract Lump Sum price, which shall include, but not be limited to, furnishing, placing, maintaining, and removing all traffic control devices, including detours, all lane closures, all signs, barricades, cones, flaggers, arrow boards, and incidentals required to implement safe traffic control as specified herein, and as directed by the Village, for all of the programs and/or projects included within these contract documents unless otherwise specified. Lump Sum price also includes all subsequent removal of traffic control devices.

Maintenance of Roadways:

Beginning on the day that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all cleaning and repair work deemed necessary by the Village, but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Village.

Driveway Access:

The Contractor shall, where required by the Village, provide immediate access to driveways and intersecting streets. The Contractor shall at all times provide access for emergency vehicles during the time of construction.

Testing of Rejected Soils:

In the event that soils are rejected by the CCDD facility chosen by the contractor, the material must be tested. The work includes all material, labor, equipment, temporary storage, handling (Public Works facilities cannot be used) and all other costs required to remove, transport, and test the rejected material.

Testing shall be completed by a third-party firm in accordance with Summary of Maximum Allowable Concentrations of Chemical Constituents In Uncontaminated Soil Used as Fill Material at Regulated Fill Operations (35 Ill. Adm. Code 1100.Subpart F) and Supplemental Section hereon referred to here as MAC TABLES and found at:

• http://www.epa.state.il.us/land/ccdd/new-max-allowable-concentrations-table.pdf

• http://www.epa.state.il.us/land/ccdd/supplemental-mac-table.pdf including as applicable, an analysis by TCLP/SPLP methods.

Documentation and notification shall be provided to the Village.

Any tests that do not reveal the presence of contaminants above MAC TABLES standards will not be eligible for payment.

Removal and Disposal of Non-Hazardous Special Waste: In the event that Testing of Rejected Materials reveals the presence of contaminants above MAC TABLES limits, this work includes disposal of this material at a Non-Hazardous Special Waste Site or appropriate facility, including all material, labor, equipment, temporary storage and all handling (Public Works facilities cannot be used) required to remove, transport, and dispose of all Non-Hazardous Special Waste or Certified Non-Special Waste. Includes all fees or charges associated with disposal including any additional testing. Include any testing required for disposal not previously completed.

Provide documentation and notification to the Village.

http://www.epa.state.il.us/land/ccdd/new-max-allowable-concentrations-table.pdf http://www.epa.state.il.us/land/ccdd/supplemental-mac-table.pdf http://www.epa.state.il.us/land/ccdd/supplemental-mac-table.pdf

Contractor Qualifications: Upon request, the Contractor shall:

• Submit at least three (3) references of recent municipal construction work; Municipality, Name and Title of Project Coordinator, Amount of Contract (or if a subcontractor, amount of work performed).

• Verify that they have five or more years of municipal construction experience.

• Provide owner information necessary (including race/ethnicity) for HUD’s Contract & Subcontract Activity Report

SPECIAL PROVISIONS INVITATION FOR BID
No adjustment in the bid unit price will be allowed due to an increase/decrease of furnishing traffic control devices and labor to install them.